Phase 1 Design/Development Trailhead Rice Ck No RT, bituminous and natural surface trails, trailhead building with restrooms, entrance road and parking lot development, cross country ski staging area and trails, signage, storm water management, habitat restoration, landscaping.
Design, engineer, and reconstruct the trail bridge between Nicollet Island and BF Nelson Park. The bridge is a crucial trail link along the Mississippi River
Design, engineer, and construct Hall's Island and the Park on the Scherer Site within Above the Falls Regional Park, based on the Metropolitan Council approved Master Plan for that park.
Design, engineer, and construct Hall's Island and the Park on the Scherer Site within Above the Falls Regional Park, based on the Metropolitan Council approved Master Plan for that park.
At Central Mississippi Regional Park, implement the master plan including design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Implement the Water Works portion of the 2015 Central Mississippi Regional Park master plan pending adoption by the Metropolitan Council. Work will include design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Design & engineering to develop building plans for a addition to the Nature Center, Sugar Shack, Garden House, Shelters, and Maintenance Facility. Develop site plans for gathering nodes, observation, amenities, trails, landscaping, signage, stormwater management; initiate construction for site related improvements such as trails, gathering nodes, nature observation, signage, landscaping, and site amenities. Supplement construction costs for amenities on the Campus Site and Infrastructure project.
Design, engineering and construction of a picnic shelter with restroom facilities. Site work will include grading, erosion control, and stormwater management.
Design, engineering and construction of a picnic shelter with restroom facilities. Site work will include grading, erosion control, and stormwater management.
Project includes additional design, engineering, easements, potential acquisitions, construction of safety improvements related to the regional trail project specifically at intersections of the trail and private businesses and rail properties.
Project includes additional design, engineering, easements, potential acquisitions, construction of safety improvements related to the regional trail project specifically at intersections of the trail and private businesses and rail properties.
Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Project will complete the design and engineering necessary to construct 3.4 miles of paved trail connecting Lowry Nature Center in Carver Park to Lake Minnetonka Regional Park
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
Project will complete the design and engineering necessary to construct 3.4 miles of paved trail connecting Lowry Nature Center in Carver Park to Lake Minnetonka Regional Park
Design and construct an early learning center at Tamarack Nature Center, and pedestrian connections, landscape restoration, signage, and other site amenities at Bald Eagle Otter Lakes Regional Park.
Build ADA compliant, year round, multi-purpose, paved trail and boardwalk around Empire Lake; Construct 2 camper cabins; Improve/replace Empire Lake dike outlet; Install benches & site furnishings; landscaping and MP-approved improvements. Includes design, engineering, construction & construction administration.
Lake Elmo Park Reserve. Build Winter Recreation Area including plan winter recreation area, develop recreation facilities to accommodate evening use; install lighting for ski trails and site; develop roads and parking lot; remodel barn for use as a trailhead. A?
Central Mississippi Riverfront Regional Park, redevelop Boom Island & BF Nelson picnic area, including playground replacement, bike and pedestrian trails, wading pool. Central Mississippi Riverfront Regional Park, develop master plan. Central Mississippi Riverfront Regional Park, construct playground. A?