All Projects

681 Results for
Recipient
Pomme de Terre River Association JPB
2014 Fiscal Year Funding Amount
$274,816
Fund Source

The goal of the Pomme de Terre River Association (JPB) is to improve local water resources within the watershed through targeted voluntary efforts and build strong relationships with local landowners, producers, and citizens. Utilizing the State's first Watershed Restoration and Protection Strategy, the JPB has targeted and identified specific areas and activities required for marked water quality improvement.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Tere River Association
2017 Fiscal Year Funding Amount
$46,133
Fund Source

The Pomme de Terre River Association will partner with the Minnesota Pollution Control Agency to conduct water quality monitoring in the Pomme de Terre River Watershed. The purpose will be to determine if waters meet the states non-point source pollution standards. The data collected will be utilized to produce the cycle two Watershed Restoration and Protection Strategy (WRAPS) report and supporting documents for the watershed. Through the utilization of this funding a total of 11 lakes and 7 stream reaches will be assessed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association
2017 Fiscal Year Funding Amount
$52,000
Fund Source

This project will establish a framework with the Pomme de Terre River Association (PDTRA), county staff, Soil and Water Conservation District staff, and state agencies that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Pomme de Terre River watershed. This work will form the basis to establish restoration and protection strategies that local governments and watershed organizations can use to make decisions that will lead to protecting and restoring the waters in the watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$19,996
Fund Source

The goal of this project is to extend through 2016, calibrate, and validate the existing watershed model using Hydrological Simulation Program FORTRAN (HSPF) for the Pomme de Terre River Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) studies.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Stevens Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$132,120
Fund Source

Certain stretches of the Pomme de Terre River have been identified as impaired. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the impaired stretches to an acceptable level. It will also identify strategies that would improve water quality in these impaired stretches. Some funds will support public input activities into the Pomme de Terre River watershed management plan.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association JPB
2016 Fiscal Year Funding Amount
$115,248
Fund Source

The goal of the Pomme de Terre River Association (PDTRA JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. To further our efforts in strategically working to achieve our reduction goals, listed in our Major Watershed Restoration and Protection Strategies Report and Turbidity Total Maximum Daily Load report, we would like to further define our Priority Management Zones through the development of a hydrological conditioned Digital Elevation Model.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Emmons & Olivier Resources, Inc.
2013 Fiscal Year Funding Amount
$2,034
Fund Source

The goal of this project is to respond to public comments on the Pope County Eight Lakes TMDL and make appropriate changes where necessary.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Emmons and Olivier Resources, Inc. (EOR)
2011 Fiscal Year Funding Amount
$25,443
Fund Source

This project will develop feasibility analysis, a drawdown plan for Malmedal Lake and an analysis of available options for fish barriers in the watersheds of Malmedal Lake and Strandness Lake.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
University of Minnesota: Sponsored Projects Administration
2016 Fiscal Year Funding Amount
$5,000
Fund Source

This project will develop and present to the MN association of townships on stormwater best management practices and National Pollutant Discharge Elimination System (NPDES) stormwater permits.

Statewide
Recipient
RESPEC
2019 Fiscal Year Funding Amount
$41,740
Fund Source

This project will create a section on pretreatment settling practices in the Minnesota Stormwater Manual. The result will include case studies on pretreatment settling practices.

Statewide
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Becker
Cass
Clay
Grant
Mahnomen
Norman
Otter Tail
Traverse
Recipient
Minnesota Department of Health
2020 Fiscal Year Funding Amount
$750,000
2019 Fiscal Year Funding Amount
$400,000
2018 Fiscal Year Funding Amount
$400,000
2017 Fiscal Year Funding Amount
$325,000
2015 Fiscal Year Funding Amount
$325,000
2014 Fiscal Year Funding Amount
$325,000
Fund Source

This project aims to ensure private wells are a safe source of drinking water, are tested regularly, and water quality issues are addressed.

Statewide
Recipient
Minnesota Management and Budget
2020 Fiscal Year Funding Amount
$29,214
Fund Source

This project will result in a series of classes (provided by Minnesota Management and Budget's Enterprise Talent Development) to train the Minnesota Pollution Control Agency's Watershed Division to more effectively and efficiently manage watershed projects.

Statewide
Recipient
Douglas Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$133,939
Fund Source

A family dairy farm in the shoreland area of Lake Miltona has a liquid manure storage area that is not up to standards due to sandy soil and a high water table, increasing the likelihood of groundwater contamination. Lake Miltona is connected to the Alexandria Area Chain of Lakes and ultimately the water ends up in the Long Praire River. Groundwater impacts to the Long Prairie River have the potential to be significant.

Douglas
Recipient
Douglas Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$13,050
Fund Source

Lake Miltona is considered one of the finest lakes in Central Minnesota and its 15 miles of lake shore make it the largest lake in Douglas County. Smokey Timbers Youth Camp, owned by the Smokey Timbers Foundation, is located on the north side of Lake Miltona. There is currently an erosion problem at the camp where a large gully has developed that drains into the lake.

Douglas
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$1,500,000
2015 Fiscal Year Funding Amount
$1,500,000
2016 Fiscal Year Funding Amount
$940,000
2017 Fiscal Year Funding Amount
$1,060,000
2018 Fiscal Year Funding Amount
$50,000
2019 Fiscal Year Funding Amount
$1,950,000
2020 Fiscal Year Funding Amount
$300,000
2021 Fiscal Year Funding Amount
$1,180,000
2022 Fiscal Year Funding Amount
$270,000
2023 Fiscal Year Funding Amount
$1,200,000
Fund Source

This will fund a competitive grant program for sewer projects that will help protect or restore the water quality of waters in national parks located within Minnesota.

Statewide
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$7,469
Fund Source

This project is for technical assistance during the Lake Winona Nutrient Total Maximum Daily Load (TMDL) public notice and revisions to the document prior to sending to the Environmental Protection Agency (EPA) for final approval.

Douglas
Recipient
Laura Phillips-Mao
2016 Fiscal Year Funding Amount
$3,400
Fund Source

The goal of this project is the development of a model of wild rice population dynamics, using RAMAS software, which mimics natural variability of population levels and calculates the probability of population extinction.

Statewide
Recipient
International Water Institute
2016 Fiscal Year Funding Amount
$523,135
2018 Fiscal Year Funding Amount
$288,451
2019 Fiscal Year Funding Amount
$201,398
2020 Fiscal Year Funding Amount
$243,164
2021 Fiscal Year Funding Amount
$243,164
2022 Fiscal Year Funding Amount
$463,456
Fund Source

The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during the contract period. There will also be 5 sites in the Red River Basin where mercury samples will be collected and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow.

Beltrami
Cass
Grant
Itasca
Kittson
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$194,490
Fund Source

This project will provide land and water managers in the Red River Basin with data and online tools to prioritize actions on the landscape that achieve water quality objectives identified in local and state plans. This will help identify strategically important locations for implementing erosion control and water management practices. Standardized watershed-based data products will be integrated into a web-based planning tool which will be added to the Red River Basin Decision Information Network (RRBDIN) being developed as part of the Red River Watershed Feasibility Study.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2018 Fiscal Year Funding Amount
$125,000
2019 Fiscal Year Funding Amount
$125,000
2020 Fiscal Year Funding Amount
$150,000
2021 Fiscal Year Funding Amount
$150,000
2022 Fiscal Year Funding Amount
$150,000
2023 Fiscal Year Funding Amount
$150,000
Fund Source

This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2016 Fiscal Year Funding Amount
$200,000
Fund Source

This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$346,000
Fund Source

This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$272,267
2014 Fiscal Year Funding Amount
$359,367
Fund Source

International Water Institute (IWI) staff will monitor 24 sites in the Bois de Sioux, Mustinka (2 sites), Buffalo (8 sites), Red Lake (4 sites), Sandhill (3 sites), Thief (2 sites), and Tamarac River (3 sites) Watersheds intensively over a 2 year period in an attempt to collect 25 samples per year at each site. If conditions allow for the collection of all planned samples, 1200 stream samples will be collected over the time period. Monitoring will include field measurements, observations, and at least three photographs during each site visit.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$200,000
Fund Source

MN Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Becker
Beltrami
Clay
Clearwater
Douglas
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Pope
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
East Otter Tail Soil and Water Conservation District (SWCD)
2023 Fiscal Year Funding Amount
$49,980
Fund Source

The Redeye River watershed is conducting the second intensive watershed assessment. The water quality in the watershed is still pretty healthy, but the streams with poor water quality identified previously are still not meeting water quality standards. The goal during this cycle is to better identify problem areas so that parcel specific implementation can occur to achieve improved water quality. The best method available to better target implementation is through culvert inventories, visual and desktop surveys, as well as outreach.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Otter Tail, East SWCD
2022 Fiscal Year Funding Amount
$706,488
Fund Source

Watershed based implementation funds will be used to target conservation practices utilizing the principles associated with Prioritize, Target and Measure as referenced in our Local Comprehensive Watershed Management Plan. The following are projects/practices, and their associated pollution reduction estimates, that are included in this budget request: (500 acres of Nonstructural BMPs) to protect/improve land management and reduce bacteria will reduce phosphorus by 65 lbs/yr, nitrogen by 520 lbs/yr, and sediment by 285 tons/yr.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Otter Tail, East SWCD
2021 Fiscal Year Funding Amount
$706,488
Fund Source
Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Carver Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$63,350
Fund Source

Hydes Lake is the headwaters to Carver Creek and is known for its excellent fishery. However, the lake has elevated nutrient levels which lead to poor water quality. A clean up plan for Hydes Lake has identified the need to reduce phosphorus loading by 81 percent from watershed sources.

Carver
Recipient
Carver Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$32,600
Fund Source

Hydes Lake is the headwaters to Carver Creek and is known for its excellent fishery. However, the lake has elevated nutrient levels which lead to poor water quality. A clean up plan for Hydes Lake identified the need to reduce phosphorus loading by 81 percent from watershed sources.

Carver
Recipient
Carver County WMO
2023 Fiscal Year Funding Amount
$40,000
Fund Source

Since 2008, a ravine on the Northwest side of Reitz Lake has been eroding on a private parcel, causing sediment and nutrients to discharge into the waterbody. This project will stabilize a ravine that has formed from Airport Road down to Reitz Lake.

Carver
Recipient
Carver County Watershed Management Organization
2011 Fiscal Year Funding Amount
$127,551
Fund Source

The Reitz Lake restoration project began several years ago when water quality samples showed the lake was impaired. Carver County and residents around the lake took action and began to develop a plan (TMDL) to clean up Reitz Lake.Once the TMDL study and the associated implementation plan (which helps to target specific projects) were completed, funding was sought to target high priority projects around the Lake. First, direct untreated run-off from a farmed area of approximately 100 acres to the north of the lake will be slowed and filtered before it enters the lake.

Carver
Recipient
United States Geological Survey (USGS)
2010 Fiscal Year Funding Amount
$675,649
Fund Source

The USGS and the MPCA will determine the relative contributions of endocrine active chemicals (EACs) and pharmaceuticals from WWTP effluent to aquatic ecosystems. The primary objective is to measure the concentrations of EACs and pharmaceuticals in water samples collected from the effluents from 20 WWTPs and at sites upstream and downstream of WWTP effluent discharge in Minnesota during 2009-2011.

Statewide
Recipient
University of Minnesota
2010 Fiscal Year Funding Amount
$150,000
Fund Source

This project will provide analysis of geographic patterns, temporal trends of lake clarity and relationships of water clarity to other lake properties, land cover and demographic factors by use of satellite remote sensing. Data for all lakes and years are available in the LakeBrowser, a web-based mapping tool that enables searches and display of results for individual lakes. This project will extend and add to the database, analyze current and new data, and enhance the capability for resource managers to access and use the data.

Statewide
Recipient
Riley-Purgatory-Bluff Creek
2013 Fiscal Year Funding Amount
$150,000
Fund Source

The goal of this project is to implement 10-15 medium sized projects that will infiltrate and reduce pollutant loads to the waters in the Riley-Purgatory-Creek Watershed District. The District intends to achieve this by using their Citizen Advisors who are well involved with local associations, City staff who are familiar with associations in their jurisdiction and also seek less-known association through various advertising methods. We intend to use staff knowledge to insure that the projects are suitable for the site and implemented correctly to maximize efficiency.

Carver
Hennepin
Recipient
Board of Water and Soil Resources
2013 Fiscal Year Funding Amount
$84,000
Fund Source

State law (M.L. 2011, First Special Session, Ch. 6) directs restoration evaluations to be conducted on habitat restoration projects completed with funds from the Clean Water Fund (M.S. 114.D.50 Subd. 6). The Board of Water and Soil Resources (BWSR) is responsible for convening a Restoration Evaluation Panel containing at least five technical experts who will evaluate a sample of up to 10 habitat restoration projects annually. The Panel will evaluate the restorations relative to the law, current science, stated goals and standards in the restoration plans, and applicable guidelines.

Statewide
Recipient
Barr Engineering
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley