Develop second swimming quarry to relieve pressure on existing swimming quarry. Construct T-dock access platform, a cantilevered access platform, informational and safety signage, restroom, picnic shelter and landscaping.
Acquire approximately 39.5 acres adjacent to the existing 643-acre Quarry Park and Nature Preserve and the DNR's 300-acre Quarry Park SNA. This key acquisition will open up a southern entrance serving the rapidly expanding St. Cloud metro area.
We will characterize environmental drivers contributing to the decline of wild rice using lake sediment cores to reconstruct historical wild rice abundance in relation to lake and watershed stressors.
The College of Saint Benedict and Saint John's University (CSB+SJU), in partnership with the University of Minnesota Morris (UMM), will collect and analyze archival records and oral testimonies on Native American boarding schools in order to develop educational materials that promote truth and healing. The project includes: 1) archival research; 2) oral testimonies; 3) developing curricular materials from these archival and oral records.
To hire qualified professionals to rebuild the chancel wall in the Episcopal Church of the Good Samaritan, listed in the National Register of Historic Places.
In the North Fork Crow River Watershed, land use is mainly row crop agriculture with an extensive drainage system. Many of the existing tile lines have open intakes that transport sediment and nutrients to open ditches that drain to the North Fork Crow River. The river flows into Rice Lake which has elevated phosphorus levels. Studies show a major source of phosphorus loading comes from animal manure. Field applied manure has potential to runoff to open tile intakes being a direct path to surface water.
Rice Lake, in Stearns County, is an impaired water for nutrients that has a Total Maximum Daily Load (TMDL) Implementation plan developed. Rice Lake is one of the larger lakes in the county, offering major water recreation opportunities, economic benefits as well as fish and wildlife habitat. It is a priority for Stearns County to implement projects that have positive impacts on this resource.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
Using the Reinvest in Minnesota (RIM) program, this project addressed the potential loss of grassland habitats from conversion to cropland and accelerate grassland protection efforts not covered by other programs. Focusing on Minnesota Prairie Plan-identified landscapes and working in coordination with established Prairie Conservation Plan Local Technical Teams (LTTs), this project fulfilled the accomplishment plan goal of enrolling 710 acres of grassland habitat in permanent conservation easements by completing more easements than estimated, for a total of 13 easements.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 25 easements have been recorded for a total of 672.1 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 1,152.4 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
Under the CREP partnership with USDA, 28 easements were recorded on a total of 2,390 acres to restore previously drained wetlands and adjacent uplands. Two easements are RIM wetland easements that were required to complete wetland restoration work on an adjacent easement secured with 2018 Wetlands funding. The landowners received the RIM-Only payment rate. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for landowner payments and conservation practices.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 84 easements have been recorded for a total of 1,441 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 2,793.2 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
Using the Reinvest in Minnesota (RIM) program, this project addresses the potential loss of grassland habitats from conversion to cropland and accelerates grassland protection efforts not covered by other programs. Working in coordination with 11 established Prairie Conservation Plan Local Technical Teams (LTTs), and local SWCDs this proposal will enroll 936 RIM acres (approximately 12 easements), focusing on Minnesota Prairie Plan identified landscapes.
Develop outdoor recreation facilities including a nature study/observation area, roads and trails, information boards and signs. Park includes shoreline adjacent to the Mississippi Wild & Scenic River. The new trails will provide safety and accessibility along the bluff line overlooking the river and prevent erosion caused by existing, informal earthen trails.
To hire a consultant to complete a publicly available, digital-audio tour of the city's historically significant Mississippi River built environment based on recommendations in a Community Education and Marketing Plan.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.
Rock Soil and Water Conservation District will collect water quality and chemistry parameters on eleven Minnesota Pollution Control Agency (MPCA) approved stream sites within the Missouri Basin during the 2022-2023 sampling seasons. The sites will be monitored according to MCPA’s Intensive Watershed Monitoring Approach Standard Operating Procedures. The goal of this project will be to accurately gather water quality samples and data as part of an organized multi county effort. Complied sample results will determine surface water quality conditions within the Missouri Basin.
To restore Rock County Fair's Floral Hall. Built in 1911 and listed on the National Register of Historic Places, Rock County Fair will restore its interior. Funding will not only preserve this historic building, but also create an enhanced space to showcase regional artwork.
To provide an outdoor performance and demonstration space in the highest traffic area of the fairgrounds, which is located between the 4-H Exhibit, Open Class Exhibit, and the Rock County Historical Society Exhibits buildings. The fair plans to hold Dutch Oven cooking demonstrations, Buffalo Days celebrations, and dance performances in this area.