Water control structures and dikes were designed and constructed on six Wildlife Management Areas (WMA) in the counties of Becker, Clearwater, Itasca, Lincoln, Roseau, and Yellow Medicine. Dike work at Roseau River WMA protects and enhances 3200 acres of wetlands wetlands in Pool 2 of the WMA. Roseau River WMA has 10 large water control structures, seven moist soil cells, and four large pools covering 11,800 acres. Cells for a moist soil unit were constructed at Lac Qui Parle WMA in Lac Qui Parle County.
We protected 22.3 miles of trout streams and 1.3 miles of lakeshore via easements (585 acres in total), and 7.4 miles (504 acres) of lakeshore through fee-title purchase. We enhanced shoreline habitat on 524 acres of riparian land, and instream habitat on 3.1 miles of trout streams and 0.5 miles of warmwater rivers.
This appropriation funded 283 projects totaling 21,953 acres. The two largest types of enhancement were 112 woody removal projects totaling 10,160 acres and 134 prescribed burns totaling 10,082 acres. Additionally, we seeded 30 sites totaling 1386 acres, put in infrastructure for conservation grazing of 236 acres on 3 sites, conducted 3 oak savanna enhancements totaling 42 acres, and treated 47 acres of invasive species on 2 sites.
To increase access to arts and cultural heritage programming at the Todd County Fair by enhancing a stage, improving the fine arts display area, hosting an array of demonstrations, and featuring an Irish band and theater group.
Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 13 local governments with funds to complete 143 projects. More information is available in the detail reports below.
This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.
This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.
This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.
This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans.
This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.
This project will develop and execute three point source related scenarios for the Chippewa River watershed using an existing HSPF watershed model. This project will also support the review of the HSPF Modeling Guidance Document.