Miss River Streambank Stabilization
A 5.8-mile shoreline assessment completed in Summer 2020 along the Mississippi River shoreline in Brooklyn Park comprehensively surveyed erosion issues and identified numerous riverfronts severely eroding into the river, contributing significant sediment and nutrient loads. The report catalogued these properties and identified a set of properties west of Banfill Island as the most critical and cost-effective for restoration. This project will prepare preliminary plans and specifications for a future project to stabilize the riverbank at seven locations with severe erosion, a total of 715 linear feet of riverbank.
http://www.bwsr.state.mn.us/board
http://www.bwsr.state.mn.us/board
Annie Felix-Gerth
2019: (a) $13,591,000 the first year and $13,375,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan or metropolitan surface water management frameworks or groundwater plans. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. 2021: (a) $21,197,000 the first year and $22,367,000 the second year are for performance-based grants with multiyear implementation plans to local government units. The grants may be used to implement projects that protect, enhance, and restore surface water quality in lakes, rivers, and streams; protect groundwater from degradation; and protect drinking water sources. Projects must be identified in a comprehensive watershed plan developed under the One Watershed, One Plan and seven-county metropolitan groundwater or surface water management frameworks as provided for in Minnesota Statutes, chapters 103B, 103C, 103D, and 114D. Grant recipients must identify a nonstate match and may use other legacy funds to supplement projects funded under this paragraph. This appropriation may be used for:
(1) implementation grants to watershed planning areas with approved plans, including but not limited to Buffalo-Red River, Cannon River, Cedar River, Clearwater River, Des Moines River, Hawk Creek, Lac qui Parle Yellow Bank, Lake of the Woods, Lake Superior North, Le Seuer River, Leech Lake River, Long Prairie River, Lower Minnesota River North, Lower Minnesota River West, Lower Minnesota River South, Lower St. Croix River, Marsh and Wild Rice, Middle Snake Tamarack Rivers, Mississippi East, Mississippi River Headwaters, Mississippi West, Missouri River Basin, Mustinka/Bois de Sioux, Nemadji River, North Fork Crow River, Otter Tail, Pine River, Pomme de Terre River, Red Lake River, Redeye River, Root River, Rum River, Sauk River, Shell Rock River/Winnebago Watershed, Snake River, South Fork Crow River, St. Louis River, Thief River, Two Rivers Plus, Vermillion, Watonwan River, Winona La Crescent, Yellow Medicine River, and Zumbro River; (2) seven-county metropolitan groundwater or surface water management frameworks; and (3) other comprehensive watershed management plan planning areas that have a board-approved and local-government-adopted plan as authorized in Minnesota Statutes, section 103B.801.
The board may determine whether a planning area is not ready to proceed, does not have the nonstate match committed, or has not expended all money granted to it. Upon making the determination, the board may allocate a grant's proposed or unexpended allocation to another planning area to implement priority projects, programs, or practices.
Prepare plans and specifications for the repair and stabilization of Mississippi River streambank for seven properties in Brooklyn Park. That future work will reduce sediment load by 548 tons/year and total phosphorus by 506 pounds per year.
LOCAL LEVERAGED FUNDS