This leadership workshop series will provide the participants (citizen leaders) with knowledge, skills, processes and tools that can help to strengthen their current efforts and nurture new ones.
This project will build the first comprehensive list of Minnesota moths and butterflies. Information gained through surveys and outreach efforts will inform land managers and inspire public appreciation.
BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.
This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.
This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.
The Crow Wing River Watershed consists of approximately 1,959 square miles in the north to north central portion of the Upper Mississippi River Basin in Central Minnesota. The watershed encompasses all or parts of Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd and Wadena Counties. The dominant land use within the watershed is forested (41%), agriculture (32%), grass, shrub and wetland make up 17%, water (7%) and urban (3%).
This phase of the project will complete the analysis of existing and newly collected water quality data in the Red River of the North-Grand Marais Creek watershed and also verify the impairments on the currently listed reaches and determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a primary focus throughout the project.
Funding is prioritized to structural and non-structural practices within the Upper Mustinka and Fivemile Creek planning regions. In addition, a primary goal will be to complete a feasibility study for the Fivemile Creek Restoration as well as completion of the final phase of the Lake Traverse Water Quality Improvement Project. The BdSWD will focus on 4 CIPs within the Bois de Sioux River planning regions; WCD Sub-1, WCD 35 and WCD 20 & 25 drainage retrofit projects.
This is the third round of watershed based implementation funds to be shared by up to 13 LGU's between the Bois de Sioux River and Mustinka River watersheds. These funds are to implement grant eligible components of the 2021 - 2030 Joint Comprehensive Watershed Management Plan. Activities for this grant application are diverse, reflecting activities planned to improve water quality to and within legal drainage systems, streams, and lakes in the Bois de Sioux and Mustinka River watersheds.
The Chippewa River Watershed planning partnership has based its comprehensive watershed management plan (CWMP) on six planning regions. Each planning region has a list of prioritized and targeted resource concerns, measurable goals, and implementation actions. Implementation actions will be focused based on the CWMP on the highest and medium priority practices in locations within each planning region, which were prioritized based on local concerns, programs, etc.
This project will create and optimize eDNA assays to detect the presence of 8 endangered or threatened mussel species around Buffalo Slough near Prairie Island Indian Community.
Geologic atlases provide maps/databases essential for improved management of ground and surface water. This proposal will complete current projects and start new projects to equal about 4 complete atlases.
To conduct a geophysical and archaeological evaluation of Fort Juelson, resulting in completion of a Minnesota state site form and National Register nomination.
Get the Lead Out is focused on protecting common loons and wildlife through education and outreach about the danger of lead fishing tackle and promoting lead-free tackle alternatives.
The Thief River is the source of drinking water for the City of Thief River Falls. The river's other designated uses also include recreation and aquatic life. Water quality monitoring conducted by local agencies discovered that the Thief River is not meeting state water quality standards for both turbidity (muddiness) and dissolved oxygen. Each year, approximately 12,376 tons of sediment is deposited into the Thief River Falls reservoir by the Thief River. That is the equivalent of over 1,200 dump trucks full of dirt.
The purpose of this project is to prepare a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study for public notice. This project will include addressing and incorporating Minnesota Pollution Control (MPCA) review comments in both documents. The TMDL Study has been submitted to the United States Environmental Protection Agency (USEPA) for preliminary review. USEPA comments will be addressed prior to public notice.
The goal of this project is to construct watershed models for the Grand Marais Creek and Snake River Watersheds and perform an initial hydrologic calibration using Hydrologic Simulation Program FORTRAN (HSPF).
In the early 1900s, a joint State and County drainage project constructed a 1 mile outlet channel to Grand Marais Creek to provide a shorter outlet to the Red River and effectively abandoned the lower 6 miles of the natural channel. In recent times, the ditch has eroded from its original shape to a channel of steep gradients and unstable banks. This has resulted in head cutting of the channel and nearly continuous channel erosion and bank sloughing with the effect of depositing up to an estimated annual average of 700 tons of sediment into the Red River.
Per Minnesota Laws, 2011, 1st Special Session, Chapter 6, Article 4, Section 2, Subd. 6, "These amounts are appropriated to the commissioner of administration for grants to the named organizations for the purposes specified in this subdivision.
Per Minnesota Laws, 2009, Chapter 172, Article 4, Section 2, Subd. 5, "Funds in this subdivision are appropriated to the commissioner of the Department of Administration for grants to the named organizations for the purposes specified in this subdivision. Up to one percent of funds may be used by the Department of Administration for grants administration. Grants made to public television or radio organizations are subject to Minnesota Statutes, sections 129D.18 and 129D.19."
The Grassland Conservation Partnership Phase II grant resulted in the protection via conservation easement of 1,778 acres of grassland habitat and 3 miles of shoreline associated with 2 working grasslands projects in western Minnesota. Land protected through conservation easement exceeded the proposed outputs for this grant by 445% (1,778 versus 400 proposed acres). In addition, 140 acres of grasslands habitat was enhanced through the grant.
The goal of this project is to extend the input timeseries for the existing Crow Wing, Redeye, and Long Prairie, watershed Hydrologic Simulation Program FORTRAN (HSPF) models and refine the calibration.
The Halvorson Streambank Stabilization site is located three miles north of the City of Thief River Falls on the Thief River. The Thief River is impaired for low dissolved oxygen and turbidity. A TMDL study began in 2010. These impairments affect fish spawning habitat, recreation and the drinking water supply of Thief River Falls. Studies show that 63% of the sediment in the Thief River is coming from the banks of the river itself. Stabilizing this bank will reduce the turbidity and low dissolved oxygen impairments.
This project proposes to increase the adoption of cover cropping in southwest Minnesota to address issues of loss of diversity and environmental degradation. By generating important information on cover crops,
The Hardwood Hills Habitat Conservation Program is focused on the protection of remaining high-quality forest systems and their associated biota within the Hardwood Hills ecological section of west-central Minnesota. Over 60 percent of forests in the Hardwood Hills have been lost to conversion over the past century, with lakeshore development and growth along the I-94 corridor near St. Cloud posing significant threats.
With this appropriation, the Minnesota Land Trust plans to protect approximately 500 acres of critical shoreline habitat along Minnesota's lakes, wetlands, rivers, and streams by securing permanent conservation easements and dedicating funds for their perpetual monitoring, management, and enforcement. Lands being considered for permanent protection in this round of funding are located in Becker, Beltrami, Blue Earth, Itasca, Kandiyohi, Lac Qui Parle, Le Sueur, Otter Tail, Pope, and Wabasha counties.
This project will conduct water quality monitoring at 12 stream sampling sites. The sites will be monitored for chemical, physical, and bacteriological parameters over a two year time-period. The Headwaters Science Center (HSC) will be the lead agency and arrange volunteer cooperation from Trek North, Bemidji, Perham and/or Detroit Lakes High School students and their instructors. The HSC project lead will be responsible for oversight and full compliance to MPCA protocols.
Evaluation of Minnesota raptors, in rehabilitation and free ranging settings, for current or previous exposure to highly pathogenic avian influenza virus to better understand outbreak impacts to raptor populations.
This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.
This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of these major watersheds: Crow Wing River, Redeye River, and Long Prairie River.
This project will complete the development of two watershed HSPF models for the Mustinka River and Bois de Sioux River watersheds. These calibrated and validated executable models will simulate hydrology at the 12-digit HUC subbasin scale.
This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.