The Root River Restoration project is 3,300 linear feet of stream bank and instream habitat restoration and monitoring located within Eagle Bluff and state owned land north of Lanesboro,
Over a century ago, the Roseau River in the northwestern corner of Roseau County was channelized by the State with the establishment of State Ditch 51. The Roseau River Watershed District and Minnesota DNR, through multiple phases, will cooperatively restore a total of 13.6 miles of river channel, adding 366 acres of high-quality large river habitat within the Roseau River WMA and enhancing the river's riparian habitat corridor. This project is the first phase and will begin progress towards restoring the Roseau River.
This multi-purpose project will partially restore a large drained lake, restore and reclaim stream reaches, provide water level management capacity to substantially improve wildlife habitat conditions and provide flood damage reduction benefits, and will contribute to water quality improvements in the Roseau River.
255 acres were acquired in 2021 using OHF funding. These are acres allowed the dike to be aligned with the beach ridge of the lake.
Construction of Phase 1 (see map) was initiated in September 2023. The northwest embankment was built and a weir steering the main flow of the Roseau River into a natural oxbow was installed. A water control structure (on Pine Creek) and finishing work on the dike will be completed this year.
to install a 16 panel photovoltaic system located on the northwest side of the Ruby Rupner Auditorium including a data acquisition monitoring system to help educate students and the public
In partnership with Anoka County and landowners, Anoka Conservation District will enhance Rum River habitat by utilizing eco-sensitive, habitat-building, bioengineering approaches to address active bank erosion on three to seven reaches. Sediment delivered from bank erosion threatens fish and mussel reproduction. The Rum River is a state designated Outstanding Resource Value Water and Wild, Scenic and Recreational River with eighty actively failing riverbanks in Anoka County alone. Project partners will address these in a phased approach utilizing CWF, LSOHC, and CPL funds.
This program will acquire 550 acres of prairie, wetland, forest and shoreline habitat for fish, game and wildlife along the Rum River and Cedar Creek in the cities of Oak Grove and Andover and will provide additional opportunities for public fishing, hunting and wildlife conservation.
This program will acquire the remaining 328 acres of prairie, wetland, forest and shoreline habitat for fish, game and wildlife along the Rum River and Cedar Creek in the cities of Oak Grove and Andover and will provide additional opportunities for public fishing, hunting and wildlife conservation.
The Wild and Scenic Rum River is a State Water Trail linking Mille Lacs Lake to the Mississippi River. Providing habitat for SGCN across two ecological provinces, the Rum also supports game fish and waterfowl. Land conversion, drainage, increased runoff, accelerated bank erosion, and invasive species threaten ecosystem stability of the Rum River corridor.
Pass-through grants to watershed districts and/or other local governments for design and construction of rural and farmstead ring levees within the Red River watershed (a.k.a. Basin).
Rehabilitation of State Trails Bridges on the Sakatah - Singing Hills State Trail between Waterville and Madison Lake (LeSueur and Blue Earth Counties).
This project entails reconstruction, resurfacing and widening 3.6 miles of the segment of the Sakatah Singing Hills State Trail from Mankato to 589th Avenue.
Protecting 980-acre LaSalle Lake property adjacent to the Upper Mississippi River, with biologically-significant forest habitat and miles of deep-lake and coldwater stream shoreline, to be managed by multiple DNR divisions.
This project restored fish passage from the Red River to 50 miles of quality upstream Lake Sturgeon and Walleye habitats in the Sand Hill River by modifying four structures and modifying the Sand Hill Lake Dam which currently block access. It also enhanced in stream habitat on the SH River.
Phase 2 of this project will complete fish passage restoration from the Red River to 47 miles of quality upstream habitat in the Sand Hill River watershed and enhance stream habitat in a degraded segment of the Sand Hill River.
This program will permanently protect, restore and enhance critical habitat within the Sauk River Watershed, which has experienced considerable habitat loss and is at high risk for more land conversion. Using conservation easements and fee land acquisition, we will protect approximately 660 acres of priority habitat in Minnesota's Prairie and Forest-Prairie Transition Area. We will restore/enhance approximately 224 acres of wetlands and accompanying uplands to create habitat for waterfowl and populations of Species in Greatest Conservation Need (SGCN).
This project will permanently protect, restore and enhance critical habitat within the Sauk River Watershed, which has experienced considerable habitat loss and is at high risk for more land use conversion. Using conservation easements and fee land acquisition, we will protect 750 acres of high priority habitat in Minnesota's Prairie and Forest-Prairie Transition Area and will restore/enhance approximately 66 acres of wetlands and accompanying uplands to create vital habitat for important waterfowl and Species of Greatest Conservation Need (SGCN) populations.
This project consists of habitat restoration, water quality and fish passage improvements through the removal of the existing fixed elevation dam, construction of rock arch rapids and in-stream habitat restoration.
Acquire approximately 44 acres along the Sauk River for a regional park to provide nature-based outdoor recreation including nature trails, canoe access, snow shoeing, and cross country skiing.
The Stearns County SWCD will not be using the LSOHC funding for the Sauk River Dam Fish Passage project due to the main project partner (City of Melrose) moving in a different direction with the dam and stream restoration.
Through the Sauk River Watershed Habitat Protection and Restoration program, the Partnership protected 726 acres (264 acres through fee simple acquisition and 462 acres through conservation easements). Additionally, the program restored/enhanced 780 acres of high priority habitat in the Sauk River Watershed. Overall, we achieved 111% of our land protection goal, 177% of our R/E acreage goal, and 397% of our proposed leverage goal. Our actions increased habitat connectivity, biodiversity, and landscape resilience.
This program permanently protects, restores, and enhances critical habitat within the Sauk River Watershed, which has experienced considerable habitat loss and is at high risk for more land use conversion. Using conservation easements and fee land acquisition, we will protect approximately 387 acres of high priority habitat in Minnesota's Prairie and Forest-Prairie Transition Area. We will restore/enhance approximately 107 acres of wetlands, stream corridors, and accompanying uplands, creating vital habitat for waterfowl, fishes, and populations of threatened and endangered species.
Lions Park improvements. Park is located on the rapids area of the Mississippi River. Enhance interaction with the river regionally with access points in this park.
This program permanently protects, restores, and enhances critical habitat within the Sauk River Watershed, which has experienced considerable habitat loss and is at high risk for more land use conversion. Using conservation easements and fee land acquisition, we will protect approximately 500 acres of high priority habitat in Minnesota's Prairie and Forest-Prairie Transition Area. We will restore/enhance approximately 74 acres of wetlands and accompanying uplands, creating vital habitat for waterfowl and populations of Species in Greatest Conservation Need (SGCN).
Complete construction-ready Gateway State Trail segment between Scandia Village Center and William O'Brien State Park with highway tunnel and trailhead parking lot on ROW already acquired by DNR.
This project upgraded 20 electric campsites at Scenic State Park to 50 amp service, and electrified 20 new campsites. This is a substantial improvement in providing this important service to RV campers.