Motionpoems, a formerly all-volunteer startup poetry film initiative, will build capacity to present our 3rd annual screening in October 2011, renamed as THE BEST AMERICAN POETRY FILM FESTIVAL, at Open Book in Minneapolis, and will expand the impact of this annual hybrid film event on Minnesota artists and audiences.
The Library needed to build a more robust collection of Minnesota history books throughout all nine branches that would support it's programs. There are several specific content areas for programs including the Civil War, diversifying populations, environmental heritage and cultural heroes and institutions. 227 items were purchased and made available at all nine branches of the Washington County Library System either directly in the collection or by delivery to the branch.
To hire a qualified historian to complete an evaluation to determine eligibility for listing in the National Register of Historic Places for the Minnetonka Beach Water Tower.
To hire a qualified historian to complete an updated nomination to the National Register of Historic Places for the historic Minnetonka Town Hall, now owned and used by Minnetonka Community Church.
To support students' acquisition of Ojibwe and Dakota language and culture that begins in early childhood immersion at Anishinaabe Academy and firmly establish this learning into daily, regular classroom and community behavior. Strengthen and support the existing language pathways through 12th grade and extend our focus on the development and implementation of a strong Dakota language curriculum.
This project will assist our Misaabekong Program by strengthening the programming and learning opportunities we provide through quality immersion model.
A 5.8-mile shoreline assessment completed in Summer 2020 along the Mississippi River shoreline in Brooklyn Park comprehensively surveyed erosion issues and identified numerous riverfronts severely eroding into the river, contributing significant sediment and nutrient loads. The report catalogued these properties and identified a set of properties west of Banfill Island as the most critical and cost-effective for restoration.
This project is a documentary and includes working in partnership with East Side Freedom Library (ESFL) and Vietnamese Social Services (VSS) and with Cambodian American Partnership (CAP) as a program partner with the collaborative aim to provide a platform for Southeast Asian women to share their experiences preserving history, honoring more inclusively the lives impacted, and building awareness of these stories in Minnesota, of particular relevance for our state where Cambodian, Hmong, Laotian, and Vietnamese American communities established post-Vietnam War and continue to grow.
To conserve the seats, chairs and sofas in the car Missabe, an 1893 business car from the Duluth, Missabe and Northern Railroad. One set of sofa cushions needs to be recreated using historical methods and materials.
The project goal is to conduct water chemistry monitoring at four subwatershed sites and one basin site in 2016, 2017, 2018 and 2019. Water chemistry monitoring will be conducted at a wide range of flow conditions with emphasis of collecting samples during periods of moderate and high flows after runoff events, as defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.
The goal of this project is to simulate up to ten scenarios using the recently completed Hydrologic Simulation Program FORTRAN (HSPF) model for the Mississippi River–Lake Pepin (MRLP) watershed. The mode will be used to investigate a variety of management scenarios to support further planning work and implementation in the watershed. Model scenarios are being developed to inform 1W1P planning activities and future implementation.
Construction of an engineered and designed three-quarter mile segment of the Mississippi Blufflands State Trail along Red Wing's Mississippi River riverfront, from Barn Bluff Regional Park to Colvill Park.
The outcomes associated with this project are primarily aimed to support and serve as a foundation for phase 2 of Mississippi River - St. Cloud Cycle 2 WRAPS/TMDL project. Outcomes of this project will include an initial watershed stakeholder public participation event, the development of a general Public Participation outline with the establishment of a media tool like a watershed Share Point site, and an in depth analysis and up to date summary of the status/actions completed towards the Strategy Table goals noted within the various subwatersheds of the 2015 MRSC WRAPS report.
The Mississippi River-St. Cloud (MRSC) Watershed Restoration and Protection Strategy (WRAPS) Update project will provide an opportunity to evaluate the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for several of the impairments, prioritize water bodies for protection and restoration, and evaluate and recommend restoration and protection strategies.
In Phase 6, The Mississippi Headwaters Board in partnership with The Trust for Public Land and BWSR assisted by 8 County SWCDs will permanently protect an additional 1,235 acres of critical fish and wildlife habitat along the first 400 miles of the Mississippi River, its major tributaries, and 9 headwaters lakes.
This Phase 1 project will support project planning, coordination and civic engagement/outreach components of the Mississippi River (Headwaters) Major Watershed project. Phase 1 of this project will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and reviewing current and past watershed project data.
This project will build a working watershed SWAT model that can readily be used by the MPCA to provide information to support conventional parameter TMDLs and to identify critical areas for BMP installation/evaluation that can be supported by the efforts of the local Farmer Led Council as well as other land owners within the Mississippi River-Winona watershed.
The goal of this project is complete a dataset necessary for assessment of 6 stream sites and 11 lakes within the Mississippi Headwaters Watershed to determine the overall health of its water resources, to identify impaired waters, and to identify those waters in need of additional protection to prevent future impairments.
This project will investigate the effects of different farming practices on soil health and nitrogen loss in a minimally tilled, corn-soybean farming rotation in Southeast Minnesota. The project area is a roughly 20 acre, pattern tiled field that will be split into two fields of nearly equal sizes. This will be a paired comparison of a control field and a treatment field where cover crops will be employed. Nitrogen loss will be monitored via two tile control structures and routine collection and analysis of tile water.
The Mississippi Headwaters Watershed Comprehensive Plan area is located in north-central Minnesota, stretching from lake Itasca in Clearwater County to Lake Pokegama in Itasca county. The Watershed comprises five counties and is 1.2 million acres, of which 53% is publicly owned. The most significant land cover in the watershed is lakes and wetlands (46%), followed by forests (42%). The following actions for plan issues will continue to maintain high-quality resources and improve declining resources.
The Mississippi Headwaters Board in partnership with The Trust for Public Land and the Minnesota Board of Water and Soil Resources, assisted by 8 County Soil and Water Conservation Districts, will continue to permanently protect critical shorelands and wildlife habitats along the first 400 miles of the Mississippi River. Fee title acquisitions and conservation easements on priority lands will create and expand contiguous habitat corridors/complexes and reduce forest fragmentation from development to benefit fish, game and non-game wildlife, and migratory waterfowl.
This project will reconstruct an existing 8-foot-wide trail in disrepair by widening the trail width to 10 feet and repaving. Deliverables include a smooth safe trail upon completion. Intended outcomes are to provide a safe, smooth, consistent width on regional trails for user enjoyment
Design, engineer, and implement improvements called for in the 1982 plan for the Bohemian Flats area, and also improve various facilities throughout the park including trails, stairways, walls, and interpretive and wayfinding signs. These improvements will include trails, pathways, fishing and other river access, shoreline restoration, parking, informational signage, and visitor comfort facilities. The new master plan currently underway will use community participation to determine exact priority projects funded under this request.
This is a forest restoration project within the Mississippi National River and Recreation Area to address the loss of ash trees to EAB and plant 15,000 native trees and plants.
Maritime Heritage Minnesota completed a side and down imaging sonar survey of 104 miles of the Mississippi River in Aitkin County, as well as a small portion of Itasca County when the river meandered across the county line, in August 2010.
The project goal is to conduct water chemistry monitoring at three subwatershed sites in 2016-2019 and ongoing as needed in based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.
Whitewater Watershed Project will work in coordination with Winona County, Root River (Houston County) Soil and Water Conservation District (SWCD), and Wabasha County SWCD to collect water quality and chemistry parameters on eight Minnesota Pollution Control Agency (MPCA) approved stream sites and two lake sites within the Mississippi River Winona/La Crescent watershed during the 2020-2021 sampling season. Parameters to be tested include: TSS, TP, Chloride, CaCO3 (hardness), E. Coli, Chl - a corrected for Pheo, hardness, specific conductance, clarity, temperature, pH, DO.
The DNR has been charged by the legislature to develop rules that protect and manage the Mississippi River Corridor Critical Area (MRCCA) for natural resource, economic development, transportation, historic preservation, and other values. This project engages stakeholder groups in a public process to balance regulatory protections with local flexibility and control.