Perro Creek Stormwater Retrofits

Project Details by Fiscal Year
2022 Fiscal Year Funding Amount
$80,000
Fund Source
Clean Water Fund
Recipient
Washington Conservation District
Recipient Type
Local/Regional Government
Status
In Progress
Start Date
January 2022
End Date
December 2024
Activity Type
Grants/Contracts
Counties Affected
Washington
Washington
Project Details

This project proposes up to 4 structural stormwater best management practices (BMP?s) to reduce at least 8 lbs of phosphorous and 4,000 lbs of TSS from annual stormwater runoff within the Perro Creek watershed. This runoff discharges from 13.2 acres of urban land use directly into Perro Creek before outleting into Lake St. Croix with little to no water quality treatment.

This project will achieve the above results through the design and installation of up to 4 targeted practices identified in the prioritized catchments PC-4 and PC-5 of the Perro Creek Stormwater Retrofit Analysis. The installation of these practices will reduce the nutrient loading that are the root cause of the nutrient impairment in Lake St. Croix.

Competitive Grant Making Body
Board Members and Qualifications
Advisory Group Members and Qualifications
Conflict of Interest Disclosed
No
Conflict of Interest Contact

Annie Felix-Gerth

Legal Citation / Subdivision
Minnesota Session Laws - 2021, 1st Special Session, Chapter 1--H.F.No. 13, Article 2, Section 6(b)
Appropriation Language

(Projects and Practices)(b) $10,762,000 the first year and $11,504,000 the second year are for grants to local government units to protect and restore surface water and drinking water; to keep water on the land; to protect, enhance, and restore water quality in lakes, rivers, and streams; and to protect groundwater and drinking water, including feedlot water quality and subsurface sewage treatment system projects and stream bank, stream channel, shoreline restoration, and ravine stabilization projects. The projects must use practices demonstrated to be effective, be of long-lasting public benefit, include a match, and be consistent with total maximum daily load (TMDL) implementation plans, watershed restoration and protection strategies (WRAPS), or local water management plans or their equivalents. Up to 20 percent of this appropriation is available for land-treatment projects and practices that benefit drinking water.

2022 Fiscal Year Funding Amount
$80,000
Other Funds Leveraged
$0
Direct expenses
$0
Administration costs
$0
Number of full time equivalents funded
0.14
Proposed Measurable Outcome(s)

Targeting direct discharge locations prioritized in the Perro Creek Stormwater Retrofit Analysis, the proposed BMPs for this grant will reduce 8 lbs total phosphorus (TP) and 4,000 lbs TSS annually.

Source of Additional Funds

LOCAL LEVERAGED FUNDS

Recipient Board Members
Members for Washington Conservation District are: Bob Rosenquist, Diane Blake, Jen Oknich, Jim Levitt, John Rheinberger, Tim Behrends
Project Manager
First Name
Brett
Last Name
Stolpestad
Organization Name
Washington Conservation District
Street Address
455 Hayward Ave N
City
Oakdale
State
MN
Zip Code
55128
Email
bstolpestad@mnwcd.org
Administered By
Administered by
Location

520 Lafayette Road North
St. Paul, MN 55155

Phone
651- 296-3767