To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area by strengthening their management and/or infrastructure.
To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area by strengthening their management and/or infrastructure.
To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area by strengthening their management and/or infrastructure.
To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area by strengthening their management and/or infrastructure.
To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area by strengthening their management and/or infrastructure.
To enhance nonoprofit arts groups' ability to serve the artistic cultural and geographic diversity of the metro area by strengthening their management and/or infrastructure.
Funding to support the hire of a part-time development director and to work with a development consultant to create and execute a resource development plan.
Residents of Oronoco historically depended on individual wells for all of their potable water needs. Most of these wells are shallow or sand point types and may have elevated levels of nitrates.The City of Oronoco recently completed the first phase of a municipal water system project that will lessen the citizen dependence on individual wells. As residents are connected to the municipal system their existing wells are no longer needed. The wells should be sealed to prevent possible contamination of the city wells.Grant funds will be used to assist with the cost of sealing these wells.
The Otter Tail County Soil and Water Conservation Districts will work to complete individual lake assessments on thirty-eight lakes in Otter Tail County that have enough data for an assessment. These assessments will be incorporated into the County Water Plan and can be used by individual lake associations in completing a lake management plan. These assessments will greatly assist the County and the Soil and Water Conservation Districts prioritize future efforts for water quality improvements and protection projects.
The Otter Tail County Community Conservation Sub-grant Program enables community groups to go beyond planning and take action to protect their water resources. This grant program provides community groups with the means to make positive improvements now, and a venue to grow community and identify further water quality opportunities. Engaging community members in the identification of water protection opportunities helps build connections and foster a stewardship ethic.
This grant program provides community groups with the ability to make positive improvements, a venue to grow community and identify water quality opportunities. Engaging community members in the identification of water protection opportunities helps build connections and foster a stewardship ethic. Selecting projects requires community groups to collaboratively develop priorities among the range of water quality impacts. Implementing projects provides a unique active social enviroment that helps build connections and energy to motivate and grow the community into the next project.
The Otter Tail County Community Partners Grant Project will enable community groups to go beyond planning and take action to protect their water resources. This grant program will provide targeted community groups with the means to make positive improvements now and identify high priority projects for future opportunities. Engaging community members in the identification of water protection opportunities with the data in recently completed lake assessment reports will help build connections and foster a stewardship ethic.
This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.
The Otter Tail Water Management District (OTWMD) manages the wastewater for nearly 1,750 private residences near Otter Tail Lake, Deer Lake, and Lake Blanche. There OTWMD is responsible for 101 monitoring wells that were installed in 1984 and 1985 that are no longer being used and need to be properly sealed. The goal of this project is for the East Otter Tail Soil and Water Conservation District (EOTSWCD) to assist the OTWMD in properly sealing 100% of the monitoring wells that are located within the Otter Tail Surficial Aquifer.
The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.
The Otter Tail River is located in west-central Minnesota. Its Lower Otter Tail River (LOTR) reach is impaired for sediment. The LOTR begins at the dam of Orwell Reservoir near Fergus Falls and ends 48 river miles downstream at the confluence with the Bois de Sioux River at Breckenridge. No point sources contribute directly to the LOTR. Consequently, the turbidity impairment must be addressed through non-point measures. Current stream instability and bank erosion is largely a result of an 18-mile channel straightening completed by the Army Corps of Engineers in the 1950s.
This restoration and protection project will reduce the loading of sediment to the Otter Tail River by 440 tons/year. This is about 6.5% of the total reduction needed to meet the goals of the Lower Otter Tail TMDL Implementation Plan. The Otter Tail River downstream of Orwell Dam is impaired due to sediment, with stream bank erosion being the primary contributor. This stream bank restoration will include the installation of woody toe debris benches and the installation of a vegetated slope along a 1,400 foot reach of the river.
Watershed based implementation funds will be used to target conservation practices utilizing the principles associated with Prioritize, Target and Measure as referenced in our Local Comprehensive Watershed Management Plan. Implementation Funds are budgeted for the installation of best management practices and to support staff capacity necessary to implement the plan.
The Otter Tail River is impaired for turbidity. This project involves the installation of 45 side-inlet structures into Wilkin County Ditch 3-2 and 7-1 and 22 acres of buffer strips along the entire systems. Eleven miles of continuous berm will also be constructed along the ditch. When installed these water quality practices will become a permanent part of the ditch system and will be maintained by the ditch authority. These ditches outlet to the Otter Tail River just upstream from Breckenridge, MN. Together these water quality BMPs will reduce sediment loading by 1,375 tons/year.
The Straight River runs through Owatonna and is considered a priority water resource for the city. Untreated stormwater from city roofs, streets and parking lots are jeopardizing the water quality of river. Through this project, the city will install four rain gardens in city parks that will capture and rapidly absorb stormwater runoff from streets and driveways. The implentation of these rain gardens throughout the city will reduce the volume of stormwater entering the Straight River.
The Partners for Clean Water program will enable community groups to take action to improve their water resources. Engaging citizens directly in project development and installation efforts provides immediate water quality benefits and develops a community of active stewardship. Installation of projects previously developed by Douglas County community groups will shift the currently dormant water quality protection efforts.
The Douglas County Partners for Clean Water program enables community groups to take action and improve their water resources. Engaging citizens directly in project development and installation efforts provides immediate water quality benefits and cultivates a community of active stewardship.
This project is a cooperative effort including Cass Soil and Water Conservation District, the Association of Cass County Lakes (ACCL), and registered Homeowner Associations throughout Cass County. All of Cass Counties 514 lakes and streams eventually drain into the Upper Mississippi Watershed. Sediment and nutrient pollution continue to be a primary concern when addressing water quality protection issues.
The South Washington Watershed District has identified a series of priority sites to install filtration systems on aging storm sewer networks in the cities of Newport and St. Paul Park aimed at reducing sediment loads to the Mississippi River. SWWD is working with the cities to add stormwater treatment where there has historically been none. Prioritization has come from two recently completed subwatershed retrofit assessments, targeting specific storm sewer networks in the cities.
Perro Creek drains directly into the nutrient impaired St. Croix River. This project focuses on landowner outreach, design and installation of up to 10 bioinfiltration best management practices to reduce pollution from 85 acres of urban land draining directly into Perro Creek, then into Lake St. Croix with no water quality treatment. The installation of these practices will not only reduce stormwater volumes, but also the nutrients that are the root cause of the nutrient impairment in Lake St. Croix as well as the stormwater bacteria contributions to Perro Creek.
This project will fund the stream restoration of a failed, 30-year old sediment control structure in the Deer Creek subwatershed using natural channel design methods to restore the stream to a stable state. Since the dam breached an estimated 78 tons of sediment is transported annually to the turbidity-impaired Deer Creek.
Increases in crop prices have reduced the acreage of land in conservation set-aside programs such as the Conservation Reserve Program and other marginal land use. Significant conversion of grasslands to cultivated agricultural crops has increased the levels of runoff and sedimentation. Phase III of this project addresses the need to protect vulnerable sites by installing water and sediment basins. These basins are earthen embankments built to temporarily detain sediment-laden runoff, allowing sediment to settle out before runoff is discharged.
This project is Phase IV of work to install water and sediment basins located within Sand Hill Watershed. A water and sediment basin is an earthen embankment built so that sediment-laden runoff is temporarily detained, allowing sediment to settle out before runoff is discharge. These are installed on agricultural cropland where erosion exceeds the allowable soil rate. Minimum detention time to store water is 36 hours for a 10 year, 24 hour runoff event. Starting in 2010, the District received dollars to assist landowners with flood-related projects.