Our project aims to develop free online resources that teach Hmong language and culture to the public. First, printable literacy and cultural decks – for example, flashcards of the Hmong alphabet, or an overview of a prevalent Hmong tradition – available for download on our website. Our second resource include an interactive web app that teaches introductory Hmong language. Users gain literacy skills of consonants, vowels, and grammar, and can also engage in lessons that teach topics such as common greetings, introductions, survival phrases, pronouns, and more.
The Greater Blue Earth River Basin Alliance (GBERBA), a nine County/SWCD JPO has identified buffers as a basin priority. This initiative will work towards the goal of identifying all DNR protected shoreland in the GBERBA counties without a 50 foot vegetative buffer. Buffer strips protect surface and groundwater from a multitude of pollutants. During stormwater run off events buffers can remove between 50 and 100 percent of nutrients, pesticides, pathogens, and sediment. The estimated sediment reduction for this project is 756 tons per year prevented from entering our waters.
To hire an architect to write a Historic Structure Report to guide future restoration of the 1910 Sam S. Shubert Theatre and Shubert Building, listed in the National Register of Historic Places.
This project will finalize the Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.
Three streambank stabilization projects have been identified as high priority projects in the Thief River Falls Water Quality Study completed in 2017. The proposal will use a combination of bendway weirs, toe protection by building a floodplain bench and live stake plantings. It has been estimated that a total of 385 tons per year of sediment from these three locations is entering the river contributing to the impairment downstream.
The goal of this project is to calculate an additional bacteria total maximum daily load and incorporating that information in the Total Maximum Daily Load Report (TMDL) and the Watershed Restoration and Protection Strategy (WRAPS) report. Other services that will be provided during this project are technical assistance, assistance with responses to comments received during the public notice process, incorporating public comments into the documents and preparing the documents for final federal and state approval.
The goal of the project is to identify priority locations for project implementation using the Prioritize, Targeting, and Measuring Application (PTMApp) in the Thief River Watershed. The PTMApp will be used to identify and evaluate the suitability and effectiveness of best management practices including treatment scenarios, and provide estimates of sediment, nitrogen, and phosphorus delivered to the Thief River Watershed, which is impaired for sediment.
This project will increase awareness about outdoor recreation opportunities at Minnesota state parks and trails among underrepresented groups by creating handicap-accessible, touch-screen kiosks, with information in multiple languages, and placing the kiosks in high-traffic, family-oriented locations.
Continue implementation of the adopted RP Master Plan: Perform a traffic study of four intersections, traffic counts, circulation patterns, and parking access /layout at 9 parking lots to provide a framework for improving access and circulation for the roughly 1 million annual visitors, with approximately 64% of users being of Asian background.
Project to include trail improvements between T.H. 61 to Bruce Vento Trail including design, engineering, demolition, grading, stormwater management, paving, landscaping and retaining wall construction as required.
Project to include trail improvements between T.H. 61 to Bruce Vento Trail including design, engineering, demolition, grading, stormwater management, paving, landscaping and retaining wall construction as required.
Supplement improvements for a trailhead facility south of Co. Rd. I including design/engineering, construction, demolition, grading, landscaping, trails, parking, building, roads, stormwater management, utilities, signage, site and play equipment, amenities, habitat restoration, access to the water trail, lighting.
Construction of accessible pathway entrance into the sanctuary from Geranium Ave. E. Installation of signage at trail nodes, entries, and other prominent locations. Project may include: excavation, grading, stormwater management, erosion control, concrete footings, installation of signage, bituminous paving, and landscaping
At almost 4,000 acres, Trout Brook is the largest subwatershed in the Capitol Region Watershed District and the City of Saint Paul. The restored stream is part of the 42 acre Trout Brook Nature Sanctuary project, whose goal is to return the area back to some resemblance of its pre-industrialized valley of stream floodplain and wetlands. Monitoring results within the corridor show that phosphorus, sediments, bacteria, lead and copper are the pollutants of most concern.
This project will build off the success of the additional geographic information system (GIS) and water planning expertise the TSA8 added in 2016 to provide consistent mapping, water planning assistance and training to partners. This project will help soil and water conservation districts prepare for the 1W1P process before the planning starts. A unified protection methodology is essential for the 1W1P process to be successful. This project will include: unified GIS mapping and protection model for all nine counties respectively.
With roughly 70,000 residents, Minnesota is home to the largest Hmong population in the United States. The top spinning game of Tuj Lub (pronounced - too loo) has its roots in Southeast Asia and holds cultural significance to the Hmong community. Formal Tuj Lub courts, constructed near a multi-shelter picnic area at Keller Regional Park, seek
We will prepare resource kits for elementary students which will introduce the traditional arts and crafts of Turkey, as situated within the broader historical and geographical context. Because the kits will meet the guidelines of MN Academic Standards, they can be used in Social Studies and Arts classes as part of cultural diversity activities. The kits will include artifacts, documents, DVDs, curriculum guides and implementation suggestions for students to learn through hands-on experiences.
This project will assure that buffer strip compliance is being followed throughout the system. It will identify areas that will work to keep excess sediment and nutrients out of the water and provide a good strategy for cleaning the water and reducing costs to the system long term. More importantly, it provides an opportunity to have dialogue with landowners along the entire ditch and communicate the importance of buffers and conservation practices such as detainment areas and catchment Best Management Practices that keep the soil out of the system.
Our Space Is Spoken For is a multidisciplinary public art storytelling project to creatively foster largescale awareness and dialogue around the untold narratives of how historically marginalized communities redefine and negotiate space. TCMA will curate a cohort of BIPOC (Black, Indigenous, People of Color) artists and St. Paul BIPOC residents to create public art performances inspired by residents’ stories, which will be filmed and later screened as part of a public event and discussion.
This project will complete a chloride management plan which will lay out a strategy for addressing chloride impacts to our surface waters for the 7-county metropolitan area. This chloride management plan will satisfy EPA requirements for impaired waters, address waters not yet listed, and develop a strategy to protect waters that are currently meeting the water quality standards.
This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.
This project will provide modeling services to support the completion of the Typo Lake and Martin Lake Excess Nutrients TMDL report. A Total Maximum Daily Load (TMDL) report quantifies pollutant levels, identifies sources of pollution, and proposes ways to bring water quality back to an acceptable level.