The Crow Wing River Watershed consists of approximately 1,959 square miles in the north to north central portion of the Upper Mississippi River Basin in Central Minnesota. The watershed encompasses all or parts of Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd and Wadena Counties. The dominant land use within the watershed is forested (41%), agriculture (32%), grass, shrub and wetland make up 17%, water (7%) and urban (3%).
Monitoring the health of Minnesota rivers is vital in determining, maintaining, and improving the health of the rivers for the environment and public use. The scope of this project is to collect surface water chemistry samples at designated sampling locations during appropriate time periods and at appropriate frequencies during these time periods for 1 year beginning in February 2015. The data collected and submitted to MPCA will provide information necessary to determine stream characteristics and calculate water quality pollutant loads.
The Rum River Watershed Partnership will implement Priority Level A and B Actions. While not explicitly called out, actions that obtain multiple benefits to other Level B and C priority issues, such as Natural Resources?Protection, Management, and Restoration of Upland Habitat, a Level B issue, will be given priority. The work plan targets Tier 1-3 waters identified in the CWMP.
The goal of this project is to extend the input timeseries for the existing Crow Wing, Redeye, and Long Prairie, watershed Hydrologic Simulation Program FORTRAN (HSPF) models and refine the calibration.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of these major watersheds: Crow Wing River, Redeye River, and Long Prairie River.
This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.
This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.
The goal of this project is to refine the segmentation, extend the simulation period, and recalibrate an existing Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Rum River Watershed.
Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogenbest management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators onissues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigationscheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reducenitrogen leaching losses in irrigated cropping systems.
Phase 4 of the Lake Winona Total Maximum Daily Load (TMDL) project will finalize the draft Lake Winona TMDL, dated November 2009, by completing additional data analysis, lake quality modeling, updating the TMDL report, and supporting the public involvement process.
Little Rock Creek, a cold-water trout stream in central Minnesota, is impaired due to the lack of trout and other cold water fish. The trout are absent because of high water temperatures, low dissolved oxygen and high nitrate levels, stressors caused from a lack of base flow and overuse of groundwater. This project continues a 2011 initiative to assist irrigators in the Little Rock Creek groundwater recharge area with managing the timing and amount of irrigation applied to their crops.
The Little Rock Lake Total Maximum Daily Load study has identified areas in the watershed where phosphorus reduction is needed and what best management practices need to be applied. This is a coordinated implementation effort with Benton and Morrison Soil and Water Conservation Districts and Natural Resources Conservation Service, the Little Rock Lake Association, the livestock industry and other partners to install best management practices at numerous sites to continue cleaning up Little Rock Lake.
The goal of this project is to develop a Total Maximum Daily Load (TMDL) for all impaired stream reaches and lakes within the Long Prairie and Red Eye Watersheds.
This project will provide surface water quality data to the Minnesota Pollution Control Agency (MPCA) to inform the Watershed Restoration and Protection Strategies (WRAPS) update process. All locations are in the Douglas County portion of the Long Prairie Watershed. Sites have been targeted based on local knowledge and citizen concerns. A culvert inventory will also be completed through this project. This will provide flow path data that will be utilized in future water quality analysis and project designs.
This project will gather watershed data to support the development of a Watershed Restoration and Protection Strategy with parameter-specific targets that will maintain or improve water quality for the Long Prairie River Watershed. This project will also provide an important framework for civic and citizen engagement and communication, contributing to long-term public participation in surface water protection and restoration activities throughout the watershed.
This project is to finalize the Total Maximum Daily Loads (TMDLs) and Watershed Restoration & Protection Strategies (WRAPS) for the Red Eye and Long Prairie Watersheds.
This funding will be used to help fulfill the goals established in the Long Prairie CWMP. Approximate goals addressed are listed with the activities addressing them. Anticipated projects to be implemented include agricultural waste management facilities, agricultural land management, exclusion fencing, rain gardens, subsurface sewage treatment upgrades, shoreline restorations, and forestry. Other projects will be considered as opportunities arise.
This Sauk River Watershed District project will conduct the Whitney Park river clean-up, adopt a river program and other community events as part of their healthy living programs; will collaborate with the city of St. Cloud to install a rain garden demonstration site at Whitney Park; use local radio and public television stations to promote the District’s “neighborhood rain garden initiative” and other incentive programs.
This project will provide condition monitoring and problem investigation monitoring at the following sites. Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek. Minnesota River: Tributaries include Eagle Creek, Riley Creek, and Willow Creek. St. Croix River: Tributary includes Valley Creek.
Mankato State University (MSU) will work with the Minnesota Pollution Control Agency (MPCA) and the Minnesota Department of Agriculture (MDA) to plan a stakeholder process kick off meeting for the Minnesota River Ag/Urban partnership project. MSU will help to plan and facilitate the meeting.
This project will create a high accuracy elevation dataset - critical for effectively planning and implementing water quality projects - for the state of Minnesota using LiDAR (Light Detection and Ranging) and geospatial mapping technologies. Although some areas of the state have been mapped previously, many counties remain unmapped or have insufficient or inadequate data. This multi-year project, to be completed in 2012, is a collaborative effort of Minnesota's Digital Elevation Committee and partners with county surveyors to ensure accuracy with ground-truthing.
The project goal is to conduct water chemistry monitoring at four subwatershed sites and one basin site in 2016, 2017, 2018 and 2019. Water chemistry monitoring will be conducted at a wide range of flow conditions with emphasis of collecting samples during periods of moderate and high flows after runoff events, as defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.
Phase 1 of this project is primarily geared towards project planning and coordination among project partners, developing an initial civic engagement strategic plan, holding a watershed kick-off meeting, and gathering and summarizing available water quality data.
Phase 2 of the Mississippi River - Brainerd Watershed Restoration and Protection Strategy (WRAPS) project will: develop the WRAPS report and the Total Maximum Daily Load (TMDL) study, which allocates pollutant load reductions for impaired waters; implement a civic engagement plan; and develop watershed modeling scenarios to help understand implementation needs in the watershed.
This project will develop a Watershed Restoration and Protection Strategy (WRAPS) report as well as Total Maximum Daily Load (TMDL) studies where needed. The TMDLs will provide the quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for the impairments within the watershed. Strategies for protecting the unimpaired waters within the watershed will also be included.
The Morrison County Board has stepped up their efforts to examine septic compliance for any septic not inspected within five years. They assigned the Local Water Plan task force to develop a pilot plan to show how it would work and whether further enforcement action is appropriate.
This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.
Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.
This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.
Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.
This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.
Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.
This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.
This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.
The goal of this project is to analyze and document database architecture, platform, table structures, systems and data fields at six Minnesota agencies (Board of Soil and Water Resources, Department of Natural Resources, MN Department of Agriculture, MN Department of Health, Metropolitan Council, and MN Pollution Control Agency) for 30+ databases related to water.
The Platte River is listed by MPCA as impaired for fish bioassessments and water temperature. It is a recreational river used by many swimmers, paddlers and flotation users. The Platte is a major tributary to the Mississippi River which is the primary drinking water supply from St. Cloud to the Gulf. The Mississippi River segment immediately below Royalton is also impaired and therefore remedial efforts above are imperative.
The 400-mile stretch of the Mississippi River from its headwaters at Lake Itasca to Morrison County near Little Falls is the focus of this project. Working in cooperation with the eight member counties, this project will develop implementation plans and strategies geared specifically for the Mississippi River and incorporate them into the individual County Comprehensive Local Water Plans. These recommendations will be for specific strategies, often crossing county boundaries for implementation.