Water control structures and dikes were designed and constructed on six Wildlife Management Areas (WMA) in the counties of Becker, Clearwater, Itasca, Lincoln, Roseau, and Yellow Medicine. Dike work at Roseau River WMA protects and enhances 3200 acres of wetlands wetlands in Pool 2 of the WMA. Roseau River WMA has 10 large water control structures, seven moist soil cells, and four large pools covering 11,800 acres. Cells for a moist soil unit were constructed at Lac Qui Parle WMA in Lac Qui Parle County.
Many of Minnesota's wetlands have been lost and the remainder degraded. Recent tiling and ditching have accelerated this situation. Through this program, shallow lakes and wetlands were designed, constructed, and intensively managed to benefit wetland wildlife and Minnesota residents. Habitat accomplishments from this proposal have enhanced 19,365 acres of wetlands and shallow lakes to benefit waterfowl and wetland wildlife. Work was accomplish through constructed infrastructure, cattail control, and a significant prescribed wetland burn.
This phase of WMA acquisition protected 1802.55 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting. With these 16 acquisition we have exceeded our planned acres of 1362 by more than 400 acres. Breaking down acres by ecological section we acquired 282 acres in the metro and 1520 acres in the prairie. We have a balance of $52,798 of grant funds and $81,837.48 in program income that will be returned despite exceeding our acre goals.
This appropriation funded 283 projects totaling 21,953 acres. The two largest types of enhancement were 112 woody removal projects totaling 10,160 acres and 134 prescribed burns totaling 10,082 acres. Additionally, we seeded 30 sites totaling 1386 acres, put in infrastructure for conservation grazing of 236 acres on 3 sites, conducted 3 oak savanna enhancements totaling 42 acres, and treated 47 acres of invasive species on 2 sites.
This proposal will address a backlog of shallow lake and wetland habitat work that will otherwise go unfunded. These projects will address work called for in the Minnesota Prairie Conservation Plan, Long Range Duck Recovery Plan, and Shallow Lakes plan.
We propose restoration and enhancement of prairie and savanna on WMA’s, SNA’s, and Native Prairie Banks in Minnesota and restoration and enhancement of bluff prairies on State Forest Land in southeast Minnesota.
This proposal will accomplish shallow lake and wetland habitat work that will otherwise go unfunded. This work is called for in the Minnesota Prairie Conservation Plan, Long Range Duck Recovery Plan, and Shallow Lakes plan.
CMSM opened its new permanent site with increased capacity to serve as an informal learning center that playfully engages children, families, and school groups in interactive experiences with the art and cultural heritage of southern Minnesota. With its current appropriation, CMSM is poised to strengthen its core as an institution that promotes arts and cultural heritage learning through continued
CMSM will build upon the work that began with its 2015-16 appropriation by (1) Remediation and further development of exhibit areas that promote Arts & Cultural Heritage (ACH) learning (2) Expanding ACH learning opportunities for new audiences at off-site locations; (3) Engaging an outside Evaluation Consultant to help plan/implement strategies that meaningfully assess ACH learning outcomes and impacts; (4) Boosting the Museum’s capacity to serve more school/early learning groups.
This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.
The Equity Alliance MN will bring to life absent narratives of Latino, Hmong, Native, Asian, African American, and women of the Civil Rights Era in a collaboration among youth, social studies teachers, Full Circle Theater (FCT), and St. Paul Neighborhood Network. The narratives, researched by youth, will be transformed by FCT into a six person play that will be presented, video recorded, and distributed with accompanying curriculum written by social studies teachers for teachers across the Equity Alliance MN and the state.
The goal of this project is to apply the Hydrological Simulation Program FORTRAN (HSPF) model to evaluate scenarios to support potential management actions and implementation in the watershed, construct Total Maximum Daily Load (TMDL) studies, and to develop a conceptual site model of the lakes for understanding phosphorus release.
This program will protect ~510 acres and restore ~200 acres near Cannon River Headwaters including wetlands, Big Woods forest, and river & shallow lake shoreline to reverse habitat loss, improve watershed function, and provide access
Complete section 3 of Watershed Restoration and Protection Strategy (WRAPS) document for the Cannon and Zumbro Watersheds and provide input to sections 1 and 2.
Through fee-title acquisition, the Trust for Public Land permanently protected 242 acres (88% of our goal) in the Cannon River Watershed. This resulted in one new Wildlife Management Areas (WMA) and four additions to existing WMAs. Now publicly accessible, these protected areas include wetland, prairie, and "Big Woods" forest habitat. The permanent preservation of these places has reversed habitat loss, allowed for habitat restoration, and increased access to public lands for hunting, fishing, hiking, and other outdoor recreation opportunities.
Protect and restore approximately 80 acres in and near the Cannon River watershed, including wetlands, prairies, Big Woods forest, and river and shallow lake shoreline to reverse habitat loss, improve watershed function and provide access.
This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.
The Children's Discovery Museum in Grand Rapids, Minnesota aims to strengthen its highly successful School Service Program by retaining a Program development coordinator, changing core interactive exhibits and creating new curriculum for pre-school and K - 5 students in ten northern Minnesota counties.
The Children's Discovery Museum in Grand Rapids, Minnesota will strengthen its acclaimed school service program by: (1) continued leadership of a new Program Director retained on January 1, 2016 (2) creating a new (Minnesota built) core interactive exhibit; (3) developing new curriculum for pre-school through 3rd grade students in ten northern Minnesota counties.
The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.
With the ML 2015 appropriation The Conservation Partners Legacy (CPL) Grant Program awarded 70 grants, 22 of these grants were the metropolitan area. Over 24,000 acres were enhanced, 2,500 acres were restored, and 386 acres protected through these 70 projects. Thirty-eight counties had CPL projects completed in them through 47 unique organizations. The average project for the ML 2015 grants was $96,000, with few exceptions most projects were completed on time and many were under budget.
The Conservation Partners Legacy Grant Program will be managed by the Department of Natural Resources to provide competitive matching grants of up to $400,000 to local, regional, state, and national non-profit organizations and government entities.
This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.
Chisago County will coordinate up to three community dialogue meetings to inform its water planning decisions. The goal of the meetings will be to provide safe, productive and effective venues for citizens to become authentically engaged in the water planning process. The outcome of this Civic engagement work with Chisago County and their county water planning process will be a more engaged public in the County Water Planning Process.
This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).
This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.
This project will support the necessary activities for improving the water quality and biological community by reducing nutrients, sediment levels and managing in-stream habitat within the Goose Creek 10-digit HUC Watershed. This restoration and protection plan will identify pollutant load reduction estimates and management strategies that will be used to obtain the TMDL goals outlined in the plan.
This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.
This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans.
This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.
This project will consist of identifying the candidate causes of biological stress and to develop and implement a public and stakeholder participation process that encourages local ownership of water quality problems and solutions. The Stressor ID process will be done using existing data, identifying data gaps, gathering new data, developing load duration curves, and refinement of the candidate causes. The civic engagement work will include compiling and reviewing existing data on community capacity and assessing that information.
This project will build network and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection in Southeast Minnesota. The cohort will be administered through the Southeast Minnesota Water Resources Board (SE MN WRB) which is an area wide Joint Powers Board (JPB) established to help improve and protect the water resources of the area through coordinating local water planning efforts. This JPB has successfully administered water quality grants in the past that have positively impacted the water resources of this region.
This project will provide baseline data through water monitoring, recording and analyzing the results of six unassessed rivers/tributaries, three unassessed lakes and five storm water outlets in the city of Mora which drain to the Snake River; promote and implement approved BMP’s.
With this appropriation, the DNR enhanced and restored over 11,700 acres of public lands or permanently protected private lands under easement. Projects under this appropriation included prescribed fire, prescribed or conservation grazing, woody removal, and enhancing plant diversity. With this appropriation we were able to exceed our target acreage by 38 percent.
We will use a programmatic approach to achieve prioritized aquatic habitat protection, restoration, and enhancement of lakes and streams across all the LSOHC planning regions of Minnesota.
We restored 2,081 acres of grassland and enhanced 42,425 acres of grassland for a total of 44,506 acres of wildlife habitat across 329 sites with these funds.
This project will utilize a combination of wetland restoration, invasive tree removal, seeding, and prescribed fire, to improve habitat quality, diversity, and productivity on Wildlife Management Areas and Waterfowl Production Areas within the prairie and metro regions of Minnesota.