This project will finalize the Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.
Three streambank stabilization projects have been identified as high priority projects in the Thief River Falls Water Quality Study completed in 2017. The proposal will use a combination of bendway weirs, toe protection by building a floodplain bench and live stake plantings. It has been estimated that a total of 385 tons per year of sediment from these three locations is entering the river contributing to the impairment downstream.
The goal of this project is to calculate an additional bacteria total maximum daily load and incorporating that information in the Total Maximum Daily Load Report (TMDL) and the Watershed Restoration and Protection Strategy (WRAPS) report. Other services that will be provided during this project are technical assistance, assistance with responses to comments received during the public notice process, incorporating public comments into the documents and preparing the documents for final federal and state approval.
The goal of the project is to identify priority locations for project implementation using the Prioritize, Targeting, and Measuring Application (PTMApp) in the Thief River Watershed. The PTMApp will be used to identify and evaluate the suitability and effectiveness of best management practices including treatment scenarios, and provide estimates of sediment, nitrogen, and phosphorus delivered to the Thief River Watershed, which is impaired for sediment.
To do preservation work at the Thorstein Veblen Farmstead National Historic Landmark, located near Nerstrand, in Rice County, Minnesota, that will provide urgently needed stabilization and preservation of three out-buildings at the farmstead, including the original small barn, the large hay barn, and the granary.
The project will monitor nine key tributaries to the Long Prairie River for water chemistry and bacteria. The streams to be monitored include Eagle Creek, Turtle Creek, Moran Creek, Fish Trap Creek, an un-named creek which outlets to Lake Charlotte in the town of Long Prairie and three stream reaches of the Long Prairie River itself. All sites are located within Todd County with the exception of one which lies just over the border in Douglas County.
This project will inventory and conduct compliance inspections on Subsurface Treatment Systems (SSTS) around eight lakes in Todd County. Lakes to be inventoried include Big Sauk Lake, Big Swan Lake, Little Osakis Lake, Fairy Lake, Lily Lake, Long Lake, Little Birch Lake and Moose Lake. Approximately 1,200 parcels will receive compliance inspections. Systems that fail to meet standards will be brought into compliance using procedures available in rule and ordinance.
This project represents the third septic inventory effort by Todd County. The four lakes included - Guernsey, Juergans, Little Sauk, and Long Lakes - are all designated by the Sauk River Water District's Sauk Lake Management Unit as high priority for water quality improvement. Three of these lakes are listed as water quality-impaired for nutrients and the fourth - Long Lake - has had periodic e.Coli problems documented in several tributaries. This project will allow Todd County to expand on previous evaluations of 13 other lakes.
Todd County Septic Inspectors will research septic systems on 313 parcels that are located in the "highly vulnerable" portion of the City of Long Prairie's Drinking Water Supply Management Area. Each parcel's tanks and soil drain fields will be inspected for septic system compliance. Todd County will follow up with landowners found to have noncompliant systems in an effort to protect Long Prairie''s drinking water supply.
The SRWD, with assistance from local volunteers, will conduct water quality assessments on William Lake, Long Lake, Cedar Lake, Bass Lake. Felix Lake, Little Osakis Lake and Trout Creek to attain the necessary data to determine impairment status.
The proposed work will be the fifth septic inventory effort conducted by Todd County and will include eight lakes, 431 parcels, and 277 established addresses. Three of the lakes - Cedar, Long Higgens, and Pauley are located in the Sauk River Watershed District's Sauk Lake Management Unit which is a high priority for improvement. These are the last three lakes of any size to be completed in the Sauk River Watershed portion of Todd County. Nitrogen and phosphorus levels are an issue through the watershed and this management unit in particular.
Crack seal and seal coat 1.5 miles of trail at Lake Minnewashta Regional Park and 3.4 miles of trail on the Dakota Rail Regional Trail. This maintains user satisfaction of 164,000 visits, and 107,000 visits annually to Lake
This project will build off the success of the additional geographic information system (GIS) and water planning expertise the TSA8 added in 2016 to provide consistent mapping, water planning assistance and training to partners. This project will help soil and water conservation districts prepare for the 1W1P process before the planning starts. A unified protection methodology is essential for the 1W1P process to be successful. This project will include: unified GIS mapping and protection model for all nine counties respectively.
With roughly 70,000 residents, Minnesota is home to the largest Hmong population in the United States. The top spinning game of Tuj Lub (pronounced - too loo) has its roots in Southeast Asia and holds cultural significance to the Hmong community. Formal Tuj Lub courts, constructed near a multi-shelter picnic area at Keller Regional Park, seek
This project will complete a chloride management plan which will lay out a strategy for addressing chloride impacts to our surface waters for the 7-county metropolitan area. This chloride management plan will satisfy EPA requirements for impaired waters, address waters not yet listed, and develop a strategy to protect waters that are currently meeting the water quality standards.
This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.
The goal of this project is to assess groundwater sustainability in the I-94 corridor between the Twin Cities and St. Cloud due to the corridor's significant expected growth, the inerent natural limits of groundwater, and the vulnerability of groundwater to contamination.
Over the past 100 years, about half of Minnesota’s original 22 million acres of wetlands have been drained or filled. Some regions of the State have lost more than 90 percent of their original wetlands. The National Wetland Inventory, a program initiated in the 1970s, is an important tool used at all levels of government and by private industry, non-profit organizations, and private landowners for wetland regulation and management, land management and conservation planning, environmental impact assessment, and natural resource inventories.
This church, built in 1901 and listed in the National Register of Historic Places, had its electrical service updated. The main circuit breaker and subfeed panels were replaced. An outdoor electrical outlet was replaced and several more outlets were added to the interior. Larger supply wires were installed to improve capacity for future handicap accessible improvements to the building.
Though many parts of the Twin Cities metropolitan area are urbanized, there are also has large areas of natural lands that continue to serve as important habitat for fish, wildlife, and plant communities. However, pressure on these remaining lands continues to intensify as population and development pressures increase.
This project is for the editing the draft Watershed Restoration and Protection Strategy and Total Maximum Daily Load Reports resulting from comments received from Minnesota Pollution Control Agency and U.S. Environmental Protection Agency staff, preparing the documents for public notice, assisting with responding to public comments and preparing the final documents for final federal and state approval.
This project is for the editing the draft Watershed Restoration and Protection Strategy (WRAPS) and Total Maximum Daily Load (TMDL) reports resulting from comments received from Minnesota Pollution Control Agency and U.S. Environmental Protection Agency staff, preparing the documents for public notice, assisting with responding to public comments and preparing the final documents for final federal and state approval.
This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.