State leadership for the 4-H Shooting Sports & Wildlife Program, including staff and 4-H volunteer committee members, will provide a menu of equipment options for local programs to choose from as a means to build their Shooting Sports & Wildlife project. Local programs will submit a grant application justifying how the new equipment will help them build and grow their program, attract and engage new audiences, and provide sustainability in their local chapter.
This project, entitled Sing Again, aims to preserve Somali lullabies, originally passed generation to generation through oral tradition, by transcribing them in children's lullaby book and creating website for resource-sharing and archival so that future generations of children can use them.
The Children's Discovery Museum in Grand Rapids will build on recent enrollment momentum and further increase participation with its School Service Program, which takes down the economic barriers for visiting school groups. The Legacy grant will fund more educators and facilitators, curriculum development, scholarship aid, transportation assistance, art and teaching supplies, and the addition of a new exhibit to the museum.
The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program FORTRAN (HSPF) model for the Snake River Watershed in the Red River Basin. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.
Continue and finalize watershed models using Hydrologic Simulation Program FORTRAN (HSPF) for the Grand Marais Creek and Snake River Watersheds and complete the calibration/validation process.
The goal of this project is to utilize the information and data collected in the Phase I project to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase II project will allocate pollutant reductions goals, and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.
This project will result in the completion of the first phase of the Watershed Restoration and Protection Strategy (WRAPS) for the Snake-Middle River Watershed.
The goal of this project is to utilize the information and data collected in the Phase 1 project to develop a Watershed Restoration and Protection Strategy (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality impairments and maintain or improve water quality throughout the Snake-Middle River Watershed. The Phase 2 project will allocate pollutant reductions goals and prioritize and identify implementation strategies to maintain or improve water quality in key streams in the watershed.
Clean well 228834 to decrease draw down and bring capacity of well back to normal range. Pull well pump and televise well, Jet well casing and screen, jet and chlorinate well, final televising and set up well pump