Trout Brook Nature Sanctuary Trail Connections and Signage
Construction of accessible pathway entrance into the sanctuary from Geranium Ave. E. Installation of signage at trail nodes, entries, and other prominent locations. Project may include: excavation, grading, stormwater management, erosion control, concrete footings, installation of signage, bituminous paving, and landscaping
Trout Brook Regional Trail
Sec. 4 METROPOLITAN COUNCIL $19,819,000 $20,277,000
Linear feet of bituminous trail constructed; number of signs installed
382 linear feet of bituminous trail constructed; 5 interpretive signs installed.
Sec. 4 METROPOLITAN COUNCIL $19,819,000 $20,277,000
Linear feet of bituminous trail constructed; number of signs installed
382 linear feet of bituminous trail constructed; 5 interpretive signs installed.