Green Lakeshore Rehabilitation and Stormwater Treatment
This project will install nearly 800 linear feet of restored lakeshore with an emphasis on bioengineering techniques, native plants and locating buffers/swales at points of concentrated overland flow into Green Lake. By targeting properties that are eroding and/or with concentrated overland flow to the lake we will reduce suspended solids discharge by 16,697 lbs/yr and phosphorus by 1.3 lbs/yr.
See http://www.bwsr.state.mn.us/aboutbwsr/index.html and http://www.bwsr.state.mn.us/aboutbwsr/boarddirectory.pdf
See http://www.bwsr.state.mn.us/aboutbwsr/index.html
Nicole Clapp
This project will install nearly 800 linear feet of restored lakeshore on Green Lake with an emphasis on bioengineering techniques, native plants and buffers. By targeting properties that are eroding and/or with concentrated overland flow to the lake, sediment will be reduced by 8 tons per year and phosphorus will be reduced by approximately 1 per year. Est is a combo of WI NRCS bank erosion, BWSR bank erosion, Winslamm.
This project resulted in estimated reductions of 13 lb. of phosphorus per year and 7 tons of sediment per year
LOCAL LEVERAGED FUNDS