CD-96-21-16 Gully Control and Buffer Implementation
The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures. The installation of these conservation practices will result in the reduction of 2428 tons of sediment per year entering the Red Lake River near St. Hilaire. Near this location, the Red Lake River becomes impaired for Turbidity. The Pennington SWCD also has a long history of working with NRCS, the Red Lake Watershed District and landowners to implement grade stabilization structures throughout the county. With the inventory of needs already complete, these practices can be readily installed with the interest of landowners that receive incentives to assist in the reduction of sediment entering the Red Lake River.
The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures. The installation of these conservation practices will result in the reduction of 2428 tons of sediment per year entering the Red Lake River near St. Hilaire. Near this location, the Red Lake River becomes impaired for Turbidity. The Pennington SWCD also has a long history of working with NRCS, the Red Lake Watershed District and landowners to implement grade stabilization structures throughout the county. With the inventory of needs already complete, these practices can be readily installed with the interest of landowners that receive incentives to assist in the reduction of sediment entering the Red Lake River.
See http://www.bwsr.state.mn.us/aboutbwsr/index.html
Annie Felix-Gerth
Projects and Practices 2016: Laws of MN 2015 First Special Session Chapter 2, Article 7, Section 7
The estimated annual reduction in sediment is 2428 tons/year and phosphorus is 2646 lbs/year.
This project has resulted in an estimated annual reduction of 1,363 pounds of Phosphorus and 910 tons of Sediment from entering the Red Lake River through the installation of 43 grade stabilization structures and 1.25 miles of buffer.
LOCAL LEVERAGED FUNDS