We will assess the environmental quality of prairies across Minnesota. On-the-ground surveys and contaminant risk assessments will help inform partner management actions, endangered species recovery plans, and pollinator reintroduction efforts.
Great River Energy (GRE) operates a power plant in the City of Elk River which generates electricity by incinerating municipal solid wastes. The plant is located proximate to the City of Elk River wastewater treatment plant (WWTP). This project will result in a corresponding reduction of groundwater use by GRE.
The Berger Fountain, known as the dandelion fountain to most, was installed in 1975 by Benjamin Berger and has been a beloved neighborhood landmark in Loring Park and a favorite location for wedding photographers and children ever since. Ben Berger was a park board commissioner and, after seeing a dandelion fountain in Australia, fundraised to build a sister fountain right here in Minnesota.
This project will support a co-creative engagement program with Leech Lake Band of Ojibwe children, families, and educators, highlighting the art, culture, and heritage of North Central Minnesota from the perspectives of Leech Lake Band of Ojibwe children.
This study will leverage our current bioacoustics monitoring framework to assess avian diversity at the statewide scale through a citizen science acoustic monitoring program, with a focus on private lands.
The funds requested will provide Big Lake Township with the technical and financial assistance necessary to retrofit up to six locations for stormwater treatment practices within the direct drainage area of Birch Lake, an impaired water body which is very close to meeting state standards. The projects have been identified as high priority in several water quality plans including a TMDL, a subwatershed assessment, the County Water Plan and the Mississippi River (St. Cloud) WRAPS.
This full-scale pilot will evaluate supercritical water oxidation (SCWO) for managing PFAS in biosolids and water treatment residuals. SCWO can destroy PFAS in a variety of wastes and recover energy.
The Briggs Lake Chain Association (BLCA) is one of Sherburne County's most proactive lake associations. This sub-grant will provide for approximately 20-30 stormwater reduction best management practices on strategically targeted parcels previously identified as contributing to degraded water quality through Total Maximum Daily Loads, aerial lakeshore analysis and site-reviews conducted by the BLCA.
We will partner with urban municipalities and school districts to support planting of climate-resilient tree species. Activities include planting trees, gravel bed nursery creation, tree assessment and mapping, and community.
The Camp Ripley ACUB Phase VI project protected almost 1070 acres of high quality habitat along the Mississippi and Crow Wing Rivers and near the Nokasippi and Gull River WMAs through approximately 14 conservation easements.
Phase 11 of the Camp Ripley Sentinel Landscape ACUB Partnership will utilize permanent conservation easements (BWSR RIM) to acquire 1,150-acres of high quality habitat in order to accomplish: PERMANENT PROTECTION of habitat corridors and buffers around public lands, PRESERVE open space within the CRSL, and conservation enhancement and restoration PRACTICES to protect soil and water quality and habitat corridor connectivity.
Phase VIII of the RIM Camp Ripley Sentinel Landscape ACUB Partnership utilized permanent RIM conservation easements to acquire 1,755-acres of high quality habitat within the ACUB work area. We secured 7 easements including the two one contiguous block but done as two easements for legal reasons) Cushing Land Company easements that totaled 1,464 acres. In total one of the largest RIM easements ever acquired.
Phase IX of the RIM Camp Ripley Sentinel Landscape ACUB Partnership secured 7 permanent RIM conservation easements to protect 539-acres of high quality habitat. We hit the estimated number of acres from the original Accomplishment Plan. BWSR utilized the RIM easement process in partnership with the Morrison SWCD to secure habitat corridor easements on sites within Crow Wing, Cass, and Morrison counties during the appropriation term.
The Camp Ripley ACUB Phase VII project protected 598.2 acres of high quality habitat along the Crow Wing, Gull, Nokasippi, and Mississippi River corridors through nine conservation easements.
The project protect approximately 1090 acres of habitat for fish, game and wildlife with easements along the Mississippi and Crow Wing Rivers and tributaries. Protection will reduce infringement and development and improve watershed function.