The purpose of this project is to conduct an inventory of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.
The purpose of this Phase II Project is to advance the inventory process of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.Through this project, Red Lake Watershed District, Red Lake County Ditch Authority, along with the Red Lake County SWCD, will be working together prioritizing county ditch systems (based upon water quality degradation and the amount of sediment loading that is occurring in the ditch systems), targeting whe
Red Lake County Soil and Water Conservation District (SWCD) has targeted water quality improvement projects to twelve sites in the Black River, Cyr Creek, and Red Lake River Sub-Watersheds of the Red Lake River Watershed. Data analysis obtained from a variety of models identified which sub-watersheds were contributing to impairments, highlighted which fields in those sub-watersheds were contributing the most sediment, and even showed specific locations in the field which were most vulnerable to erosion.
The Clearwater River from the Lost River to Beau Gerlot Creek and from the Lower Badger Creek to the Red Lake River is on the Total Maximum Daily Load Impaired Waters List for Turbidity. Red Lake County Soil and Water Conservation District (SWCD) has targeted five sites in the Terrebonne Creek, Beau Gerlot Creek, and Lower Badger Creek subwatersheds of the Clearwater River Watershed; with the potential of an additional five to ten more projects, based on data analysis obtained from a number of models.
Red Lake River currently does not meet state water quality standards due to high amounts of sediment. For this project, the Red Lake County Soil and Water Conservation District will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners to reduce erosion and sedimentation into Judicial County Ditch 66. Judicial County Ditch 66 outlets into Cyr Creek which outlets directly into the Red Lake River.
Provides grants to Soil and Water Conservation Districts that focuses on increasing capacity to address four resource concern areas?Soil Erosion, Riparian Zone Management, Water Storage and Treatment, and Excess Nutrients.
The DRAFT Clearwater River Comprehensive Watershed Management Plan (CWMP) identifies the Lower Clearwater Planning Region as having a current sediment loading from overland sources of 18,491 tons/year at the planning region outlet. The 10-year Plan goal is to reduce loading to the outlet by 4% (767 tons/year). The targeted implementation schedule includes structural agricultural practices with a 10-year measurable outcome of 1,271 tons/year (catchment outlet) to meet the 10-year Plan goal.
The Red Lake Watershed District, Clearwater, East Polk, Pennington, Red Lake County SWCD's have agreed to work Collectively via MOA to implement water quality projects throughout the Clearwater River Watershed. Implementation efforts are priorities following the guidance of the Comprehensive watershed plan completed in spring of 2023. FY25 funds will be used to continue the implementation of projects identified and/or developed over the FY23 timeframe to continue to meet the goals highlighted in the comprehensive watershed plan.
The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.
The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.
This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).
This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.
Gullies are a fixture of the landscape. Except for avoiding them during field work they can be ignored for years and the benefits to the landowner of fixing them never seem to outweigh the costs for doing so. It is only when viewed over time that the true impact becomes apparent. Red Lake County SWCD identified these two project locations as high priority due to the large amount of sediment these projects have contributed to the Red Lake River. Those impacts will continue as the erosion accelerates and they become deeper and wider over time.
Installation of erosion control structures to eliminate or reduce the effects of gullies is a high priority due to the large amount of sediment they have contributed to the Red Lake River. The high sediment loading is affecting water quality, aquatic life, downstream water supply sources and recreational use of the Red Lake River.