To provide professional development for one staff member at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for one staff member at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
To provide professional development for two staff members at the national American Association for State and Local History Conference in St. Paul, September 17-20, 2014.
The City of Myrtle is an unsewered community in Freeborn County. Thirty-one of thirty-two properties are connected to a community straight pipe, which discharges raw sewage into Deer Creek, a tributary of the Cedar River and are classified as an imminent threat to public health (ITPHS). This project will provide cost-share assistance to 28 low income property owners, who are connected to the City of Myrtle community straight pipe, for construction of individual subsurface sewage treatment systems.
The proposal was to accelerate the protection of 1,220 acres of prairie grassland, wetland, and other wildlife habitat as State Wildlife Management Areas open to public hunting. Over the course of the appropriation, we acquired 11 parcels for a total of 1,484.05 acres which exceeded our total acre goal of 1,220 acres by 264.05 acres. Breaking down acres by ecological section we acquired 876 acres in the metro, 152 acres in the forest/prairie, and 456 acres in the prairie. We have a balance of $52,798 that will be returned to the Fund despite exceeding our acre goals.
The program was to accelerate the protection of 1,230 acres of prairie grassland, wetland, and other wildlife habitat as Waterfowl Production Areas open to public hunting in Minnesota. Over the course of the appropriation, we acquired 14 parcels for a total of 1,240.79 acres which exceeded our total acre goal of 1,230 acres by 10.79 acres. Breaking down acres by ecological section we acquired 160 acres in the forest/prairie and 1,080.79 acres in the prairie. We have a balance that will be returned to the Fund despite exceeding our acre goals.
Many of Minnesota's wetlands have been lost and the remainder degraded. The original proposal planned for 15,000 acres of wetland/shallow lake enhancement to provide critical habitat for each life stage of waterfowl and wetland wildlife. The six projects subsequently completed with this appropriation enhanced 13,800 acres of wetlands and shallow lakes in the Prarie and Forest/Prairie Ecosections of Minnestoa.
The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.
Reinvest In Minnesota (RIM) and Native Prairie Bank (NPB) coordinated to accelerate grassland protection efforts. Through this appropriation a total of 1,584 acres were protected. This included 604 RIM acres and 980 NPB acres. Easement acquisition focused on Minnesota Prairie Conservation Plan identified landscapes.
The Albert Lea Lake Management project replaced the previous Albert Lea Lake fix-crest dam with a 3-in-1 structure that included a rock riffle dam, a lake level management structure, and an electric fish barrier. The benefits from this project include improved aquatic and waterfowl habitat, invasive species management, and improved desirable fish populations.
Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.