This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.
Based on the Minnesota Waters Lake and River Association database, Crow Wing County has the highest number of lake associations in Minnesota. Currently, there are over 136 lake association groups in the county, which does not include neighborhood, resort or religious groups. These lakes aer a cornerstone to the state's tourism econmy and there is a great demand for stormwater management incentive program to protect these local water resources.
To fabricate and install an exhibit based on considerable research and consultation with numerous stakeholders about the U.S.-Dakota War of 1862 for the 150th observance in August 2012.
This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.
This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.
To fully catalog the museum's inventoried collection that documents the history of art in Minnesota under the direction of a qualified museum registrar.
To hire a qualified historic preservation specialist to assess potential impacts on and reuses for up to five buildings along the Central Corridor Light Rail Transit Line.
Lambert Creek discharges into Vadnais Lake, the final impoundment reservoir containing the potable water supply for the city of St. Paul and eight nearby suburbs. Monitoring data indicates high nutrient levels and the creek is listed by the State as having high bacterial levels. In-stream work along Lambert Creek has been maximized with restoration improvements achieving nutrient load reduction. The next step to further improve water quality is to concentrate on restoration efforts on a subwatershed level.