This project targets retrofit stormwater Best Management Practices (BMPs) on public land to assist partnering Local Government Units (LGUs) achieve water quality goals identified in local stormwater plans. The Dakota County Soil and Water Conservation District (SWCD) provides technical assistance and distributes Clean Water Funding (CWF) to leverage local funding through its time-proven Stormwater Retrofit Partnership (Partnership) cost share program.
This project is a continuation of the Dakota County Community Initiative, which has received Clean Water Funds in 2012 and 2013. It will provide cost share funding to organizations and associations who voluntarily construct medium sized water quality best management practices (BMPs) in Dakota County.
The City of Thief River Falls drinking water is taken from a 135 acre reservoir that is supplied by the Thief River and Red Lake River. Sedimentation and erosion have significant impacts to the waters in Pennington County. The reservoir is filling with sediment faster than expected. Buffers and side water inlets will help reduce sediment and improve water quality for these types of erosion. Buffers would also reduce nutrients polluting the waters in Pennington County and have a beneficial impact to the dissolved oxygen impairment on both the Red Lake and Thief River.
The Vermillion River Watershed Joint Powers Organization, in partnership with the City of Burnsville, is planning an overall improvement in the Alimagnet Lake subwatershed that consists retrofit two existing stormwater ponds that drain to Alimagnet Lake, a nutrient impaired water, with iron-enhanced sand filter benches. It is estimated that a significant amount of phosphorus reduction will be achieved by implementing this project, bringing Alimagnet Lake closer to state water quality standards.
As part of the Dakota County Transportation Department's highway 78 road reconstruction project, the Vermillion River Watershed Joint Powers Organization is partnering with Dakota County to install a nitrate treatment practice on a tributary to the South Branch Vermillion River adjacent to the road. The South Branch Vermillion River subwatershed is the highest nitrate loading subwatershed in the Vermillion River Watershed and is a significant contributor to contaminated drinking water in the eastern portion of the watershed.
South Creek is a tributary to the Vermillion River and a DNR-designated trout stream. Currently, the creek is not meeting state water quality standards for sediment, temperature and dissolved oxygen The Vermillion River Watershed Joint Powers Organization and the City of Lakeville propose to retrofit an existing stormwater pipe with a hydrodynamic separator to reduce the sediment load reaching South Creek and the Vermillion River. One hydrodynamic separator will be installed and is estimated to reduce sediment loads to South Creek and the Vermillion River by 4 tons per year.
The Vermillion River Watershed JPO is partnering with Dakota County and the City of Lakeville to enhance stormwater management along County Road 50. A treatment train approach with an iron-enhanced sand filter at the tail end to remove dissolved phosphorus will be implemented to treat a drainage area including a portion of the upstream neighborhoods that currently receive little to no stormwater treatment. The practice is anticipated to reduce 20 pounds of phosphorus annually from reaching Lake Marion, a water resource with high recreational value targeted for protection.
South Creek, a tributary to the Vermillion River and a DNR-designated trout stream. Currently, the creek is not meeting state water quality standards for sediment, temperature and dissolved oxygen and it flows through a large stormwater basin in the City of Lakeville. The Vermillion River Watershed Joint Powers Organization, in partnership with the city, propose to create a new channel for the creek in order to separate it from the pond. The result would be significantly cooler temperatures, increased dissolved oxygen, and less sediment-laden water in South Creek.
The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.
Numerous County ditch systems in Pennington County end at a natural drainage prior to outleting into a river or other watercourse and these outlets can be in a very erosive state. The goal of this project is to inventory these systems to determine needs and prioritize projects for implementation.
The City of Apple Valley will conduct a subwatershed assessment on the sections of Apple Valley draining to Keller Lake to target potential projects. The goal is to identify potential cost effective retrofit projects and operations improvements capable of fulfilling needed phosphorus reductions ahead of a number of planned infrastructure projects tentatively scheduled for 2018-2022.
The lack of sewage treatment in many small communities in Southeast Minnesota is causing surface water and groundwater pollution. Ten of these small communities will be the target of the technical assistance provided by this project. These communities have community or individual straight pipes which are discharging raw sewage directly into the environment, surfacing sewage, or have sewage contaminating groundwater.
The goal of the project is to identify priority locations for project implementation using the Prioritize, Targeting, and Measuring Application (PTMApp) in the Thief River Watershed. The PTMApp will be used to identify and evaluate the suitability and effectiveness of best management practices including treatment scenarios, and provide estimates of sediment, nitrogen, and phosphorus delivered to the Thief River Watershed, which is impaired for sediment.
This project will improve surface water quality within the sediment degraded Trout Brook, a designated trout stream and tributary to the Cannon River. The project will focus on the installation of best management practices that will reduce the amount of sediment transport within the watershed. Approximately 20 practices will be installed through this project which will reduce an estimated 2,000 tons of sediment per year.
The purpose of this project is to complete subwatershed analysis for Cannon River and Vermillion River sub-watersheds to prioritize and target Best Management Practices based on cost-effectiveness with regard to pollutant reduction. This process is intended to proactively assist local water management and partner agencies in maximizing the value of each dollar spent to improve water quality in the respective rivers.