Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogenbest management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators onissues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigationscheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reducenitrogen leaching losses in irrigated cropping systems.
The goal of this project is to finalize the draft Lake Pepin Total Maximum Daily Load (TMDL) Report, issue it for public comment, address comments, and finalize the report. Lake Pepin is impaired by high levels of nutrients that cause excessive growth of algae. High levels of sediment, carried in by major river systems, also affect the lake. The sediment is filling in the lake at a much faster rate than before Minnesota was settled and intensely farmed. Nutrients and sediment are distinct yet inter-related pollutants, and are being addressed in separate TMDL reports.
The Lower Mississippi River Feedlot Management in MN project will be leveraging State funding from BWSR to provide match for a United States Department of Agriculture Natural Resources Conservation Service (USDA-NRCS) Regional Conservations Partners Program (RCPP). BWSR will provide technical and financial assistance to plan and design projects to mitigate feedlot runoff from smaller (less than 300 animal units or AUs*), open lot feedlots in southeastern Minnesota.
Legacy funds allow the Minnesota Zoo to extend the season of the Wells Fargo Family Farm beyond its historical May to September season to include full programming and exhibits from April through November.
Minnesota Trout Unlimited and its partners, chapters, and volunteers enhanced habitat for trout, as well as other fish, game and wildlife, in or along 9 miles of coldwater streams around the state. We met our target for acres of enhanced habitat, by adapting to challenging conditions caused by the pandemic.
The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program – FORTRAN (HSPF) watershed model for a portion of the Mississippi River-Lake Pepin watershed.
DNR acquired a fee-title parcel designated as an Aquatic Management area in Itasca County. This acquisition protected 41 acres and exceeded the accomplishment plan goal. Nine trout stream conservation easements were also added to the AMA system. Two Forests for the Future easements with a combined total of 171 acres were acquired, achieving protection in priority watersheds while maintaining working forest in private ownership.