The Minnesota State Band is a 45-piece concert band that performs a wide variety of music throughout the year. This year, the band celebrates 125 years as an arts organization. We are a part of Minnesota's rich history.
When we receive legacy funding, our goals are to increase the number of concert tours, continuing to reach out to smaller communities around Minnesota, sharing our love of music with residents, and planning joint events with school and community music and arts groups throughout our state.
To hire a qualified historian to complete an evaluation to determine eligibility for listing in the National Register of Historic Places for the Minnetonka Beach Water Tower.
To hire a qualified historian to complete an updated nomination to the National Register of Historic Places for the historic Minnetonka Town Hall, now owned and used by Minnetonka Community Church.
To support students' acquisition of Ojibwe and Dakota language and culture that begins in early childhood immersion at Anishinaabe Academy and firmly establish this learning into daily, regular classroom and community behavior. Strengthen and support the existing language pathways through 12th grade and extend our focus on the development and implementation of a strong Dakota language curriculum.
A 5.8-mile shoreline assessment completed in Summer 2020 along the Mississippi River shoreline in Brooklyn Park comprehensively surveyed erosion issues and identified numerous riverfronts severely eroding into the river, contributing significant sediment and nutrient loads. The report catalogued these properties and identified a set of properties west of Banfill Island as the most critical and cost-effective for restoration.
This project is a documentary and includes working in partnership with East Side Freedom Library (ESFL) and Vietnamese Social Services (VSS) and with Cambodian American Partnership (CAP) as a program partner with the collaborative aim to provide a platform for Southeast Asian women to share their experiences preserving history, honoring more inclusively the lives impacted, and building awareness of these stories in Minnesota, of particular relevance for our state where Cambodian, Hmong, Laotian, and Vietnamese American communities established post-Vietnam War and continue to grow.
The project goal is to conduct water chemistry monitoring at four subwatershed sites and one basin site in 2016, 2017, 2018 and 2019. Water chemistry monitoring will be conducted at a wide range of flow conditions with emphasis of collecting samples during periods of moderate and high flows after runoff events, as defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.
Design, engineer, and implement improvements called for in the 1982 plan for the Bohemian Flats area, and also improve various facilities throughout the park including trails, stairways, walls, and interpretive and wayfinding signs. These improvements will include trails, pathways, fishing and other river access, shoreline restoration, parking, informational signage, and visitor comfort facilities. The new master plan currently underway will use community participation to determine exact priority projects funded under this request.
The DNR has been charged by the legislature to develop rules that protect and manage the Mississippi River Corridor Critical Area (MRCCA) for natural resource, economic development, transportation, historic preservation, and other values. This project engages stakeholder groups in a public process to balance regulatory protections with local flexibility and control.
Phase 1 of this project is primarily geared towards project planning and coordination among project partners, developing an initial civic engagement strategic plan, holding a watershed kick-off meeting, and gathering and summarizing available water quality data.
Phase 2 of the Mississippi River - Brainerd Watershed Restoration and Protection Strategy (WRAPS) project will: develop the WRAPS report and the Total Maximum Daily Load (TMDL) study, which allocates pollutant load reductions for impaired waters; implement a civic engagement plan; and develop watershed modeling scenarios to help understand implementation needs in the watershed.
This project will develop a Watershed Restoration and Protection Strategy (WRAPS) report as well as Total Maximum Daily Load (TMDL) studies where needed. The TMDLs will provide the quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for the impairments within the watershed. Strategies for protecting the unimpaired waters within the watershed will also be included.
The Mississippi Headwaters Habitat Corridor Project Phase IV (ML 18) achieved permanent protection of 1,590 acres of critical fish and wildlife habitat, including 12 miles of shoreland on the Mississippi River and adjacent lakes/tributaries. This accomplishment exceeded the appropriation goal by over 200%. Seven (7) fee-title acquisitions and 12 RIM conservation easements adjacent to public land created or expanded large habitat protection complexes. Acquisitions included 4 additions to county forests and 3 additions to DNR public land.
In Phase 7, The Mississippi Headwaters Board in partnership with The Trust for Public Land and BWSR assisted by 7 County SWCDs will permanently protect an additional 2,015 acres of critical fish and wildlife habitat along the first 400 miles of the Mississippi River, its major tributaries, and 9 headwaters lakes. Previous phases have already protected 4,130 acres and 34 miles of shoreland using fee title acquisitions and conservation easements to create or expand permanently protected aquatic and upland wildlife habitat corridors.