Wood Environment & Infrastructure Solutions, Inc. (Wood) was selected for this project to conduct work in support of the per- and polyfluoroalkyl substances (PFAS) program. This project is a multi-phased pilot study to further validate and refine potential locations across Minnesota that may have historically been, or are currently, contaminated with PFAS. The primary objective is to evaluate potential PFAS locations, specifically compost sites, to determine presence or absence of PFAS at each site.
The study will assess existing phosphorus data records and create a model to explain phosphorus loading into the Red River of the North. Studies have found that the majority of nutrient loading in the stream located in agricultural areas occurs with sediment loading since nutrients are typically bound to sediment particles.
To contractor will develop materials on the topic of phosphorus retention by bioretention media components. Information from the deliverables will be incorporated into the Minnesota Stormwater Manual, with the goal of providing information to MS4 permittees to facilitate compliance with Total Maximum Daily Load (TMDL) requirements in stormwater permits.
Establish a task force to coordinate efforts to remediate and restore Pig?s Eye Dump Superfund site and address PFAS contamination of Battle Creek, Pig's Eye Lake, and nearby groundwater.
A pilot program of wastewater treatment optimization without costly facility upgrades. This will lead to cleaner lakes and rivers without needless costs, and achieve significantly better treatment results.
The main goal of this pilot project is to use cutting-edge biological and data analysis methods to investigate, determine, and report on potential environmental stressors (including contaminants of emerging concern (CECs), adverse outcome pathways (AOPs, i.e., sub-organismal biological mechanisms that link environmental stressor occurrences to adverse organismal outcomes), and biological outcomes in urban surface and stormwater samples.
Phase II of this project will focus on source assessment, running watershed scenarios, Kego Lake TMDL, lake protection planning, Stressor identification and the continuation of the Civic Engagement components of the project. Information gathered in Phase II will be utilized in developing the WRAP report which will be developed in the future Phase III of the project.
This project is a continuation of a Total Maximum Daily Load (TMDL) study that addresses lake eutrophication (phosphorus) in two lakes that are on the 2014 United States Environmental Protection Agency 303(d) list of impaired waters, located in the Pine River Watershed. The contractor will be responding to public comment on the Pine River TMDL.
The purpose of this project is to address Environmental Protection Agency (EPA) comments on the pre-public notice draft Total Maximum Daily Load (TMDL) report that were received by Minnesota Pollution Control Agency (MPCA) in January 2016.
Samples will be taken from lakes and streams from the Kettle River Watershed. The sampling and monitoring of these waters will result in a better understanding of the water quality within the watershed. Having a better understanding of the water quality in the watershed can help when targeting where to put conservation projects on the ground.
This project will complete a Watershed Restoration and Protection (WRAP) Plan that includes a set of pollutant reduction and watershed management strategies to achieve water quality standards for the listed pollutants, and that are understood and adoptable by local units of government and other stakeholders. This project will also provide an important water quality framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.
The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.
The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality stream impairments and maintain or improve water quality of streams throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the streams and develop restoration and protection strategies for the streams in the Pioneer-Sarah Creek watershed.
The overall goal is to develop a Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study that will address water quality lake impairments and maintain or improve water quality of lakes throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the lakes and develop restoration and protection strategies for the lakes in the Pioneer-Sarah Creek watershed.
In 2022, the Minnesota Pollution Control Agency (MPCA) will engage in Intensive Watershed Monitoring in the Missouri River Basin which includes four watersheds. Through this agreement, the Pipestone Soil and Water Conservation District will assist with this effort by monitoring seven stream sites in three of the targeted watersheds. The sites are located on Medary Creek, Flandreau Creek, Pipestone Creek, Rock River (x2), Poplar Creek, and Chanarambie Creek. The sites were chosen by the MPCA and agreed upon by local entities.
The Platte River is listed by MPCA as impaired for fish bioassessments and water temperature. It is a recreational river used by many swimmers, paddlers and flotation users. The Platte is a major tributary to the Mississippi River which is the primary drinking water supply from St. Cloud to the Gulf. The Mississippi River segment immediately below Royalton is also impaired and therefore remedial efforts above are imperative.
The City of Annandale intends to implement stormwater infiltration systems to reduce stormwater discharge volumes and to prevent the discharge of nutrients and sediment from urban runoff into local water bodies.
This project is for the implementation of Best Management Practices (BMPs) that are effective at abating nonpoint source sediment runoff and E. coli to impaired waterbodies within the Plum Creek Watershed. BMPs will include on farm practices such as no-till farming and cover crops as well as structural practices within the watershed which includes 24 Water and Sediment Control Basins (WASCOB), 8 grade stabilization structures, and 2 miles of streambank stabilization monitoring. Implementation practices in this plan will work toward achieving water quality standards for both TSS and E.
Create the maximum acres of pollinator habitat at five Closed Landfill Program sites. These sites will act as pilot projects to inform future pollinator habitat reconstruction projects in the program.
This project will develop the Pomme de Terre Watershed Total Maximum Daily Load (TMDL) study for the second round of the 10-year watershed approach cycle in the Pomme de Terre watershed. This phase of the project will address 4 stream impairments and 3 lake impairments and produce a draft TMDL document. A second phase may be needed as the stressor ID report identifies more stream reaches with TMDL relevant stressors.
The goal is to facilitate strategic networking, learning, and participation of targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to become aware of water quality issues and increase best management practice adoption to restore and protect water quality in the Pomme de Terre River watershed. This goal will benefit the completion of the second cycle of the watershed approach by providing useful information important in the completion of Watershed Restoration and Protection Strategies (WRAPS) report.
The Pomme de Terre River Association will partner with the Minnesota Pollution Control Agency to conduct water quality monitoring in the Pomme de Terre River Watershed. The purpose will be to determine if waters meet the states non-point source pollution standards. The data collected will be utilized to produce the cycle two Watershed Restoration and Protection Strategy (WRAPS) report and supporting documents for the watershed. Through the utilization of this funding a total of 11 lakes and 7 stream reaches will be assessed.
This project will establish a framework with the Pomme de Terre River Association (PDTRA), county staff, Soil and Water Conservation District staff, and state agencies that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Pomme de Terre River watershed. This work will form the basis to establish restoration and protection strategies that local governments and watershed organizations can use to make decisions that will lead to protecting and restoring the waters in the watershed.
The goal of this project is to extend through 2016, calibrate, and validate the existing watershed model using Hydrological Simulation Program FORTRAN (HSPF) for the Pomme de Terre River Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) studies.
Certain stretches of the Pomme de Terre River have been identified as impaired. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the impaired stretches to an acceptable level. It will also identify strategies that would improve water quality in these impaired stretches. Some funds will support public input activities into the Pomme de Terre River watershed management plan.
This project is coordination and oversight of the contract to conduct tree clearing at the Ponds behind Erie Pier site in the St. Louis River Area of Concern.
The Pope Soil and Water Conservation District Chippewa River Watershed Surface Water Assessment Grant (SWAG) monitoring program will provide knowledge of water quality to local partners and the Minnesota Pollution Control Agency. Five sites, comprised of two lakes and three along two streams, will be monitored over the course of two years. There are 5 townships throughout the Chippewa watershed that each house a monitoring site: Nora, New Prairie , White Bear Lake, Barsness, and Gilchrist.
This project will develop feasibility analysis, a drawdown plan for Malmedal Lake and an analysis of available options for fish barriers in the watersheds of Malmedal Lake and Strandness Lake.
The project’s first phase includes development and implementation of a sampling plan to investigate stormwater quality within impervious areas; soil borings to determine the soil type; a topographical survey to determine drainage patterns and infrastructure locations; and data gathering of existing infrastructure. A season-long stormwater quality monitoring program will monitor stormwater within the drainage areas that flow directly to the storm sewer, including monitoring of roof runoff and overland flow to determine potential pollutant sources and mitigation options.
This project will develop and present to the MN association of townships on stormwater best management practices and National Pollutant Discharge Elimination System (NPDES) stormwater permits.
This project will create a section on pretreatment settling practices in the Minnesota Stormwater Manual. The result will include case studies on pretreatment settling practices.
Regional public projects that are the focus of the proposed project include: Infiltration areas and a sedimentation pond enhancement in subwatersheds N3/N4; Parking lot storm drain rain gardens and a sedimentation pond enlargement in subwatersheds N5/N6; An infiltration area and a sedimentation pond enhancement in subwatersheds S9/S11; Ditch checks along Highway 13 in subwatershed 10.
This project will result in a series of classes (provided by Minnesota Management and Budget's Enterprise Talent Development) to train the Minnesota Pollution Control Agency's Watershed Division to more effectively and efficiently manage watershed projects.
This will fund a competitive grant program for sewer projects that will help protect or restore the water quality of waters in national parks located within Minnesota.
This project is for technical assistance during the Lake Winona Nutrient Total Maximum Daily Load (TMDL) public notice and revisions to the document prior to sending to the Environmental Protection Agency (EPA) for final approval.
There are seven major watersheds Koochiching County, this project will work in five of them: Big Fork, Little Fork, Rapid River, Lower Rainy River, and Rainy River Headwaters watersheds. The local Koochiching County Soil and Water Conservation District (SWCD) is positioned to assist in several elements of the Watershed Restoration and Protection Strategy (WRAPS) process. This includes gap monitoring for water chemistry, sediment work, TMDL (Total Maximum Daily Load) development, modeling scenarios, and WRAPS development.
The purpose of this project is for North Saint Louis Soil and Water Conservation District to continue to assist with the Minnesota Pollution Control Agency's watershed approach and development of the Watershed Restoration and Protection Strategy (WRAPS) reports in the Rainy River-Headwaters and Vermilion River Watersheds.