Minnesota's Legacy

All Projects

Showing 1 - 40 of 177 | Export projects
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in in the 67 counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$200,000
Fund Source

Little Rock Lake experiences severe algae blooms due to excess phosphorus and these blooms are the worst known regionally. The goal of this project is to reduce algae blooms, improve water clarity, and avoid risk of drinking water contamination. The project will result in installing one farmer nutrient management project , four cover crops, two lakeshore buffer strips, six septic systems that also demonstrated an imminent threat to public health, six erosion control projects , one wetland restored, and one feedlot runoff control system.

Benton
Morrison
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
St. Louis County
2018 Fiscal Year Funding Amount
$100,000
Fund Source
St. Louis
Recipient
Benton SWCD
2019 Fiscal Year Funding Amount
$175,000
Fund Source

These funds will be utilized in cost-share for landowners to install Agricultural Best Management Practices following Little Rock Lake TMDL Implementation Plan. Example of projects include Feedlot Improvements, Waste Storage Facilities, Erosion Control BMPs, Filter Strips and Streambank Stabilizations. An estimated 830 pounds per year of phosphorus and 800 tons of sediment will be reduced annually.

Benton
Morrison
Recipient
SE SWCD Technical Support JPB
2013 Fiscal Year Funding Amount
$613,047
Fund Source

This project will fully fund three Nonpoint Engineering Assistance (NPEA) Joint Powers Board positions in cooperation with the NPEA Base Funding anticipated at $130,000 per year. This will allow a 2nd Professional Engineer to be retained in addition to a Lead Engineer and Technician. This 'accelerated' engineering previously was funded with BWSR Challenge Grants, and an EPA319 grant with corresponding BWSR CWF Matching Grant to handle the high workload associated with the large number of BWSR feedlot cost-share projects approved in South East Minnesota.

Dodge
Fillmore
Freeborn
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
SE SWCD Technical Support JPB
2013 Fiscal Year Funding Amount
$333,120
Fund Source

This project will extend two Feedlot Technical positions initially created and funded by a FY2011 CWF Feedlot Water Quality Grant that assess and help fix animal waste runoff from small feedlots. The technicians will work with and under the Technical Authority and priorities of the South East Soil and Water Conservation District Tech Support JPB lead Engineer. This project will enable more projects to be constructed resulting in a reduction of nitrogen, phosphorus and fecal coliform runoff into surface and ground water in South East Minnesota and the Mississippi River.

Dodge
Fillmore
Freeborn
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
Area 6 - South Central Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

South Central Technical Service Area (SCTSA) will use this Clean Water Fund grant to provide Soil and Water Conservation Districts and other local organizations in its eleven-county area with a Geographic Information System (GIS) Technician to assist in using available GIS information to target specific locations where Best Management Practices (BMPs) can be installed to help improve water quality.

Blue Earth
Brown
Faribault
Le Sueur
Martin
McLeod
Nicollet
Renville
Sibley
Waseca
Watonwan
Recipient
St Louis, South SWCD
2019 Fiscal Year Funding Amount
$426,641
Fund Source

The South St. Louis SWCD will collaborate with the City of Duluth to implement 13 stormwater BMPs in two high priority parks in the Miller Creek Watershed. The proposed BMP locations were prioritized by the city & SWCD based on the desire to coordinate with upcoming construction planned for Lincoln Park & on the sediment impacts resulting from worsening erosion problems in Piedmont Park.

St. Louis
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$42,987
Fund Source

This project will install new stormwater treatment practices in neighborhoods directly draining to Coon Lake. The objective is to remove phosphorus, which fuels algae growth, before the water is discharged into the lake. Seventeen potential project sites have been identified and ranked and include curb-cut rain gardens, swales, stabilizing stormwater discharge points, and a basin outlet modification.

Anoka
Recipient
Coon Creek WD
2020 Fiscal Year Funding Amount
$395,000
Fund Source
Anoka
Recipient
SE Minnesota Water Resources Board
2019 Fiscal Year Funding Amount
$269,356
Fund Source

This project will provide cost-share funds to landowners in vulnerable groundwater areas for the incorporation of cover crops in their crop rotation and to provide education related to nitrogen BMPs through field trials and Nutrient Management Plans. An anticipated 100 producers in highly vulnerable areas, will plant 3,000 acres of cover crops resulting in preventing potentially 19,800 pounds of nitrate from leaching into groundwater.

Dodge
Fillmore
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
Fillmore SWCD
2016 Fiscal Year Funding Amount
$804,385
Fund Source

After 6 years of intensive baseline monitoring at 5 edge-of-field sites, 1 intermittent and 3 in-stream sites in 3 sub-watersheds representing the geomorphic regions of the Root River, the second phase of the project is well prepared for the implementation of BMPs. Continued monitoring will be used to measure the effectiveness of the BMPs for the next 6 years. In preparation for BMP implementation, extensive planning was completed using LiDAR terrain analysis and the Tomer Framework to prioritize practices.

Fillmore
Houston
Recipient
Fillmore SWCD
2013 Fiscal Year Funding Amount
$45,240
Fund Source

Although agriculture dominates the landscape in the Root River watershed, urban stormwater is a component of the nonpoint sources that create the sediment load that is the main focus for reduction strategies in the draft turbidity TMDL report. This project will provide an opportunity to work with non-profits and other groups in local communities to implement stormwater practices that improve infiltration, storage and treatment of stormwater before it discharges into streams and rivers.

Fillmore
Recipient
Morrison Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$18,575
Fund Source

This site has been monitored for several years due to past storm events causing flood waters that impacted State Highway 371 and Belle Prairie housing developments. This site is contributing large amounts of sediment and is one of the worst erosion sites identified along the Mississippi River in Morrison County.

Morrison
Recipient
Le Sueur County
2015 Fiscal Year Funding Amount
$332,800
Fund Source

Le Sueur County has completed water quality assessments of its lakes, which are on the impaired waters list for excess nutrients. The Francis Rays Sakatah Tetonka Lakes Septic Inventory project will complete up to 400 shoreland septic compliance inspections, create an ArcMap GIS layer, create community assessment reports on priority areas and provide education and outreach to the public through informational meetings and website development. The project will also jump-start upgrading non-compliant septic systems.

Le Sueur
Recipient
Le Sueur County
2014 Fiscal Year Funding Amount
$110,700
Fund Source

The German-Jefferson Subordinate Service District Board (board) completed a voluntary septic inventory through the Clean Water Fund in 2013. 344 out of 754 parcels participated in the inventory. Approximately 50% of the septic systems were found to be non-compliant with MN Rules Chapter 7080. That project included an assessment of septic systems on non-participating properties that identified eleven priority areas in populated communities with small lots. Three community feasibility studies out of the eleven priority areas were conducted.

Le Sueur
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$88,590
Fund Source

This project will install an iron enhanced sand filter (IESF) to restore water quality in Golden Lake. Golden Lake is within a fully developed area of the Twin Cities, surrounded by residential land use, and the focal point of a city park. The IESF will achieve 11% of the phosphorus reduction (21 lbs/yr) required for Golden Lake to meet State water quality standards, as identified in the approved Total Maximum Daily Load (TMDL).

Anoka
Recipient
Area 3 - Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

Demand for Engineering services in Northeast Minnesota's nine-county Area III Technical Service Area is exceeding the capacity to deliver the needed services. There are increased requests from Soil and Water Conservation Districts for engineering needed to design and install Best Management Practices in part due to requests related to Clean Water Fund projects. These funds will be used to hire an engineer, which will increase engineering capacity and result in the completion of at least five additional projects per year.

Aitkin
Carlton
Cook
Kanabec
Lake
Mille Lacs
Pine
St. Louis
Recipient
Le Sueur County SWCD
2018 Fiscal Year Funding Amount
$387,100
Fund Source
Le Sueur
Recipient
St Louis, North SWCD
2016 Fiscal Year Funding Amount
$78,000
Fund Source

The North St. Louis Soil & Water Conservation District will work with lake and resort associations, chambers of commerce, and various community groups to identify 3-6 projects with maximum public benefit. Potential projects include community rain gardens, native vegetative buffers and shoreline restorations that improve water quality by reducing stormwater runoff, cleaning stormwater before it is released to the lakes and retaining water on the land longer.

St. Louis
Recipient
Le Sueur County
2015 Fiscal Year Funding Amount
$325,240
Fund Source

The goal of the Lake Volney Targeted Restoration project is to improve the water quality draining to Lake Volney, which is impaired for excess nutrients. The project contains eight priority areas and will install a variety of Best Management Practices, including stormwater basins, ag retention, wetland enhancement, and more.

Le Sueur
Recipient
Anoka CD
2016 Fiscal Year Funding Amount
$60,000
Fund Source

Lake George is the premier recreational lake in Anoka County with above average water quality, a vibrant fishery, and a large regional park and beach that is among the most utilized in the county. Located in northwestern Anoka County within the Upper Rum River Watershed Management Organization (URRWMO), the Lake George Improvement District (LGID) was formed to tend to the lake's diminishing water quality and problematic invasive species.

Anoka
Recipient
Le Sueur County SWCD
2020 Fiscal Year Funding Amount
$310,250
Fund Source
Le Sueur
Recipient
Benton SWCD
2014 Fiscal Year Funding Amount
$79,400
Fund Source

Little Rock Creek, a cold-water trout stream in central Minnesota, is impaired due to the lack of trout and other cold water fish. The trout are absent because of high water temperatures, low dissolved oxygen and high nitrate levels, stressors caused from a lack of base flow and overuse of groundwater. This project continues a 2011 initiative to assist irrigators in the Little Rock Creek groundwater recharge area with managing the timing and amount of irrigation applied to their crops.

Benton
Morrison
Recipient
Benton SWCD
2015 Fiscal Year Funding Amount
$227,500
Fund Source

The Little Rock Lake Total Maximum Daily Load study has identified areas in the watershed where phosphorus reduction is needed and what best management practices need to be applied. This is a coordinated implementation effort with Benton and Morrison Soil and Water Conservation Districts and Natural Resources Conservation Service, the Little Rock Lake Association, the livestock industry and other partners to install best management practices at numerous sites to continue cleaning up Little Rock Lake.

Benton
Morrison
Recipient
St. Louis County
2016 Fiscal Year Funding Amount
$200,000
Fund Source

St. Louis County's Comprehensive Water Management Plan Update 2010-2020 identifies providing financial assistance to qualifying homeowners to upgrade or replace failing septic systems as a Priority 2 action. Funds from the FY-16 Clean Water Fund Projects and Practices Grant will be used to provide funding to low-income homeowners to repair or replace SSTS identified as Imminent Threat to Public Health (ITPH) within the following watersheds: Lake Superior South, St.

St. Louis
Recipient
Coon Creek WD
2018 Fiscal Year Funding Amount
$195,158
Fund Source
Anoka
Recipient
Rice Creek WD
2019 Fiscal Year Funding Amount
$568,104
Fund Source

The Rice Creek Watershed District is proposing to improve water quality and habitat in Locke Lake and Lower Rice Creek by stabilizing stream banks and bluffs on Lower Rice Creek, reducing in-stream erosion and sediment delivery to Locke Lake, and improving in-stream habitat complexity for fish and invertebrates. Eleven bank stabilization practices would be installed over a continuous 5,400-foot reach in Lower Rice Creek. The anticipated outcome of this project is the prevention of 2,874 tons per year of sediment, which is 58% of the sediment reduction goals for Lower Rice Creek.

Anoka
Ramsey
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2019 Fiscal Year Funding Amount
$200,000
Fund Source

It is critical to train new staff, create modeling protocols for new BMPs, refine and calibrate models, and test ever-advancing modeling applications. The Metro Conservation District?s (MCD) Sub-Watershed Analysis (SWA) program provides these capacity-building services and unites efforts across 11 SWCDs. MCD proposes to analyze an additional 15 subwatersheds. The analyses will identify the location and estimated cost/benefit relationship for BMPs, evolve with new technology, and share discoveries metro-wide.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Coon Creek WD
2019 Fiscal Year Funding Amount
$382,772
Fund Source

This project will reduce sediment and nutrient loading by 141 tons of sediment and 120 pounds of phosphorus annually while improving in-stream and riparian habitat by restoring a 2/3-mile corridor of Middle Sand Creek. This project expands upon the Lower Sand Creek Corridor Restoration project funded in part by a FY18 CWF grant and results in the restoration of over a mile of contiguous stream corridor.

Anoka
Recipient
St. Louis County
2017 Fiscal Year Funding Amount
$205,000
2016 Fiscal Year Funding Amount
$2,500,000
Fund Source

This project will create a culvert inventory database for county and township roads in the southwest portion of St. Louis County that contains the St. Louis River watershed. Data will be used by the County Public Works Department to identify and prioritize stream crossings in need of replacement or increasing upstream storm water retention to reduce the potential for culvert failure during large runoff events, factoring in stream health (fish habitat and passage, sediment transport and hydrologic connection) while protecting infrastructure.

St. Louis
Recipient
St Louis, South SWCD
2014 Fiscal Year Funding Amount
$186,475
Fund Source

The Miller Hill Mall, a regional shopping destination located in the City of Duluth, is the largest contiguous impervious site in the Miller Creek Watershed. The draft Total Maximum Daily Load Study identified heated stormwater runoff as a major contributor to the creek's excessive heat loading problem, which negatively impacts the creek's native brook trout population. The Mall, along with eight other entities in the watershed, was assigned a reduction goal as part of the effort to address the temperature problem in this creek.

St. Louis
Recipient
Anoka, City of
2020 Fiscal Year Funding Amount
$653,326
Fund Source
Anoka
Recipient
Morrison Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$71,250
Fund Source

The Morrison County Board has stepped up their efforts to examine septic compliance for any septic not inspected within five years. They assigned the Local Water Plan task force to develop a pilot plan to show how it would work and whether further enforcement action is appropriate.

Morrison
Recipient
Greater Blue Earth River Basin Alliance
2017 Fiscal Year Funding Amount
$301,200
Fund Source

The Greater Blue Earth River Basin Alliance (GBERBA) along with Soil and Water Conservation Districts, Counties, landowners, and drainage authorities in the ten member counties will install conservation drainage practices to improve water quality. 103E drainage systems with documented sediment or water quality issues are the focus with the goal of installing 52 practices such as improved side inlets (grade stabilization structures), alternative tile inlets, denitrifying bioreactors, saturated buffers, storage wetlands and others.

Blue Earth
Brown
Cottonwood
Faribault
Freeborn
Jackson
Le Sueur
Martin
Waseca
Watonwan
Recipient
Area 7 - Southeast SWCD Technical Support
2015 Fiscal Year Funding Amount
$205,280
Fund Source

Within an 11-county area in southeastern Minnesota, two Nutrient Management Specialists will work directly with producers to reduce nitrogen, phosphorus, and fecal coliform runoff into surface and ground water in the region and the Mississippi River. The specialists will help producers create or revise nutrient management plans, implement Best Management Practices for manure and fertilizer use, and set up on-farm demonstration projects to support farmer-to-farmer learning.

Dodge
Fillmore
Freeborn
Goodhue
Houston
Mower
Olmsted
Rice
Steele
Wabasha
Winona
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$517,780
Fund Source

This Oak Glen Creek stormwater pond expansion and enhancement using an iron enhanced sand filter (IESF) is a partnership between the Anoka Conservation District (ACD) and a private company to protect a downstream corridor stabilization and improve the quality of stormwater discharged to the Mississippi River. Very little stormwater infrastructure currently exists in the 573 acre Oak Glen Creek subwatershed, and it discharges 147,519 pounds of sediment and 353 pounds of phosphorus to the Mississippi River annually.

Anoka
Recipient
Anoka CD
2020 Fiscal Year Funding Amount
$240,000
Fund Source
Anoka
Recipient
Fillmore SWCD
2014 Fiscal Year Funding Amount
$145,000
Fund Source

This project will, over a 27 month period, fund a 0.75 Full Time Equivalent Conservation Planning Specialist position to update approximately 400 United States Department of Agriculture Highly Erodable Lands conservation plans on 40,000 acres in high priority areas within the Root River watershed. Currently, only 5% of the USDA conservation plans -approximately 40 per year - are being checked for compliance, and this project will increase that number to 150 or more per year.

Fillmore
Houston
Mower