Our program/project will protect and maintain intact forest ecosystems through the use of perpetual conservation easements and other tools. This program/project will directly protect approximately 187, 277 acres of forest and wetlands with permanent conservation easements and 1,344 acres with fee acquisition.
The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.
This project will build the first comprehensive list of Minnesota moths and butterflies. Information gained through surveys and outreach efforts will inform land managers and inspire public appreciation.
Le Sueur County has completed water quality assessments of its lakes, which are on the impaired waters list for excess nutrients. The Francis Rays Sakatah Tetonka Lakes Septic Inventory project will complete up to 400 shoreland septic compliance inspections, create an ArcMap GIS layer, create community assessment reports on priority areas and provide education and outreach to the public through informational meetings and website development. The project will also jump-start upgrading non-compliant septic systems.
The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.
The Rum River Watershed Partnership will implement Priority Level A and B Actions. While not explicitly called out, actions that obtain multiple benefits to other Level B and C priority issues, such as Natural Resources?Protection, Management, and Restoration of Upland Habitat, a Level B issue, will be given priority. The work plan targets Tier 1-3 waters identified in the CWMP.
The Greater Blue Earth River Basin Alliance (GBERBA) is a joint powers organization consisting of ten member Counties and SWCDs encompassing the Blue Earth, Le Sueur and Watonwan Watersheds. Our mission is to lead in the implementation and promotion of economically viable watershed activities through the combined efforts of local partners. We have identified two target areas in the GBERB (Greater Blue Earth River Basin) where high levels of nitrates directly affect public water supply.
To hire a qualified architect to conduct a condition assessment of the circa 1870 Geldner Saw Mill, listed in the National Register of Historic Places.
This project will create and optimize eDNA assays to detect the presence of 8 endangered or threatened mussel species around Buffalo Slough near Prairie Island Indian Community.
Geologic atlases provide maps/databases essential for improved management of ground and surface water. This proposal will complete current projects and start new projects to equal about 4 complete atlases.
The German-Jefferson Subordinate Service District Board (board) completed a voluntary septic inventory through the Clean Water Fund in 2013. 344 out of 754 parcels participated in the inventory. Approximately 50% of the septic systems were found to be non-compliant with MN Rules Chapter 7080. That project included an assessment of septic systems on non-participating properties that identified eleven priority areas in populated communities with small lots. Three community feasibility studies out of the eleven priority areas were conducted.
Get the Lead Out is focused on protecting common loons and wildlife through education and outreach about the danger of lead fishing tackle and promoting lead-free tackle alternatives.
Gorman Lake has elevated nutrient levels and drains into the Cannon River. This project will provide a subgrant to the Gorman Lake Association to install a two-tiered retention pond to reduce both phosphorus and peak flow from a drainage ditch from reaching Gorman Lake. Project partners include three agricultural producers, the Le Sueur Soil and Water Conservation District and the Natural Resources Conservation Service.
Per Minnesota Laws, 2011, 1st Special Session, Chapter 6, Article 4, Section 2, Subd. 6, "These amounts are appropriated to the commissioner of administration for grants to the named organizations for the purposes specified in this subdivision.
Per Minnesota Laws, 2009, Chapter 172, Article 4, Section 2, Subd. 5, "Funds in this subdivision are appropriated to the commissioner of the Department of Administration for grants to the named organizations for the purposes specified in this subdivision. Up to one percent of funds may be used by the Department of Administration for grants administration. Grants made to public television or radio organizations are subject to Minnesota Statutes, sections 129D.18 and 129D.19."
The purpose of this project is to develop a framework to implement best management practices (BMPs) on ditches in headwater areas utilizing a partnership between drainage staff and the Greater Blue Earth River Basin Alliance (GBERBA). By replacing failing side-inlets with an alternative design, we can make strides towards our water quality and water quantity goals. The alternative inlets serve to prevent sediment and phosphorus from washing downstream and the design can also alleviate peak flows by temporarily storing stormwater.
This project proposes to increase the adoption of cover cropping in southwest Minnesota to address issues of loss of diversity and environmental degradation. By generating important information on cover crops,
With this appropriation, the Minnesota Land Trust plans to protect approximately 500 acres of critical shoreline habitat along Minnesota's lakes, wetlands, rivers, and streams by securing permanent conservation easements and dedicating funds for their perpetual monitoring, management, and enforcement. Lands being considered for permanent protection in this round of funding are located in Becker, Beltrami, Blue Earth, Itasca, Kandiyohi, Lac Qui Parle, Le Sueur, Otter Tail, Pope, and Wabasha counties.
There funds are enabling Pheasants Forever to acquire in fee title approximately 86 acres of habitat along the borders of existing Wildlife Management Areas (WMA) or Waterfowl Production Areas (WPA) in LeSueur, Lincoln, or Rice counties and convey the lands to a public agency for long term stewardship and protection. These strategic acquisitions will leverage and expand the existing habitat, water quality, and recreation benefits already provided by existing protected lands.
Evaluation of Minnesota raptors, in rehabilitation and free ranging settings, for current or previous exposure to highly pathogenic avian influenza virus to better understand outbreak impacts to raptor populations.
To strengthen a large partnership, including American Indian partners, as they improve and make available more historic information about the Minnesota River Valley.
To hire a qualified HVAC engineer to prepare planning documents for a future project to improve environmental conditions for the Elysian School, listed in the National Register of Historic Places
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
The goal of this project is to refine the segmentation, extend the simulation period, and recalibrate an existing Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Rum River Watershed.
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
Construct, calibrate, and validate three Hydrologic Simulation Program FORTRAN (HSPF) watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs).