Develop second swimming quarry to relieve pressure on existing swimming quarry. Construct T-dock access platform, a cantilevered access platform, informational and safety signage, restroom, picnic shelter and landscaping.
This project will reduce sediment to the Minnesota River, control erosion and reduce sedimentation in a local DNR Protected Water and protect private land and public infrastructure. The County Road (CR) 6 ravine (Quarry Creek) cuts through the Minnesota River valley bluff in Blakeley Township. Active channel incision and erosion within the ravine has caused large amounts of sediment to be deposited under the bridge at CR 6 such that the road is frequently flooded and sediment has to be removed several times a year.
Acquire approximately 39.5 acres adjacent to the existing 643-acre Quarry Park and Nature Preserve and the DNR's 300-acre Quarry Park SNA. This key acquisition will open up a southern entrance serving the rapidly expanding St. Cloud metro area.
This project is a documentary film about the intercultural experiences of immigrants living in Minnesota. It features footage of live performances at the Southern Theater, followed by talkbacks with cultural leaders and scholars; and the voices of audience and community members, recorded in post-performance conversations and interviews.
We will characterize environmental drivers contributing to the decline of wild rice using lake sediment cores to reconstruct historical wild rice abundance in relation to lake and watershed stressors.
The College of Saint Benedict and Saint John's University (CSB+SJU), in partnership with the University of Minnesota Morris (UMM), will collect and analyze archival records and oral testimonies on Native American boarding schools in order to develop educational materials that promote truth and healing. The project includes: 1) archival research; 2) oral testimonies; 3) developing curricular materials from these archival and oral records.
Development of regional trail master plans for the Southern Scott Regional Trail Search Corridor (from Cedar Lake Farm to Cleary Lake Regional Park) and the Louisville Regional Trail Search Corridor including consulting services to prepare the master plans and facilitate a public engagement process.
To hire qualified professionals to rebuild the chancel wall in the Episcopal Church of the Good Samaritan, listed in the National Register of Historic Places.
In the North Fork Crow River Watershed, land use is mainly row crop agriculture with an extensive drainage system. Many of the existing tile lines have open intakes that transport sediment and nutrients to open ditches that drain to the North Fork Crow River. The river flows into Rice Lake which has elevated phosphorus levels. Studies show a major source of phosphorus loading comes from animal manure. Field applied manure has potential to runoff to open tile intakes being a direct path to surface water.
Rice Lake, in Stearns County, is an impaired water for nutrients that has a Total Maximum Daily Load (TMDL) Implementation plan developed. Rice Lake is one of the larger lakes in the county, offering major water recreation opportunities, economic benefits as well as fish and wildlife habitat. It is a priority for Stearns County to implement projects that have positive impacts on this resource.
This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 25 easements have been recorded for a total of 672.1 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 1,152.4 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
Under the CREP partnership with USDA, 28 easements were recorded on a total of 2,390 acres to restore previously drained wetlands and adjacent uplands. Two easements are RIM wetland easements that were required to complete wetland restoration work on an adjacent easement secured with 2018 Wetlands funding. The landowners received the RIM-Only payment rate. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for landowner payments and conservation practices.
This continuation of the Reinvest in Minnesota (RIM) Reserve buffers program will protect and restore riparian areas, permanently protecting approximately 600 acres on 17 easements. This program will continue utilizing a science-based ranking and selection process and be implemented locally, working with Soil and Water Conservation District (SWCD) staff in targeted areas in the state. Historically, buffer funding was used to expand basic water quality buffers into larger buffers.
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Riparian Buffer Easement Program targets creating buffers on riparian lands adjacent to public waters, except wetlands. Through the Reinvest in Minnesota Program (RIM) and in partnership with Soil and Water Conservation Districts and private landowners, permanent conservation easements are purchased and buffers established.
Develop outdoor recreation facilities including a nature study/observation area, roads and trails, information boards and signs. Park includes shoreline adjacent to the Mississippi Wild & Scenic River. The new trails will provide safety and accessibility along the bluff line overlooking the river and prevent erosion caused by existing, informal earthen trails.
To hire a consultant to complete a publicly available, digital-audio tour of the city's historically significant Mississippi River built environment based on recommendations in a Community Education and Marketing Plan.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.