The program will roll out a series of interactive workshops led by esteemed Somali artists and educators. These workshops will cover various aspects of Somali arts, including traditional and contemporary music, poetry, dance, and visual arts, catering to all ages and skill levels.
We will assess the environmental quality of prairies across Minnesota. On-the-ground surveys and contaminant risk assessments will help inform partner management actions, endangered species recovery plans, and pollinator reintroduction efforts.
To broaden public access to the Barnesville City Hall, listed in the National Register of Historic Places in continuous use since 1899, through the installation of an elevator and other appropriate modifications that satisfy the Americans with Disability Act
The Berger Fountain, known as the dandelion fountain to most, was installed in 1975 by Benjamin Berger and has been a beloved neighborhood landmark in Loring Park and a favorite location for wedding photographers and children ever since. Ben Berger was a park board commissioner and, after seeing a dandelion fountain in Australia, fundraised to build a sister fountain right here in Minnesota.
To hire a qualified consultant to develop a Historic Structure Report that will help preserve the 1871 Bergquist Cabin, listed in the National Register of Historic Places.
To contract with qualified professionals to prepare construction documents for the preservation of the Bergquist Cabin, listed in the National Register of Historic Places.
To fabricate and install a historical marker that provides public access to the story of the John Bergquist House, listed in the National Register of Historic Places.
To hire a qualified professional to prepare a Historic Structures Report for the John Bergquist House, listed in the National Register of Historic Places.
This study will leverage our current bioacoustics monitoring framework to assess avian diversity at the statewide scale through a citizen science acoustic monitoring program, with a focus on private lands.
Over a century ago, the construction of Judicial Ditch No. 3 resulted in the rerouting of the South Branch of the Buffalo River, completely changing its flow characteristics. In the first phase of this multi-phase project, the Buffalo-Red River Watershed District (BRRWD) in partnership with landowners, federal, state, and local agencies, will put much of the rerouted channel back restoring up to 4.6 miles of the South Branch with up to 100 acres of associated riparian habitat corridor.
The goal of this project is to complete the construction of an Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. Tetra Tech will produce a HSPF watershed model application(s) that will be fully functioning and ready for calibration as part of Phase 2.
This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.
The United States Environmental Protection Agency (USEPA) requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load Program (TMDL) in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a cataloging unit or 8-digit Hydrologic Unit Code watershed.
This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.
Multiple water courses in the Buffalo River - Red River Watershed District are impaired for turbidity. These waterways include the Red River of the North, Wolverton Creek, Deerhorn Creek, Stoney Creek, South Branch Buffalo River, and the main stem of the Buffalo River. This project will provide a means of prioritizing areas of the watershed to implement conservation practices to reduce overland runoff contaminant loadings contributing to water quality impairments.
The goal of this project is to address public comments on the public noticed draft Watershed Restoration & Protection Strategy (WRAPS) study and Total Maximum Daily Load (TMDL) report for the watershed, and to produce a final draft WRAPS study and TMDL report ready for final approval by the United States Environmental Protection Agency (USEPA) and Minnesota Pollution Control Agency (MPCA).
This project entailed a number of small individual improvements to the park made over a 3 year period, including constructing a drinking fountain with an accessible sidewalk at the beach in Buffalo River State Park, repairing a broken water line, rebuilding the main park entrance sign, purchasing sand to stem the flooding of nearby Buffalo R into the beach area, purchasing accessible fire rings, and purchase of new park signs.
A century of channel straightening efforts has significantly reduced the habitat quality within the BRRWD. The BRRWD has identified, with preliminary designs completed, a number of straightened streams. In the second phase of this multi-phase project, the BRRWD in partnership with landowners, federal, state, and local agencies, will restore 7 miles of the Upper Buffalo River channel and riparian habitat corridor, and 4.2 miles of the South Branch Buffalo River channel and riparian habitat corridor.
This Surface Water Assessment Grant (SWAG) project is intended to supplement the 2019-2020 Intensive Watershed Monitoring (IWM) process for the Buffalo and Upper Red River of the North watersheds. Nine sites will provide water chemistry and river eutrophication data to the IWM. Monitoring sites were requested by the Buffalo - Red River Watershed District (BRRWD) and the Minnesota Pollution Control Agency (MPCA).
A century of channel straightening has significantly reduced the stream habitat quality within the BRRWD. The BRRWD has identified, with preliminary designs completed, a number of straightened streams. In several multi-phase projects, the BRRWD in partnership with landowners, federal, state, and local agencies, will restore 3 miles of targeted stream and their respective riparian habitat corridors. Targeted restorations of straightened streams include the South Branch of the Buffalo River, Upper Buffalo River, Stony Creek, Whisky Creek, and Whiskey's Creek southern tributary.
Two buses, each holding 52 people, were rented to take people to the Minnesota State Capitol and the Minnesota History Center. The plan is to include people from Mahnomen, Frazee, Ulen, Lake Park, Cormorant and Detroit Lakes on this trip. Buses leave at approximately 6:00 am from Detroit Lakes with arrival at the Capitol/History Center scheduled for approximately 10:30 am. One busload will tour the capitol while the other bus tours the History Center. After tour the groups would switch venues - First Capitol group would go to tour the History
Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 12 local governments with funds.
Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 13 local governments with funds to complete 143 projects. More information is available in the detail reports below.
While aspen is one of the most dominant forest types, predicted future conditions will negatively impact aspen growth. Increasing tree diversity can provide increase ecological and economic resilience.
Revitalizing the old deer yards into Caribou Yards is a transformative initiative aimed at creating habitats for a herd of caribou. The need for this project arises from the closure of the old deer yards, which were previously inhabited by white-tailed deer until the last one passed away of old age. Subsequently, the fencing surrounding these three habitats has weathered and suffered damage during the years of inoccupancy.
To hire a qualified architect to prepare a conditions assessment and planning documents for the Cathedral of the Immaculate Conception, proposed to be used as a community center, and listed in the National Register of Historic Places.
On many public lands in northwest Minnesota, cattail growth has far exceeded the distribution recommended for optimum wetland wildlife habitat and a need for cattail control has become recognized. Cattails have also recently been demonstrated to have bioenergy potential.
The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures.
The Chief's Coulee drainage area, in northern Thief River Falls, has been identified as a source of flooding and water quality concerns through inspection and water quality sampling. Once a natural drainage course, many diverse land uses now surround the Coulee which include agriculture, industrial railroad yards, grain elevators, recycling operators, residential development, and municipal street department facilities. Extremely high concentrations of pollutants and water quality indicators, such as E.
The Children’s Museum of Southern Minnesota (CMSM) will build upon a strong foundation of Minnesota Arts, Culture and Heritage (ACH) learning experiences made possible with prior MN Legacy funding support to: