This project will review highly erodible land plans for landowner/operator compliance and update plans with landowners that are not meeting plan requirements due to changes in their operations.
Pond enhancement project to repair and expand an existing man made pond to improve outdoor recreational opportunities for park visitors that use the pond for fishing, boating and wildlife viewing.
Given access to resources & training, educators are in powerful positions to share stories of the people living on the land we call Minnesota. Through the work of Dr. Mato Nunpa, a team of Indigenous scholars & community interviews, Speaking Out Collective will examine how mass murder, wholesale land theft, enslavement and extermination were justified and taught in schools. By centering silenced Indigenous narratives, this project invites students, educators & districts to reconsider MN history.
We will characterize environmental drivers contributing to the decline of wild rice using lake sediment cores to reconstruct historical wild rice abundance in relation to lake and watershed stressors.
High sediment levels in streams are prevalent throughout South Eastern Minnesota. Installing proven and cost-effective conservation practices that collectively reverse these impairments while also meeting flood protection and ecosystem support goals are needed. The purpose of this project is to design, construct, and maintain two retention structures and restore approximately one mile of failed stream bank. This project integrates objectives of Olmsted County, the Department of Natural Resources and City of Rochester into a common project.
Minnesota Trout Unlimited, the Minnesota Land Trust, The Nature Conservancy, and Trust for Public Land will combine their expertise in six targeted watersheds to increase the resilience of remnant populations of brook trout unique to Southeast Minnesota. We will protect and enhance habitat in floodplains, along gullies, above steep slopes, and on bluffs to slow runoff, increase infiltration, and keep aquatic habitat productive.
This project will complete the final Implementation Plan, semi-annual and final reports and hold project meetings. The Implementation Plan will identify target areas and priorities for implementation strategies to improve water quality for Bluff Creek. This project will build the groundwork so Bluff Creek will meet water quality standards for aquatic life in the future.
Under the CREP partnership with USDA, 71 easements were recorded on a total of 4,365 acres to restore previously drained wetlands and adjacent uplands. The easements were accomplished with local implementation done by SWCD, NRCS and FSA staff within the 54 county CREP area and leveraged federal funds for both landowner payments and cost share for conservation practice installation.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 84 easements have been recorded for a total of 1,441 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 2,793.2 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
This program is a part of a comprehensive clean water strategy to prevent sediment and nutrients from entering our lakes, rivers, and streams; enhance fish and wildlife habitat; protect groundwater and wetlands. Specifically the Riparian Buffer Easement Program targets creating buffers on riparian lands adjacent to public waters, except wetlands. Through the Reinvest in Minnesota Program (RIM) and in partnership with Soil and Water Conservation Districts and private landowners, permanent conservation easements are purchased and buffers established.
We propose identifying hot spots of groundwater chloride pollution of surface waters due to excessive road salt use, which is a long term source increasing chloride impairment of surface waters.
The Root (HUC 07040008) and Upper Iowa/Mississippi River – Reno (HUC 07060002 and 07060001) watershed Hydrologic Simulation Program – FORTRAN (HSPF) models currently simulate hydrologic and water quality processes through 2015. In order to support work to update the existing WRAPS report, the two HSPF models will be extended through 2021.
The contractor will use the Scenario Application Manager (SAM) tool to build water quality restoration scenarios for the Root River watershed using the Hydrologic Simulation Program FORTRAN (HSPF) model. The SAM tool simulates total suspended solids (TSS) and nitrogen reductions based on implementation of various best management practices.