All Projects

74 Results for
Recipient
Pomme de Terre River Association JPB
2017 Fiscal Year Funding Amount
$246,441
Fund Source
Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association JPB
2017 Fiscal Year Funding Amount
$431,587
Fund Source

The goal of the Pomme de Terre River Association (JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. The Pomme de Terre River is currently not meeting state water quality for sediment. The purpose of this project is to strategically work towards a 53% sediment reduction goal at the mouth of the Pomme de Terre River based on a Watershed Restoration and Protection Strategy document.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Braun Intertec
2017 Fiscal Year Funding Amount
$80,687
2018 Fiscal Year Funding Amount
$17,828
Fund Source

This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.

Anoka
Hennepin
Ramsey
Recipient
Anoka Conservation District
2010 Fiscal Year Funding Amount
$400,000
Fund Source

A direct appropriation of $400,000 in FY 2010 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area (the law also provides $600,000 for this purpose in FY2011).

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Bassett Creek Watershed Management Organization
2010 Fiscal Year Funding Amount
$360,000
Fund Source

The Board of Water and Soil Resources is required to contract with the Conservation Corps of Minnesota and Iowa (formerly Minnesota Conservation Corps), or CCMI, for installation of conservation practices benefitting water quality for at least $500,000 in each year of the 2010-11 biennium.

Hennepin
Recipient
Bassett Creek WMC
2017 Fiscal Year Funding Amount
$400,000
Fund Source

The Plymouth Creek Restoration Project will improve water quality in Plymouth Creek and Medicine Lake, the creek's primary receiving water. The project will reduce total phosphorus and suspended sediment in Plymouth Creek and Medicine Lake stemming from streambank erosion. Streambank erosion is a common source of pollution, particularly in developed landscapes where flows in streams are considered flashy and can easily scour unprotected and disturbed streambanks.

Hennepin
Recipient
Bassett Creek WMC
2017 Fiscal Year Funding Amount
$134,595
Fund Source

This project engages private property owners including non-profits, businesses, and institutions, in the Harrison Neighborhood of Near North Minneapolis to install storm water best management practices. The BMPs will reduce pollution in Bassett Creek including chlorides and bacteria, for which the creek is impaired. The primary focus is on Glenwood Avenue, a focal point in the community and a highly impervious area.

Hennepin
Recipient
Minnehaha Creek Watershed District
2010 Fiscal Year Funding Amount
$224,224
Fund Source

In South Minneapolis, the water quality of Diamond Lake has suffered in recent decades. In fact, the Minnehaha Creek Watershed District's (MCWD) analysis of water testing results designated the water quality grade as F. This is largely a result of water that rolls off roofs, yards, and streets in the 690-acreDiamond Lake watershed and ends up in the lake - bringing pollutants, debris and dirt with it.

Hennepin
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$62,485
Fund Source

This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$10,381
Fund Source

This project will address United States Environmental Protection Agency (EPA) comments on the preliminary draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft TMDL study and Watershed Restoration and Protection Strategy (WRAPS) report, and produce the public notice draft TMDL study and the public notice draft WRAPS report ready for public review and comment. Conduct one public meeting for each watershed to present public notice drafts of the TMDL study and WRAPS report for each watershed.

Grant
Otter Tail
Traverse
Wilkin
Recipient
Cass County Environmental Services Department
2010 Fiscal Year Funding Amount
$198,971
Fund Source

This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.

Aitkin
Becker
Beltrami
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Morrison
Otter Tail
St. Louis
Todd
Wadena
Recipient
Todd County
2017 Fiscal Year Funding Amount
$79,054
Fund Source

The purpose of this project is to project the ground water aquifer serving the City of Long Prairie through assisting low income landowners in the replacement of 12 sub-surface treatment systems that have been documented as failing to protect groundwater within the Long Prairie Drinking Water Supply Management Area. Although the primary driver is ground water protection, replacing these failing systems will also protect surface water of which Lake Charlotte is in close proximity.

Todd
Recipient
Crow Wing Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$45,964
Fund Source

This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.

Aitkin
Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$80,038
Fund Source

This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.

Aitkin
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Elm Creek WMC
2017 Fiscal Year Funding Amount
$200,000
Fund Source

Fish Lake is 238 acres and does not meet state water quality standards due to excessive nutrients. Through the Total Maximum Daily Load study, a recommendation was made to treat the lake with alum to achieve the state's water quality standards. The goal of this project is to reduce the phosphorus load to Fish Lake by 310 pounds per year and meet the needed phosphorus reduction goal. The project will be completed as a partnership between the Elm Creek Water Management Commission, Three Rivers Park District, the City of Maple Grove, and The Fish Lake Area Resident's Association.

Hennepin
2025 Fiscal Year Funding Amount
$300,000
2024 Fiscal Year Funding Amount
$300,000
2023 Fiscal Year Funding Amount
$250,000
2022 Fiscal Year Funding Amount
$250,000
2021 Fiscal Year Funding Amount
$250,000
2020 Fiscal Year Funding Amount
$250,000
2019 Fiscal Year Funding Amount
$250,000
2018 Fiscal Year Funding Amount
$250,000
2017 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Fillmore
Goodhue
Houston
Hubbard
Isanti
Itasca
Kanabec
Koochiching
Lake
Lake of the Woods
Mahnomen
Mille Lacs
Morrison
Olmsted
Otter Tail
Pine
Roseau
Sherburne
St. Louis
Stearns
Todd
Wabasha
Wadena
Winona
2014 Fiscal Year Funding Amount
$1,808,000
Fund Source

Minnesota’s use of groundwater has increased over the last two decades. An increasing reliance on groundwater may not be a sustainable path for continued economic growth and development. The DNR is establishing three pilot groundwater management areas (GWMA) to help improve groundwater appropriation decisions and help groundwater users better understand and plan for future groundwater needs associated with economic development.

Clearwater
Douglas
Meeker
Swift
Wadena
Anoka
Becker
Hubbard
Pope
Ramsey
Stearns
Washington
Recipient
Hennepin County
2010 Fiscal Year Funding Amount
$500,000
Fund Source

The law also included a direct appropriation of $500,000 in FY2010 to Hennepin County for riparian restoration and stream bank stabilization in the county's 10 primary stream systems. The money is funding projects to protect, enhance and help restore the water quality of five streams and downstream receiving waters. Bassett Creek Plymouth Creek Nine Mile Creek Riley Creek Elm Creek

Hennepin
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$58,000
Fund Source

The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.

Becker
Douglas
Otter Tail
Todd
Wadena
2025 Fiscal Year Funding Amount
$150,000
2024 Fiscal Year Funding Amount
$150,000
2023 Fiscal Year Funding Amount
$135,000
2022 Fiscal Year Funding Amount
$135,000
2021 Fiscal Year Funding Amount
$150,000
2020 Fiscal Year Funding Amount
$150,000
2019 Fiscal Year Funding Amount
$110,000
2018 Fiscal Year Funding Amount
$110,000
2017 Fiscal Year Funding Amount
$110,000
2016 Fiscal Year Funding Amount
$110,000
2015 Fiscal Year Funding Amount
$110,000
2014 Fiscal Year Funding Amount
$110,000
Fund Source

Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogenbest management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators onissues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigationscheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reducenitrogen leaching losses in irrigated cropping systems.

Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Cass
Chippewa
Clay
Crow Wing
Dakota
Douglas
Goodhue
Grant
Hubbard
Isanti
Kandiyohi
Kittson
Lac qui Parle
Lincoln
Marshall
Meeker
Morrison
Mower
Norman
Otter Tail
Pipestone
Polk
Pope
Red Lake
Renville
Rice
Sherburne
Stearns
Stevens
Swift
Todd
Wabasha
Wadena
Washington
Watonwan
Wright
Recipient
AECOM, Inc.
2010 Fiscal Year Funding Amount
$35,000
Fund Source

Phase 4 of the Lake Winona Total Maximum Daily Load (TMDL) project will finalize the draft Lake Winona TMDL, dated November 2009, by completing additional data analysis, lake quality modeling, updating the TMDL report, and supporting the public involvement process.

Cass
Douglas
Morrison
Otter Tail
Todd
Recipient
Barr Engineering Co
2017 Fiscal Year Funding Amount
$67,039
Fund Source

This project addresses six lakes that have aquatic recreation impairments and one creek reach that has a bacteria impairment for E. coli. The project will evaluate the water quality impairments, complete pollutant source assessments, and establish loading capacities and allocations for the impairments.

Hennepin
2021 Fiscal Year Funding Amount
$0
2020 Fiscal Year Funding Amount
$0
2019 Fiscal Year Funding Amount
$0
2018 Fiscal Year Funding Amount
$0
2017 Fiscal Year Funding Amount
$0
2016 Fiscal Year Funding Amount
$0
2015 Fiscal Year Funding Amount
$0
2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$0
2012 Fiscal Year Funding Amount
$1,000,000
2011 Fiscal Year Funding Amount
$4,000,000
Fund Source

This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Washington
Wright
Sherburne
Recipient
Metropolitan Council
2010 Fiscal Year Funding Amount
$326,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites. Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek. Minnesota River: Tributaries include Eagle Creek, Riley Creek, and Willow Creek. St. Croix River: Tributary includes Valley Creek.

Wright
Washington
Stearns
Sibley
Sherburne
Scott
Rice
Renville
Pine
Nicollet
Morrison
Mille Lacs
Meeker
McLeod
Le Sueur
Isanti
Hennepin
Dakota
Chisago
Carver
Benton
Anoka
Recipient
Middle Fork Crow River Watershed District
2017 Fiscal Year Funding Amount
$152,717
Fund Source

The purpose of this monitoring project is to maintain water quality data collection, build upon existing data for Phase II of the Intensive Watershed Monitoring approach, and develop a better understanding of what impacts the rivers located in central Minnesota specifically in the North Fork Crow Watershed.

Hennepin
Kandiyohi
Meeker
Pope
Stearns
Wright
Recipient
Shingle Creek WMC
2017 Fiscal Year Funding Amount
$38,000
Fund Source

The purpose of this project is to conduct a subwatershed assessment of that part of the City of Minneapolis that is within the Shingle Creek watershed. This subwatershed drains to three Impaired Waters: Crystal Lake, Ryan Lake, and Shingle Creek. The assessment will identify the most feasible and cost-effective best management practices for retrofit in this densely urban, fully developed subwatershed. The project includes workshops with neighborhood organizations to help them educate residents and organize implementation projects.

Hennepin
Recipient
Minnehaha Creek WD
2017 Fiscal Year Funding Amount
$35,952
Fund Source

Both Minnehaha Creek and Lake Hiawatha are on the State Impaired Waters List and have had Total Maximum Daily Load Studies completed. The proposed work would focus on park land along Minnehaha Creek which is a highly-recreated corridor with public trail systems throughout. In 2014, the District experienced record flooding resulting in substantial erosion and tree loss along Minnehaha Creek. In 2015, the District completed an assessment of flood damage and received FEMA funding for bank repair at 31 sites along the Creek within Minneapolis Park and Recreation Board property.

Hennepin
2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$1,350,000
2012 Fiscal Year Funding Amount
$1,350,000
2011 Fiscal Year Funding Amount
$2,800,000
2010 Fiscal Year Funding Amount
$2,800,000
Fund Source

This project will create a high accuracy elevation dataset - critical for effectively planning and implementing water quality projects - for the state of Minnesota using LiDAR (Light Detection and Ranging) and geospatial mapping technologies. Although some areas of the state have been mapped previously, many counties remain unmapped or have insufficient or inadequate data. This multi-year project, to be completed in 2012, is a collaborative effort of Minnesota's Digital Elevation Committee and partners with county surveyors to ensure accuracy with ground-truthing.

Anoka
Benton
Carlton
Carver
Cook
Dakota
Goodhue
Hennepin
Isanti
Kanabec
Lake
Meeker
Mille Lacs
Morrison
Ramsey
Scott
Sherburne
St. Louis
Washington
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033
Fund Source

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Pope
Redwood
Renville
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
2014 Fiscal Year Funding Amount
$100,000
2011 Fiscal Year Funding Amount
$250,000
2010 Fiscal Year Funding Amount
$250,000
Fund Source

The DNR has been charged by the legislature to develop rules that protect and manage the Mississippi River Corridor Critical Area (MRCCA) for natural resource, economic development, transportation, historic preservation, and other values. This project engages stakeholder groups in a public process to balance regulatory protections with local flexibility and control.

Anoka
Dakota
Hennepin
Ramsey
Washington
Recipient
Hubbard County SWCD
2017 Fiscal Year Funding Amount
$48,350
Fund Source

Several important milestones will be completed during this phase of the Mississippi River (Headwaters) Watershed Restoration and Protection Strategy (WRAPS) project. These milestones will include the completion of the Stressor ID & Watershed Monitoring and Assessment Reports, the completion of the Zonation Modeling watershed priority planning process (through the continuation of the Civic Engagement project component), and the development of the overall WRAPS report.

Becker
Beltrami
Cass
Clearwater
Hubbard
Itasca
Recipient
Hubbard County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$120,000
2017 Fiscal Year Funding Amount
$48,349
Fund Source

Several important milestones will be completed during this Phase (Phase II) of the Mississippi River (Headwaters) Watershed Restoration and Protection Strategy (WRAPS) project. These milestones will include the completion of the Stressor ID & Watershed Monitoring and Assessment Reports, the completion of the Zonation Modeling watershed priority planning process (through the continuation of the Civic Engagement project component), and the development of the overall WRAPS report.

Becker
Beltrami
Cass
Clearwater
Hubbard
Itasca
Recipient
Minnesota Pollution Control Agency
2010 Fiscal Year Funding Amount
$4,432,804
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Anoka
Becker
Beltrami
Big Stone
Carver
Cass
Chippewa
Clearwater
Crow Wing
Dakota
Grant
Hennepin
Hubbard
Itasca
Kandiyohi
Koochiching
Lac qui Parle
Lincoln
Lyon
Morrison
Olmsted
Otter Tail
Ramsey
Redwood
Renville
Sherburne
Stevens
Todd
Traverse
Wabasha
Wadena
Washington
Wilkin
Wright
Yellow Medicine
Recipient
Shingle Creek Watershed Management Organization
2010 Fiscal Year Funding Amount
$160,000
Fund Source

This project will consist of retrofitting a dry storm water basin, constructing a new pre-treatment cell, creating new wetland, and reconfiguring the existing inlets and the outlet for better water quality treatment. This project is specifically identified in the Twin-Ryan Lakes TMDL.

Hennepin
Recipient
Nine Mile Creek Watershed District
2010 Fiscal Year Funding Amount
$136,000
Fund Source

The Nine Mile Creek watershed is a highly developed, urbanized watershed located in southern Hennepin County. The natural infiltration capacity of soils in the watershed has been diminished by significant coverage with hard surfaces such as streets, parking lots, and buildings. This leads to more rainfall making its way more quickly to Nine Mile Creek. As a result, Nine Mile Creek has experienced stream bank erosion and instream habitat loss due to increases in storm water runoff resulting in the creek to be listed on the State of Minnesota impaired waters list for biotic integrity.

Hennepin
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$109,928
Fund Source

The goal of this project is to refine the nutrient and algae simulation in the Minnesota River basin using all relevant available sources of information. The outcome of this work order is a revised Hydrological Simulation Program – FORTRAN (HSPF) watershed model application for the Minnesota River basin that correctly represents nutrient sources and algae.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$3,459
Fund Source

This project is a continuation of a Total Maximum Daily Load (TMDL) study that addresses lake eutrophication (phosphorus) in two lakes that are on the 2014 United States Environmental Protection Agency 303(d) list of impaired waters, located in the Pine River Watershed. The contractor will be responding to public comment on the Pine River TMDL.

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Wenck Associates Inc
2017 Fiscal Year Funding Amount
$8,471
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Pioneer Sarah Creek watershed, which is part of the North and South Fork Crow major watersheds. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Hennepin
Recipient
City of Brooklyn Park
2010 Fiscal Year Funding Amount
$10,000
Fund Source

Collect WLs from 44 wells and public ed

Hennepin
Recipient
Pomme de Tere River Association
2017 Fiscal Year Funding Amount
$46,133
Fund Source

The Pomme de Terre River Association will partner with the Minnesota Pollution Control Agency to conduct water quality monitoring in the Pomme de Terre River Watershed. The purpose will be to determine if waters meet the states non-point source pollution standards. The data collected will be utilized to produce the cycle two Watershed Restoration and Protection Strategy (WRAPS) report and supporting documents for the watershed. Through the utilization of this funding a total of 11 lakes and 7 stream reaches will be assessed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift