This project will identify and prioritize opportunities to implement a multipurpose drainage management plan that will provide adequate drainage capacity, reduce peak flows and flooding and reduce erosion and sediment loading, improving water quality to the West Branch Rum River.
Monitoring the health of Minnesota rivers is vital in determining, maintaining, and improving the health of the rivers for the environment and public use. The scope of this project is to collect surface water chemistry samples at designated sampling locations during appropriate time periods and at appropriate frequencies during these time periods for 1 year beginning in February 2015. The data collected and submitted to MPCA will provide information necessary to determine stream characteristics and calculate water quality pollutant loads.
The goal of the High Island Creek Watershed Pollutant Load Monitoring project is to assist the Minnesota Pollution Control Agency (MPCA) with meeting the objectives of the Watershed Pollutant Load Monitoring Network (WPLMN). This will be accomplished by providing staff support throughout fiscal years 2016 and 2017 to conduct water chemistry monitoring at two specified stream locations from ice out through October 31 capturing snow melt, rainfall events and base flow conditions.
This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy (WRAPS) report to maintain and improve water quality for the Hawk Creek Watershed.
The goal of this project is to refine the segmentation, extend the simulation period, and recalibrate an existing Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Rum River Watershed.
Construct, calibrate, and validate three Hydrologic Simulation Program FORTRAN (HSPF) watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs).
The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models, which simulate flow and pollutant transport, need to be refined to be consistent with the most recent external sources of land use, hydrologic response, and surface flow attributions. The primary goal of this work is to refine the hydrologic calibration in the Minnesota River basin.
Lake George is the premier recreational lake in Anoka County with above average water quality, a vibrant fishery, and a large regional park and beach that is among the most utilized in the county. Located in northwestern Anoka County within the Upper Rum River Watershed Management Organization (URRWMO), the Lake George Improvement District (LGID) was formed to tend to the lake's diminishing water quality and problematic invasive species.
This project is to finalize the Total Maximum Daily Loads (TMDLs) and Watershed Restoration & Protection Strategies (WRAPS) for the Red Eye and Long Prairie Watersheds.
This project will implement five stormwater control BMPs and educate watershed landowners regarding proper management of stormwater control. These projects will serve to change behavior and perceptions of how stormwater may be managed, and demonstrate how easy changes may have a positive impact on land stewardship and water quality protection. 100 rain barrels will be distributed at a reduced cost to critical landowners.
The Clean Water Fund (CWF) and Outdoor Heritage Fund (OHF) were used together to secure easements on buffer areas. 71 easements have been recorded for a total of 1,083.9 acres and are reported in the output tables for the final report (acre total does not include Clean Water Fund acres). The total acreage from both CWF and OHF sources for recorded easements is 2,105.0 acres. Only the OHF acres are being reported in this final report to be consistent with the approved accomplishment plan.
The project goal is to conduct water chemistry monitoring at four subwatershed sites and one basin site in 2016, 2017, 2018 and 2019. Water chemistry monitoring will be conducted at a wide range of flow conditions with emphasis of collecting samples during periods of moderate and high flows after runoff events, as defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.
Phase 1 of this project is primarily geared towards project planning and coordination among project partners, developing an initial civic engagement strategic plan, holding a watershed kick-off meeting, and gathering and summarizing available water quality data.
This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.
The goal of this project is to analyze and document database architecture, platform, table structures, systems and data fields at six Minnesota agencies (Board of Soil and Water Resources, Department of Natural Resources, MN Department of Agriculture, MN Department of Health, Metropolitan Council, and MN Pollution Control Agency) for 30+ databases related to water.
Northern white cedar wetland plant communities provide unique ecological, economic, and wetland functions, including high value timber, long-term carbon storage, winter refuge for deer and other wildlife, wildlife habitat, and thermal buffering for brook trout streams. However, these plant communities have been declining in Minnesota for decades mostly as a result of development impacts. The Minnesota Board of Water and Soil Resources is using this appropriation to continue efforts aimed at improving the quantity and quality of white cedar wetland plant communities in Minnesota.
This project will focus on Watershed Restoration and Protetion Strategy (WRAPS) and Total Maximum Daily Load (TMDL) report development for the Rum River Watershed, which includes Mille Lacs Lake (the second largest lake in Minnesota) and the Rum River of which Mille Lacs Lake is the headwaters. The project will produce a plan that partners and citizens will be able to implement, a framework for citizen engagement, and a set of watershed management activities that will achieve water quality standards for all impairments within the watershed.
The Project and Outreach Coordinator will facilitate efforts within the watershed to provide landowner support and assistance in identifying areas in need of conservation plans and best management practices. The coordinator would use the Watershed Protection and Restoration Strategy Report and county water plans to target and prioritize outreach and education to maximize water quality benefits. This will greatly multiply the number of educated landowners in the watershed and increase the number of projects implemented.
Phase I built the foundation for the South Fork Crow River Watershed Restoration and Protection Strategy (WRAPS) and created a civic engagement plan. Civic engagement strategies were identified to create greater communication and watershed activities. Phase II provided the analytical and strategic foundation essential to prescribing protection and restoration strategies. These strategies focus on both protecting current fully supporting and restoring impaired surface water resources to water quality standards in the South Fork watershed.
This project will develop Total Maximum Daily Load (TMDL) allocations and complete a final draft TMDL report for the five lake impairments listed for the South Fork Crow River Watershed.
The goal of this project is to decrease nutrient loading in the lake and rivers within the Swan River Watershed. The Local Water Plan currently identifies surface water contamination and declining water clarity as a priority concern of Todd County. Agency members specifically identified the Swan River Watershed as an area of high priority for restoration efforts. Big Swan Lake is specifically mentioned for its roosting site for purple martins and for the unique wildlife resources it makes available in this subwatershed.
Todd County Septic Inspectors will research septic systems on 313 parcels that are located in the "highly vulnerable" portion of the City of Long Prairie's Drinking Water Supply Management Area. Each parcel's tanks and soil drain fields will be inspected for septic system compliance. Todd County will follow up with landowners found to have noncompliant systems in an effort to protect Long Prairie''s drinking water supply.
The proposed work will be the fifth septic inventory effort conducted by Todd County and will include eight lakes, 431 parcels, and 277 established addresses. Three of the lakes - Cedar, Long Higgens, and Pauley are located in the Sauk River Watershed District's Sauk Lake Management Unit which is a high priority for improvement. These are the last three lakes of any size to be completed in the Sauk River Watershed portion of Todd County. Nitrogen and phosphorus levels are an issue through the watershed and this management unit in particular.
This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.
This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.
The goal of this project is to calibrate, and validate three watershed models using the Hydrological Simulation Program FORTRAN (HSPF) model. The contractor will produce HSPF watershed models that can be further developed to provide information to support conventional parameter TMDLs. The contractor will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.
The Bird’s Eye Lake AMA acquisition has been completed. A portion of the land cost had come from this
appropriation, the 2016 Aquatic Habitat OHF appropriation, and by gifts matched with RIM Critical Habitat. This
tract consists of 52 acres, of which 5 acres are being reported on under this appropriation, as to not double count
acreage.