The projects planned for the grant funds focus on essential updates and enhancements to our historic building, ensuring that we can continue to provide a safe, welcoming, and inclusive space for all who visit. The proposed improvements include upgrading our HVAC system, kitchen, and security infrastructure; rebuilding the handicap ramp for improved accessibility; sourcing new patio furniture; and resealing the venue's dance floor. Each of these initiatives is designed to maintain the integrity of our facility while enhancing the experience of our diverse audience.
This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).
This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.
This project determines ambient background per- and polyfluoroalkyl substance (PFAS) levels in urban and non-urban soils. This information will help Minnesota develop management strategies for PFAS contaminated soils.
We will determine the distribution, relative density, and spatial occupancy patterns of 3 small weasel species in Minnesota to fill key knowledge gaps in weasel distribution and status in Minnesota.
Acquire approximately 400 acres of high priority habitat for designation as Wildlife Management Area (Prairie Planning Section) or Scientific and Natural Area (Prairie, and Forest/Prairie Planning Sections) emphasizing Minnesota Prairie Conservation Plan implementation and coordination with partners. All lands will be open for public hunting and fishing (a limited number of SNA’s are proposed for limited hunting for instance archery only or hunting but no trapping).
Minnesota's iconic northern forests, wetlands, and brushland habitats require management beyond basic forestry practices or at smaller scales than commercial operations work. Other enhancements, such as brushland shearing or mowing have low commercial value but high wildlife value. These additional habitat enhancements improve the quality of the forests for both wildlife and outdoor recreation.
Grasslands continue to be the most threatened habitat in the state. This programmatic request will build on the DNR's history of enhancing and restoring grasslands, embedded wetlands, and oak savannas to increase wildlife populations. The Prairie Plan, Pheasant Plan, and Wildlife Action Plan will guide our efforts to ensure we are operating in a strategic and targeted manner.
Grasslands and wetlands in western Minnesota continues to be the most threatened habitat in the state. At the same time, the DNR continues to work to make the state's forests more productive for wildlife, timber, and other compatible uses. This request will realign and streamline previous funding requests by placing all DNR Roving Crews under a single proposal and appropriation.
We restored and enhanced a total of 40,539 grassland acres with 446 activities on Wildlife Management Areas, Scientific and Natural Areas, Native Prairie Bank easements, Waterfowl Production Areas, and National Wildlife Refuges.
Grasslands continue to be the most threatened habitat in the state. This programmatic request will build on the DNR's history of enhancing and restoring grasslands, embedded wetlands, and savannas to increase wildlife populations. The Prairie Plan, Pheasant Plan, and Wildlife Action Plan will guide our efforts and ensure we are operating in a strategic and targeted manner. This proposal will enhance and restore grasslands on parcels that are permanently protected and most open to public hunting.
This project supports continuing development of County Groundwater Atlases for approximately three years. The goal is to provide this valuable water and resource management information infrastructure to every county.
The following table provides a short summary of the accomplishments under this appropriation. In total, the DNR enhanced and restored 283 sites for a total of 17,087 acres.
With this appropriation, the DNR enhanced and restored over 11,700 acres of public lands or permanently protected private lands under easement. Projects under this appropriation included prescribed fire, prescribed or conservation grazing, woody removal, and enhancing plant diversity. With this appropriation we were able to exceed our target acreage by 38 percent.
We restored 2,081 acres of grassland and enhanced 42,425 acres of grassland for a total of 44,506 acres of wildlife habitat across 329 sites with these funds.