Many of Minnesota's wetlands have been lost and the remainder degraded. Recent tiling and ditching have accelerated this situation. Through this program, shallow lakes and wetlands were designed, constructed, and intensively managed to benefit wetland wildlife and Minnesota residents. Habitat accomplishments from this proposal have enhanced 19,365 acres of wetlands and shallow lakes to benefit waterfowl and wetland wildlife. Work was accomplish through constructed infrastructure, cattail control, and a significant prescribed wetland burn.
This phase of WMA acquisition protected 1802.55 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting. With these 16 acquisition we have exceeded our planned acres of 1362 by more than 400 acres. Breaking down acres by ecological section we acquired 282 acres in the metro and 1520 acres in the prairie. We have a balance of $52,798 of grant funds and $81,837.48 in program income that will be returned despite exceeding our acre goals.
This proposal will accomplish shallow lake and wetland habitat work that will otherwise go unfunded. This work is called for in the Minnesota Prairie Conservation Plan, Long Range Duck Recovery Plan, and Shallow Lakes plan.
CMSM will build upon the work that began with its 2015-16 appropriation by (1) Remediation and further development of exhibit areas that promote Arts & Cultural Heritage (ACH) learning (2) Expanding ACH learning opportunities for new audiences at off-site locations; (3) Engaging an outside Evaluation Consultant to help plan/implement strategies that meaningfully assess ACH learning outcomes and impacts; (4) Boosting the Museum’s capacity to serve more school/early learning groups.
The Anoka Sand Plain Partnership restored / enhanced 3,714 acres of priority prairie, savanna, forest, wetland, and shoreline habitat on public lands and waters within the Anoka Sand Plain EcoRegion within the Metropolitan Urbanizing, Forest-Prairie, and Northern Forest regions. Total R/E acreage achieved over the course of the appropriation is 126% of our stated acreage goals, and was accomplished through a robust partnership of four direct recipients improving a total of 16 priority sites including WMAs, state forest, national wildlife refuges, city and county lands.
Great River Greening (GRG), Anoka Conservation District (ACD), Isanti County Parks (ICP) and National Wild Turkey Federation (NWTF) completed restoration and enhancement (R/E) activities on 1,896, equal to 147% of the planned 1,286 acres, and on 1.2 miles of shoreland, over 17 parcels.
Protect and restore approximately 80 acres in and near the Cannon River watershed, including wetlands, prairies, Big Woods forest, and river and shallow lake shoreline to reverse habitat loss, improve watershed function and provide access.
The Children's Discovery Museum in Grand Rapids, Minnesota will strengthen its acclaimed school service program by: (1) continued leadership of a new Program Director retained on January 1, 2016 (2) creating a new (Minnesota built) core interactive exhibit; (3) developing new curriculum for pre-school through 3rd grade students in ten northern Minnesota counties.
Supplement existing Design/Engineering services to complete site improvement plans for fishing nodes, trails, landscape, site amenities and signage. Construction activities will include demolition, grading, stormwater management, utilities, construction, landscaping, installation of signs and site amenities. Legacy funds will leverage non-state funds provided by Vadnais Lake Area Water Management Organization and Saint Paul Regional Watershed.
Full reconstruction of parking lots and associated entrance drives, path connections, and curbs into Como Regional Park, including asphalt and concrete removal, excavation, grading, stormwater management, erosion control, paving and concrete work, lighting, and landscaping
Complete important Como RP access road, Estabrook Drive, and related infrastructure, lighting, landscape restoration. Park hosts approximately 4,476,000 visits annually, representing people from many backgrounds.
The Conservation Partners Legacy Grant Program will be managed by the Department of Natural Resources to provide competitive matching grants of up to $400,000 to local, regional, state, and national non-profit organizations and government entities.
Battle Creek Regional Park establish wayfinding for cross-country ski trails at Battle Creek, Tamarack Nature Center and Grass-Vadnais-Snail Lakes Regional Park.
Continue Implementation of adopted Master Plan to include a splash pad (small artistic interactive water feature with year-round interest.) Indian Mounds hosts approximately 344,000 visits annually, including 13% of both African Americans and Asians, and 3% Native Americans.
Mississippi River Regional Trail. MnDOT identified and supported Mississippi River Regional Trail connection from Harriet Island Regional Park in St. Paul to the Mississippi River Trail in Dakota County. Design, engineering and construction for a combine
Grass Vadnais Lakes Regional Park, design and construct trail on east side of Vadnais Lakes, new bituminous trail and parallel turf trail; site and restoration improvements; improve storm water management; and site amenities.
Design and construction of Tamarack Nature Center Campus Site and Infrastructure consisting of parking lot and roadway redevelopment, storm water management, pedestrian connections, landscape restoration, signage, and other site amenities at Bald Eagle-Otter Lakes Regional Park; supplement construction cost for Early Childhood Learning Center Project; supplement construction cost for the Tamarack Nature Center Interior Remodel project. *(There were 99,352 visits to the Tamarack Nature Center in Bald Eagle Otter Lake Regional Park in 2013).
Phase 1 Design/Development Trailhead Rice Ck No RT, bituminous and natural surface trails, trailhead building with restrooms, entrance road and parking lot development, cross country ski staging area and trails, signage, storm water management, habitat restoration, landscaping.
Design and construct an early learning center at Tamarack Nature Center, and pedestrian connections, landscape restoration, signage, and other site amenities at Bald Eagle Otter Lakes Regional Park.
With this appropriation, the DNR enhanced and restored over 11,700 acres of public lands or permanently protected private lands under easement. Projects under this appropriation included prescribed fire, prescribed or conservation grazing, woody removal, and enhancing plant diversity. With this appropriation we were able to exceed our target acreage by 38 percent.
Work resulting from this appropriation resulted in the acquisition, development, and inclusion of 1,733 acres into the state Wildlife Management Area (WMA) system. We exceeded the projected acres by 56% and exceeded leverage by nearly 20%.
DNR modified six dams to allow fish passage and enhanced in stream habitat on two rivers with this appropriation. Also, habitat enhancement project were completed on 28 Aquatic Management Areas and three metro parks, totaling 1,002 acres. Stream habitat work for this appropriation and LSOHC-funded projects from other appropriations was aided by funding for a stream restoration coordinator and interns. These positions aided in public outreach, survey work, design, permitting, contracting, and coordination with project partners on these complex projects.
We restored 2,081 acres of grassland and enhanced 42,425 acres of grassland for a total of 44,506 acres of wildlife habitat across 329 sites with these funds.
Building on the exhibit development community engagement process carried out through four successive Legacy grants, the Children’s Museum of Southern Minnesota will use the 2014-15 direct appropriation to complete fabrication and installation of several exhibit components for its permanent facility. Local resources, volunteers, and community involvement will be combined with museum expertise to complete this process.
The program that we are proposing has three components; 1) weekly arts club that provides arts education and peer mentoring for youth that are designed to introduce youth to traditional Somali arts. 2) A Somali arts show and cultural learning opportunity taking place at The Southern Theater in Minneapolis through The Southern’s Arts Residency and Art Share Programs. 3) Showcasing Somali art at the Somali Independence day Festival in 2017.
The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.
Operating budget for project and equity initiatives in Mississippi River Gorge, Hidden Falls-Crosby Farm, Lilydale-Harriet Island-Cherokee-Raspberry Island, and Battle Creek-Indian Mounds-Pigs Eye Regional Parks, as well as Sam Morgan and Bruce Vento Regional Trails. Using principles and guidance from the Great River Passage Master Plan, initiatives will support innovative public engagement, establishing organizational partnerships, providing areas for cultural activities, and enhancing participation in natural resource based activities, programs, and multi-modal access.?
Minnesota’s use of groundwater has increased over the last two decades. An increasing reliance on groundwater may not be a sustainable path for continued economic growth and development. The DNR is establishing three pilot groundwater management areas (GWMA) to help improve groundwater appropriation decisions and help groundwater users better understand and plan for future groundwater needs associated with economic development.
This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.
In Phase 5, Friends of the Mississippi River and Great River Greening enhanced 277 acres at six sites, exceeding their goals by 48 acres (21%). The Minnesota Valley Trust acquired fee title to 32.4 acres for two high-priority additions to the Rapids Lake Unit, Minnesota Valley National Wildlife Refuge. The Minnesota Land Trust and the Trust for Public Land were unable to finalize their easement and fee title acquisitions when landowners changed their minds. OHF grant funds spent were leveraged more than 110% with $1,343,128 in other funds.
The Metro Big Rivers (MBR) partners successfully completed their work with the Phase 7 / ML2016 OHF appropriation. MBR exceeded original acreage goals by 14% and completed work on a total of 1,199 acres. Partners protected 145 acres through fee title acquisition and 194 acres through permanent conservation easement, restored 241 acres and enhanced 619 acres.
MBR 7 expended 99% of the OHF funds granted and leveraged the grant by 49% with almost $2 million in other funds.