The Children's Discovery Museum in Grand Rapids, Minnesota will increase access and deepen engagement with their effectively proven School Service Program. The museum will take down the economic barriers and increase enrollment. This grant will fund more educators and facilitators, curriculum development, scholarship aid, transportation assistance and art/teaching supplies.
Connecting students from Northeastern Minnesota, especially Ely and Cook County schools, to the Boundary Waters Canoe Area Wilderness through grade-wide day trips and overnight wilderness experiences during the school year.
This project will finalize the Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.
The goal of this project is to calculate an additional bacteria total maximum daily load and incorporating that information in the Total Maximum Daily Load Report (TMDL) and the Watershed Restoration and Protection Strategy (WRAPS) report. Other services that will be provided during this project are technical assistance, assistance with responses to comments received during the public notice process, incorporating public comments into the documents and preparing the documents for final federal and state approval.
A second opinion for a treatment proposal for the inspection certificate recovered from the shipwreck of the steamer Thomas Wilson was obtained by the Lake Superior Maritime Museum Association. The clearly written report, including detailed recommendations, was prepared by a qualified paper conservator. The LSMMA is now able to prioritize where this project fits into their Long Range Plan.
The purpose of the project is to create a fresh introduction to the museum. The five panels that previously lined the wall outside the museum doorway were put in place nearly thirty years ago in the1980s. These panels have faded over the years and were in need of replacement. In addtion there was a desire to expand the time line back to the Paleolithic peoples who first inhabited the region in about 10,000 years ago.
to install 10 solar electric trash compactor units and 10 recycling trash units to be placed along the Lakewalk Trail starting at Bayfront Festival Park and ending at 47th Avenue East
To hire qualified professionals to repair exterior masonry and other features on the Tower Fire Hall, listed in the National Register of Historic Places.
A professional historian was hired to prepare a nomination of the Duluth Missabe and Iron Range Depot to the National Register of Historic Places. The project's documentation was found to meet Secretary of Interior standards. The Depot was determined to be eligible for National Register Nomination.
Turtle Island Skywatchers - Innovative Research and Data Visualization project works to protect Minnesota water, wildlife, and natural resources while empowering Indigenous youth as leaders and all citizens as researchers.
This project is the second phase of updating the Two Rivers watershed Hydrologic Simulation Program FORTRAN (HSPF) model. This project includes calibration of the model and including a proposed impoundment in the model. An analysis of possible downstream water quality impacts will also be done.
The primary objective of this project is to extend the simulation period of the Two Rivers Watershed Hydrological Simulation Program FORTRAN (HSPF) model through 2017 to support future simulation and assessment of the planned Klondike impoundment.
The goals of Phase I of the TRW WRAP are to: 1) gather or develop watershed data needed for the development of the Watershed Restoration and Protection Strategy; and 2) establish project and sub-basin work groups, develop a social outcomes strategy, and develop a civic engagement evaluation strategy to guide the WRAP project.