Upgrade software and hire consultant services to assist in providing multilingual services for park users in St. Croix Bluffs and Lake Elmo Park. Consultant tasks would include design guidance and direction in effective communication methods to non-native speakers
Lake Elmo Park Reserve. Complete Winter Recreation Area development that was started with FY 2010 Parks and Trails Fund grant including: plan winter recreation area project, develop or re-develop recreation facilities to accommodate evening use, install lighting for ski trails and site, develop roads and parking lot, remodel or replace barn for use as a trailhead, and provide signage and other amenities to enhance park visitor's experience
Lake Elmo Park Reserve. Construct trailhead building at winter recreation area, construct new well, septic, site lighting, trails, parking, and related infrastructure, landscaping and amenities.
An existing shelter and restroom facility will be replaced by a new multi use building at Cottage Grove Ravine Regional Park. The building may include restrooms, storage space, multi-purpose lobby space, equipment staging area and fire ring.
Lake Elmo Park Reserve. Build Winter Recreation Area including plan winter recreation area, develop recreation facilities to accommodate evening use; install lighting for ski trails and site; develop roads and parking lot; remodel barn for use as a trailhead. A?
Improve parking, buildings and other features at the Lake Elmo Swim Pond to better meet ADA standards and improve other park visitor needs. The swim pond area was originally developed in 1986. The park had 464,200 visits in 2013.
Improve parking, buildings and other features at the Lake Elmo Swim Pond to better meet ADA standards and improve other park visitor needs. The swim pond area was originally developed in 1986. The park had 464,200 visits in 2013.
Renovation and partial relocation of the roads and parking areas at the park; including improvements to buildings and other related facilities. The current park building was constructed in 1985. The park had 75,300 visits in 2013.
Renovation and partial relocation of the roads and parking areas at the park; including improvements to buildings and other related facilities. The current park building was constructed in 1985. The park had 75,300 visits in 2013.
Picnic shelter, restroom enclosures, ADA Trail, access road safety improvements, renovation of historic pump station, reconstruction of steps and trail for hiking access, interpretive kiosks, improvements to existing disc golf, mountain bike, hiking and cross country skiing trails, storage building, bike lockers, geocaching course and restoration of historic picnicking areas.
Hardwood Creek Regional Trail. Complete paving and other improvements to Hardwood Creek Regional Trail, which may include new trail sections toward Bald Eagle Regional Park.
Hardwood Creek Regional Trail. Complete paving and other improvements to Hardwood Creek Regional Trail, which may include new trail sections toward Bald Eagle Regional Park.
St. Croix Bluffs Regional Park. Replace campground shower building, dump station, well, septic, provide electric to campsites, water distribution to campground, trails, parking, and related infrastructure, landscaping.
This project replaced lighting park-wide to lower energy using alternatives, including compact fluorescents and LED. With this project, we are expecting to see a 20% reduction in energy use within the park.