Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 12 local governments with funds.
The Camp Ripley ACUB Phase VI project protected almost 1070 acres of high quality habitat along the Mississippi and Crow Wing Rivers and near the Nokasippi and Gull River WMAs through approximately 14 conservation easements.
Phase 11 of the Camp Ripley Sentinel Landscape ACUB Partnership will utilize permanent conservation easements (BWSR RIM) to acquire 1,150-acres of high quality habitat in order to accomplish: PERMANENT PROTECTION of habitat corridors and buffers around public lands, PRESERVE open space within the CRSL, and conservation enhancement and restoration PRACTICES to protect soil and water quality and habitat corridor connectivity.
Phase VIII of the RIM Camp Ripley Sentinel Landscape ACUB Partnership utilized permanent RIM conservation easements to acquire 1,755-acres of high quality habitat within the ACUB work area. We secured 7 easements including the two one contiguous block but done as two easements for legal reasons) Cushing Land Company easements that totaled 1,464 acres. In total one of the largest RIM easements ever acquired.
Phase IX of the RIM Camp Ripley Sentinel Landscape ACUB Partnership secured 7 permanent RIM conservation easements to protect 539-acres of high quality habitat. We hit the estimated number of acres from the original Accomplishment Plan. BWSR utilized the RIM easement process in partnership with the Morrison SWCD to secure habitat corridor easements on sites within Crow Wing, Cass, and Morrison counties during the appropriation term.
The Camp Ripley ACUB Phase VII project protected 598.2 acres of high quality habitat along the Crow Wing, Gull, Nokasippi, and Mississippi River corridors through nine conservation easements.
The project protect approximately 1090 acres of habitat for fish, game and wildlife with easements along the Mississippi and Crow Wing Rivers and tributaries. Protection will reduce infringement and development and improve watershed function.
While aspen is one of the most dominant forest types, predicted future conditions will negatively impact aspen growth. Increasing tree diversity can provide increase ecological and economic resilience.
To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area through grants for minor capital improvements equipment and supplies.
Revitalizing the old deer yards into Caribou Yards is a transformative initiative aimed at creating habitats for a herd of caribou. The need for this project arises from the closure of the old deer yards, which were previously inhabited by white-tailed deer until the last one passed away of old age. Subsequently, the fencing surrounding these three habitats has weathered and suffered damage during the years of inoccupancy.
Washington County's Carnelian Creek Conservation Corridor contains one of the largest unprotected wildlife habitat complexes within the metropolitan area and has been identified as one of the County's top conservation priorities. The Minnesota Land Trust and Washington County will protect 369 acres of the Corridor's most threatened, high quality forest and aquatic habitat in this first phase of the project.
This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.
This project will implement watershed load reduction practices to restore the top priority water body in the Carnelian Marine St. Croix Watershed District in northeast Washington County. Recently completed prioritization and targeting efforts have identified several Best Management Practice opportunities around goose Lake, the number one priority for implementation practices.
Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.
This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.
The Center for Hmong Studies is seeking a $20,000 grant form the Hmong Cultural Grant program to acquire the Jason Schoonover Collection, to provide stipend for students to digitize and catalog the collection, and to organize a Hmong Textile exhibit to show the collection.
The Center for Leadership and Neighborhood Engagement works to organize and mobilize the faith community to affect positive systems change. Our intercultural work aims at communicating culture across racial divides. Through this project we will celebrate and honor creative cultural communication with youth through counter-storytelling, educating joint learning communities, and training cultural heritage organizers to educate and rejuvenate cultural identity in the community.
Pileated Woodpeckers are keystone habitat modifiers that support an array of game, non-game, and conservation concern species. Additional information is needed to understand cavity dynamics for these species.
To hire qualified professionals to stabilize the structural system of the Charles P. Noyes Cottage (Fillebrown House), listed in the National Register of Historic Places.
The Children’s Museum of Southern Minnesota (CMSM) will build upon a strong foundation of Minnesota Arts, Culture and Heritage (ACH) learning experiences made possible with prior MN Legacy funding support to:
The Villa Park Wetland Restoration Project proposes sediment removal from 6 contiguous stormwater wetland treatment cells within the Villa Park Wetland system resulting in an additional 118lbs/yr of total phosphorus(TP) removal from water entering Lake McCarrons.
The City of Forest Lake will install four biofiltration basins and a wet sedimentation pond to treat stormwater prior to discharge into Clear Lake. Clear Lake is identified as a priority lake within the Rice Creek Watershed District's (RCWD) Watershed Management Plan and does not meet the nutrient goals established by the RCWD. Mid-summer algae blooms are common and occasionally severe enough to impact recreation.
Rising temperatures and increased precipitation contribute to decreased oxygen and increased methane in Minnesota lakes and wetlands. We will identify impacts on water quality and methane emissions, providing management guidance.