With a population of approximately 3,500, the City of Mora is the largest municipality in the Snake River watershed. Monitoring indicates the city's Lake Mora has high levels of total phosphorus, total suspended solids, and other pollutants. This project will develop a plan that identifies several stormwater best management practices (BMPs) for the City of Mora and surrounding rural areas to address these impairments. Modeling and analysis will be used to target projects where they can provide the most benefit.
This project addresses the northeast St. Cloud drainage basin, the highest priority in the St. Cloud Stormwater Management Plan. St. Cloud has observed and documented ongoing sediment loading to the Mississippi River from the 367 acre watershed. The project is also a companion to the Green Roofs Blue Waters program in which several sediment reduction BMPs are being identified and installed along the Mississippi River.
The City of Cold Spring is looking to retrofit 24 acres of existing development within a 138 acre subcatchment of the City to improve the water quality of Cold Spring Creek, a designated trout stream. The large amounts of hard surfaces within the subcatchment area do not allow for rainfall or snow melt to soak into the ground. The stormwater carries with it sediment, bacteria, automotive fluids, and other pollutants. Cold Spring staff has frequently witnessed sediment plumes, the color of chocolate milk, at the storm sewer outfalls.
This project will enable community partners to implement 5-10 shoreline erosion reduction best management projects that will reduce sediment and improve water quality of county lakes and streams. Preference will be given to properties within a watershed of a Total Maximum Daily Load study, properties on a sentinel lake, properties on lakes and streams with active associations, and projects ranking high in sediment reduction amount. Projects may include engineered erosion reduction Best Management Practices and/or plantings.
This project will address impairments in the St. Croix, Kettle and Snake River Watersheds by reducing sediment and phosphorus delivery by encouraging private forest landowners within the St. Croix River Watershed in Pine County to re-establish riparian forest buffers, maintain existing riparian buffers and plant de-forested areas. It will develop a forest stewardship program and write forest stewardship plans in watersheds with the highest risk of impacts on water quality as listed by the Minnesota Forest Resources Council. This project will implement measures to achieve the St.
This project will improve water quality, reducing phosphorus annually by 1,842 in the St. Croix, Kettle and Snake River Watersheds in Pine County by establishing cover crops to reduce erosion and phosphorus/fertilizer applications, increase soil fertility, permeability, and microbe activity. A no-till drill will be purchased for use by agricultural producers for installing cover crops as a means of decreasing soil erosion, reducing phosphorus and fertilizer applications and increasing soil health.
The Wright Soil and Water Conservation District has partnered with the Crow River Organization of Waters (CROW) and the Natural Resources Conservation Service (NRCS) on phase two of this comprehensive sediment reduction project to focus on stabilizing five of the most active gully erosion sites in targeted subwatersheds on the North Fork Crow River, as well as use the installed best management practices to help promote future conservation practices.
The Middle Fork Crow River Watershed District is home to many natural resource organizations, all of which have a vested interest in the quality of local and regional resources. The District will provide financial assistance in the format of sub-grants to local partners to implement Best Management Practices to improve water quality.
Diamond Lake and its neighboring lakes feature numerous public water accesses, resorts, parks, and trails and are supported by the recreational and aesthetic values that good water quality provides. In 2006, Diamond Lake was placed on MPCA's List of Impaired Waters. Improving water quality in Diamond Lake to meet state standards is a top-ranking priority for the district.
This feasibility study will produce strategies for wetland restoration and ditch hydrology changes to reduce the amount of phosphorus and solids that drain into Typo and Martin Lakes, the Sunrise River and St. Croix River. Total Maximum Daily Loads and other plans have identified this area as key for pollutant reduction, and the study will determine scope and effects of potential projects, allowing the district to prioritize those that will have the great impact on water quality.
The downtown Chanhassen stormwater best management practice (BMP) retrofit assessment project will reduce watershed phosphorus loads to Rice Marsh Lake and improve the water quality in downstream Lake Riley, impaired for excess nutrients. This project will identify innovative BMP retrofit opportunities that target soluble phosphorus and promote infiltration and groundwater recharge within this highly-developed area. The downtown Chanhassen BMP retrofit assessment project will be performed in partnership with the City of Chanhassen.
There are currently more than 21,000 miles of drainage ditches and many thousands of miles of subsurface tile located throughout Minnesota and overseen by over 100 different local drainage authorities. Historically public records of these drainage systems have been maintained primarily in hard copy following differing protocols depending on local requirements. However, this antiquated approach limits the usability and accessibility of public drainage records creating various challenges for drainage management efforts.
This project will identify and prioritize opportunities to implement a multipurpose drainage management plan that will provide adequate drainage capacity, reduce peak flows and flooding and reduce erosion and sediment loading, improving water quality to the West Branch Rum River.
Le Sueur County has completed water quality assessments of its lakes, which are on the impaired waters list for excess nutrients. The Francis Rays Sakatah Tetonka Lakes Septic Inventory project will complete up to 400 shoreland septic compliance inspections, create an ArcMap GIS layer, create community assessment reports on priority areas and provide education and outreach to the public through informational meetings and website development. The project will also jump-start upgrading non-compliant septic systems.
This project will install nearly 800 linear feet of restored lakeshore with an emphasis on bioengineering techniques, native plants and locating buffers/swales at points of concentrated overland flow into Green Lake. By targeting properties that are eroding and/or with concentrated overland flow to the lake we will reduce suspended solids discharge by 16,697 lbs/yr and phosphorus by 1.3 lbs/yr.
Pasture and hayland account for 62% of the agricultural land use in Clearwater County. In 2012, it was the 12th largest producer of beef cattle in Minnesota. In a county where 22% of pasture/hayland acres are within 300 feet of riparian areas, management practices need to be introduced that enhance rather than restrict the farm operations that use these zones for their livelihood. Clearwater County's Silver Creek and Ruffy Brook are currently listed as impaired by fecal coliform.
The Middle Fork Crow River Watershed District will conduct a river assessment to determine the scope of eroding riverbanks and a stormwater modeling project to identify targeted locations for stormwater management. The river assessment will: 1) verify that streambank erosion is the major contributor of pollutants, including sediment, Phosphorus, and Nitrogen; 2) catalog and quantify the erosion, and; 3) provide an assessment of reductions that could be achieved using specific solutions.
The Kelle's Creek septic system assessment project will examine septic systems throughout the Kelle's Creek watershed to identify those systems that are non-functioning, non-compliant, or an imminent threat to public health and safety. Preliminary prioritization of the septic systems within the watershed will be based on the Washington County GIS database, followed by outreach to landowners to identify willing participants. Ultimately, this project will include inspection of up to 150 septic systems within the Kelle's Creek hydrologic boundary.
Faribault County Soil and Water Conservation District will develop two watershed plans using charettes, an intensive planning process used to engage citizens, conservation agencies, and others to collaborate on a vision for the development of a drainage watershed scale plan. The process allows landowners, producers, businesses, townships, cities and the county to partake in a comprehensive plan directly relating back to concerns and solutions related to surface water and nonpoint source pollution.
When completed, this Lake County-wide culvert inventory project will have multiple direct benefits to water quality protection, natural resource planning, and municipal asset protection. This inventory will be used to provide local and state authorities accurate information on the condition of road crossings, better calibrate hydrological modeling tools crucial to the inter-agency Watershed Restoration and Protection Strategies (WRAPS) process, and assess how road crossings in Lake County are affecting the water and sediment transport capacity of our waterways.
The goal of the Lake Volney Targeted Restoration project is to improve the water quality draining to Lake Volney, which is impaired for excess nutrients. The project contains eight priority areas and will install a variety of Best Management Practices, including stormwater basins, ag retention, wetland enhancement, and more.
The sixth largest fresh water lake in the United States, Lake of the Woods has sustained significant shoreline erosion through a number of high water events, high inflows from the Rainy River, sustained strong NW winds, and erodible soils on the southern shore. This project implements strategies to protect and enhance private shoreline on the lake by addressing long-term shoreline management.
This is a joint grant application from the Riley-Purgatory-Bluff Creek Watershed District (RPBCWD) and the City of Chanhassen. In 2010, the Minnesota Pollution Control Agency listed Lake Susan as a shallow lake impaired for excess nutrients. A 2013 report recommended a project located at the park pond immediately northwest of Lake Susan as the most cost-effective watershed implementation project. The project calls for an outlet control structure at a higher elevation that will provide increased dead pool storage and the installation of a Minnesota Filter to treat dissolved phosphorus.
This project will address the nutrient impairment of Lake St. Croix through the installation of targeted stormwater treatment best management practices as prioritized in the 2014 Lake St. Croix Direct Discharge Stormwater Retrofit Assessment. The project will install up to 16 Low Impact Development practices to reduce pollutant loading to Lake St. Croix by at least 8.0 pounds phosphorous and 3,000 pounds sediment and 1.0 acre foot of stormwater per year.
Past and current monitoring data has shown Ramsey County's Lambert Creek has high levels of total phosphorus (TP), anywhere from 0.14 mg/L to 0.30 mg/L, which is above the proposed State standard of 0.10 mg/L for streams in the Central Region.
This project is a cooperative effort between Crow Wing and Itasca County to contract with RMB Laboratories to generate 65 lake assessment/trend analysis reports. The watershed protection model is an innovative and proactive approach to water resource management which is geared towards prioritizing areas of concern, targeting implementation strategies, and measuring their effectiveness. These assessments are also useful and understandable tools for lake associations and the public.
The Little Rock Lake Total Maximum Daily Load study has identified areas in the watershed where phosphorus reduction is needed and what best management practices need to be applied. This is a coordinated implementation effort with Benton and Morrison Soil and Water Conservation Districts and Natural Resources Conservation Service, the Little Rock Lake Association, the livestock industry and other partners to install best management practices at numerous sites to continue cleaning up Little Rock Lake.
This project builds on the momentum of previous Clean Water Fund grants in making significant and quantifiable sediment, nutrient and runoff volume reductions to address the turbidity, dissolved oxygen and other impairments of the Lower Minnesota River (LMR). These water quality improvements will be achieved by constructing on-the-ground conservation best management practices (BMPs) in the targeted watersheds -including specifically Sand and Roberts Creek - and near channel sources.
The Marine on St. Croix Innovative Stormwater Management Implementation is a partnership, formalized through an MOU, between Marine on St. Croix (MOSC) and the Carnelian-Marine-St. Croix Watershed District (CMSCWD) to improve stormwater management in the most densely developed areas of the City on a neighborhood zone approach rather than site-by-site (parcel) approach for greater and more impactful results in accomplishing District and City stormwater management goals.
McLeod County will create an inspection database for 103E ditches under their drainage authority. The County will acquire a database software solution to conduct field inspections and to track ditch maintenance projects. This software will be used to facilitate statutory compliance including developing a process for completing the annual inspection and reporting requirements. The project will lead to improving the County's data management capabilities and better identification of drainage system needs that could lead to helping improve water courses that are impaired for turbidity.
The Cannon River Watershed includes approximately 941,000 acres of primarily agricultural landscape. Because of its large size, four subwatershed lobes are often referenced: Straight River Watershed, Upper Cannon River Watershed, Middle Cannon River Watershed, and the Lower Cannon River Watershed. Rice County is proposing utilizing LiDAR topographic data to determine areas of highest importance for Best Management Practice (BMP) Implementation for sediment within the Middle and Lower Cannon subwatersheds.
Many of the most experienced conservation practitioners at local soil and water conservation districts throughout the state are nearing retirement, and with their departure will go much of their practical, on-the-ground knowledge, experience, and skills. Meanwhile, college students seeking to be the next generation of conservation practitioners have knowledge of emerging technologies and other innovations that can improve and contribute to current conservation efforts.
The Clean Water Fund and OHF were used together to secure easements on buffer areas. Seven easements were recorded for a total of 606.5 acres. These acres represent 303.1 acres funded by OHF and 303.4 acres funded by non-OHF sources. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
This project will develop a plan that identifies several stormwater best management practices (BMPs) for the City of St. Bonifacius and surrounding rural areas. Implementation of these BMPs will improve water quality in Mud Lake and Halsted's Bay. A watershed model (EPA-SWMM and P8) will be developed to determine existing phosphorus and sediment loading from the City of Bonifacius and adjacent rural areas draining to Mud Lake. Model output will be used to identify several potential locations for stormwater BMPs throughout the city and surrounding areas.
This project engages private property owners in a neighborhood scale effort to install up to 180 stormwater Best Management Practice (BMPs) to protect Lake Nokomis, a water body in Minneapolis impaired for excess nutrients. An analysis of the Lake Nokomis subwatershed identified priority areas for BMP installations based on drainage pattern, land uses and presence of previously-constructed BMPs. The project will install 160-180 BMPs adjacent to alleyways to disconnect residential backyards, rooftops and driveways on 15 residential blocks.
The North Fork Crow River Watershed District will develop an inventory and inspection database for 103E ditches under their drainage authority. The district will acquire a database software solution to conduct field inspections and to track ditch maintenance projects throughout the district. This software will be used to facilitate statutory compliance including developing a process for completing annual inspection and reporting requirements.
Northern white cedar wetland plant communities provide unique ecological, economic, and wetland functions, including high value timber, long-term carbon storage, winter refuge for deer and other wildlife, wildlife habitat, and thermal buffering for brook trout streams. However, these plant communities have been declining in Minnesota for decades mostly as a result of development impacts. The Minnesota Board of Water and Soil Resources is using this appropriation to continue efforts aimed at improving the quantity and quality of white cedar wetland plant communities in Minnesota.
Within an 11-county area in southeastern Minnesota, two Nutrient Management Specialists will work directly with producers to reduce nitrogen, phosphorus, and fecal coliform runoff into surface and ground water in the region and the Mississippi River. The specialists will help producers create or revise nutrient management plans, implement Best Management Practices for manure and fertilizer use, and set up on-farm demonstration projects to support farmer-to-farmer learning.
This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.