We will assess the environmental quality of prairies across Minnesota. On-the-ground surveys and contaminant risk assessments will help inform partner management actions, endangered species recovery plans, and pollinator reintroduction efforts.
To complete the interior display areas of the historically accurate Forestry Ranger Station. Exhibits will feature the early history of forest fire fighting, an account of forestry activity on the Red Lake Indian Reservation, draft horse logging equipment, lumberjack tools, and a tribute to Paul Bunyon. Additionally, funds will be used for a stage where speakers can tell stories and teach about forestry stewardship.
Beltrami County will be updating their water plan in 2017. This plan will be watershed protection oriented and will utilize all available data and maps in order to best protect our water resources. In 2012, Beltrami County completed screening on 19 of our large lakes with heavy land use development. What we found was that none of the lakes had enough chemical data for a trend analysis.
The Beltrami SWCD proposes to partner with citizen and non-profit groups to complete projects that will reduce stormwater runoff and retain water on the land. The majority of the projects will be in the Lake Bemidji lakeshed which has recently been identified in the WRAPs project as being on the verge of impaired for nutrients. With the City of Bemidji being a regional hub for Northwestern Minnesota and the First City on the Mississippi, there are ample opportunities for citizen involvement and ample opportunities for stormwater improvements.
As a part of the Mississippi Headwaters Stormwater Retrofit Analysis, a feasibility study was conducted on the Bemidji State University property to determine possible subsurface water quality best management practices options. Staff from Beltrami SWCD, in cooperation with the City of Bemidji and Bemidji State University, are proposing to install a subsurface stormwater treatment system to reduce Total Suspended Solids (TSS) and Total Phosphorus (TP) loading to Lake Bemidji and subsequently the Mississippi River.
To hire a qualified consultant to develop planning documents to help preserve the Bemidji Carnegie Library, listed in the National Register of Historic Places.
The Berger Fountain, known as the dandelion fountain to most, was installed in 1975 by Benjamin Berger and has been a beloved neighborhood landmark in Loring Park and a favorite location for wedding photographers and children ever since. Ben Berger was a park board commissioner and, after seeing a dandelion fountain in Australia, fundraised to build a sister fountain right here in Minnesota.
This project will support a co-creative engagement program with Leech Lake Band of Ojibwe children, families, and educators, highlighting the art, culture, and heritage of North Central Minnesota from the perspectives of Leech Lake Band of Ojibwe children.
This study will leverage our current bioacoustics monitoring framework to assess avian diversity at the statewide scale through a citizen science acoustic monitoring program, with a focus on private lands.
This full-scale pilot will evaluate supercritical water oxidation (SCWO) for managing PFAS in biosolids and water treatment residuals. SCWO can destroy PFAS in a variety of wastes and recover energy.
We will partner with urban municipalities and school districts to support planting of climate-resilient tree species. Activities include planting trees, gravel bed nursery creation, tree assessment and mapping, and community.
The Camp Ripley ACUB Phase VI project protected almost 1070 acres of high quality habitat along the Mississippi and Crow Wing Rivers and near the Nokasippi and Gull River WMAs through approximately 14 conservation easements.
Phase 11 of the Camp Ripley Sentinel Landscape ACUB Partnership will utilize permanent conservation easements (BWSR RIM) to acquire 1,150-acres of high quality habitat in order to accomplish: PERMANENT PROTECTION of habitat corridors and buffers around public lands, PRESERVE open space within the CRSL, and conservation enhancement and restoration PRACTICES to protect soil and water quality and habitat corridor connectivity.
Phase VIII of the RIM Camp Ripley Sentinel Landscape ACUB Partnership utilized permanent RIM conservation easements to acquire 1,755-acres of high quality habitat within the ACUB work area. We secured 7 easements including the two one contiguous block but done as two easements for legal reasons) Cushing Land Company easements that totaled 1,464 acres. In total one of the largest RIM easements ever acquired.
Phase IX of the RIM Camp Ripley Sentinel Landscape ACUB Partnership secured 7 permanent RIM conservation easements to protect 539-acres of high quality habitat. We hit the estimated number of acres from the original Accomplishment Plan. BWSR utilized the RIM easement process in partnership with the Morrison SWCD to secure habitat corridor easements on sites within Crow Wing, Cass, and Morrison counties during the appropriation term.
The Camp Ripley ACUB Phase VII project protected 598.2 acres of high quality habitat along the Crow Wing, Gull, Nokasippi, and Mississippi River corridors through nine conservation easements.
The project protect approximately 1090 acres of habitat for fish, game and wildlife with easements along the Mississippi and Crow Wing Rivers and tributaries. Protection will reduce infringement and development and improve watershed function.
While aspen is one of the most dominant forest types, predicted future conditions will negatively impact aspen growth. Increasing tree diversity can provide increase ecological and economic resilience.