Grass Vadnais Lakes Regional Park, design and construct trail on east side of Vadnais Lakes, new bituminous trail and parallel turf trail; site and restoration improvements; improve storm water management; and site amenities.
Design and reconstruct approximately 12,300 lineal feet of bituminous trails in that portion of Hyland-Bush-Anderson Lakes Park Reserve managed by the City of Bloomington.
Rice Creek North Regional Trail. Design and construct approximately 4,200 lineal feet of the Rice Creek North Regional Trail from Hodgson Road to Baldwin City Park.
Construct 2.1 miles of paved trail between First Street in the City of Chaska and County Road 40 in the City of Carver on the Minnesota River Bluffs Regional Trail.
Design, engineer and reconstruct parking lots and driveways including demolition, grading, curb and gutter, paving, landscaping, parking lot lighting, trail lighting, utilities, retaining walls and associated storm water improvements at the Hyland-Bush-Anderson Lakes Regional Park Reserve, in particular, West Bush Lake Park. If project costs come in lower, City would utilize funds to install lighting on trail between Bandshell and Chalet parking lot.
Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Design, engineer and reconstruct rest rooms building, maintenance garage, driveway, sidewalks, lighting, utilities, associated storm water improvements including demolition, grading, curb and gutter, paving, retaining wall construction and landscaping at the Hyland-Bush-Anderson Lakes Regional Park Reserve.
Design, engineer and construct segment of the trail including grade separated crossing at Hwy 110 and Dodd Road intersection and a connection to Valley Park.
Design, engineer and construct segment of the trail including grade separated crossing at Hwy 110 and Dodd Road intersection and a connection to Valley Park.
Design and construction of Tamarack Nature Center Campus Site and Infrastructure consisting of parking lot and roadway redevelopment, storm water management, pedestrian connections, landscape restoration, signage, and other site amenities at Bald Eagle-Otter Lakes Regional Park; supplement construction cost for Early Childhood Learning Center Project; supplement construction cost for the Tamarack Nature Center Interior Remodel project. *(There were 99,352 visits to the Tamarack Nature Center in Bald Eagle Otter Lake Regional Park in 2013).
Design and construction of Tamarack Nature Center Campus Site and Infrastructure consisting of parking lot and roadway redevelopment, storm water management, pedestrian connections, landscape restoration, signage, and other site amenities at Bald Eagle-Otter Lakes Regional Park; supplement construction cost for Early Childhood Learning Center Project; supplement construction cost for the Tamarack Nature Center Interior Remodel project. *(There were 99,352 visits to the Tamarack Nature Center in Bald Eagle Otter Lake Regional Park in 2013).
Phase 1 Design/Development Trailhead Rice Ck No RT, bituminous and natural surface trails, trailhead building with restrooms, entrance road and parking lot development, cross country ski staging area and trails, signage, storm water management, habitat restoration, landscaping.
Design, engineer, and reconstruct the trail bridge between Nicollet Island and BF Nelson Park. The bridge is a crucial trail link along the Mississippi River
Design, engineer, and construct Hall's Island and the Park on the Scherer Site within Above the Falls Regional Park, based on the Metropolitan Council approved Master Plan for that park.
Design, engineer, and construct Hall's Island and the Park on the Scherer Site within Above the Falls Regional Park, based on the Metropolitan Council approved Master Plan for that park.
At Central Mississippi Regional Park, implement the master plan including design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Implement the Water Works portion of the 2015 Central Mississippi Regional Park master plan pending adoption by the Metropolitan Council. Work will include design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Design & engineering to develop building plans for a addition to the Nature Center, Sugar Shack, Garden House, Shelters, and Maintenance Facility. Develop site plans for gathering nodes, observation, amenities, trails, landscaping, signage, stormwater management; initiate construction for site related improvements such as trails, gathering nodes, nature observation, signage, landscaping, and site amenities. Supplement construction costs for amenities on the Campus Site and Infrastructure project.
Design, engineering and construction of a picnic shelter with restroom facilities. Site work will include grading, erosion control, and stormwater management.
Design, engineering and construction of a picnic shelter with restroom facilities. Site work will include grading, erosion control, and stormwater management.
Project includes additional design, engineering, easements, potential acquisitions, construction of safety improvements related to the regional trail project specifically at intersections of the trail and private businesses and rail properties.