Minnesota's Legacy

All Projects

Showing 1 - 28 of 28 | Export projects
Recipient
Pomme de Terre River Association JPB
2017 Fiscal Year Funding Amount
$431,587
Fund Source

The goal of the Pomme de Terre River Association (JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. The Pomme de Terre River is currently not meeting state water quality for sediment. The purpose of this project is to strategically work towards a 53% sediment reduction goal at the mouth of the Pomme de Terre River based on a Watershed Restoration and Protection Strategy document.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2020 Fiscal Year Funding Amount
$75,000
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure, and is not duplicated by any other source of funding. The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses. Funds are used for proven practices that prevent non-point source water pollution or solve existing water quality problems.

Anoka
Becker
Blue Earth
Brown
Carver
Clearwater
Cook
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Marshall
Martin
Morrison
Mower
Murray
Nicollet
Nobles
Olmsted
Otter Tail
Pipestone
Pope
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Stearns
Steele
Stevens
Todd
Traverse
Wabasha
Waseca
Washington
Watonwan
Winona
Yellow Medicine
Recipient
Emmons & Olivier Resources, Inc.
2019 Fiscal Year Funding Amount
$14,950
Fund Source

This project will result in the final the Bois de Sioux River Watershed Restoration and Protection Strategies (WRAPS) report and Total Maximum Daily Load (TMDL) study. This work order will authorize the consultant to address all comments received during the public notice period and produce the final WRAPS report for the Minnesota Pollution Control Agency's final approval and a final TMDL study for United States Environmental Protection Agency's (EPA) final approval.

Grant
Otter Tail
Traverse
Wilkin
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$62,485
Fund Source

This project involves the extension and update of the Hydrological Simulation Program FORTRAN (HSPF) model for the Bois de Sioux and Mustinka watersheds.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Wilkin
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$10,381
Fund Source

This project will address United States Environmental Protection Agency (EPA) comments on the preliminary draft Total Maximum Daily Load (TMDL) study and Minnesota Pollution Control Agency (MPCA) comments on the pre-public notice draft TMDL study and Watershed Restoration and Protection Strategy (WRAPS) report, and produce the public notice draft TMDL study and the public notice draft WRAPS report ready for public review and comment. Conduct one public meeting for each watershed to present public notice drafts of the TMDL study and WRAPS report for each watershed.

Grant
Otter Tail
Traverse
Wilkin
Recipient
Tetra Tech
2018 Fiscal Year Funding Amount
$49,925
Fund Source
Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$49,491
Fund Source

This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.

Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech Inc
2019 Fiscal Year Funding Amount
$89,477
Fund Source

The goal of this project is to extend existing Hydrologic Simulation Program FORTRAN (HSPF) models through 2017 for the following major watersheds: Redwood, Cottonwood, Watonwan, Blue Earth, Le Sueur, Pomme de Terre, Minnesota River-Headwaters, and Lac Qui Parle watersheds.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Murray
Otter Tail
Pipestone
Pope
Redwood
Renville
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Minnesota Department of Agriculture and Multiple local partners
2020 Fiscal Year Funding Amount
$3,000,000
2019 Fiscal Year Funding Amount
$3,000,000
2018 Fiscal Year Funding Amount
$2,000,000
2017 Fiscal Year Funding Amount
$2,500,000
2016 Fiscal Year Funding Amount
$2,500,000
2015 Fiscal Year Funding Amount
$1,500,000
2014 Fiscal Year Funding Amount
$1,500,000
2013 Fiscal Year Funding Amount
$132,830
2012 Fiscal Year Funding Amount
$173,380
Fund Source

The Minnesota Ag Water Quality Certification Program (MAWQCP) is a voluntary opportunity for farmers and agricultural landowners to take the lead on implementing conservation practices that protect water quality. Those who implement and maintain approved conservation practices will be certified and in turn obtain regulatory certainty for a period of ten years. This program will help address concerns about changing regulatory requirements from multiple state and federal agencies.

Statewide
Recipient
East Otter Tail SWCD
2019 Fiscal Year Funding Amount
$164,879
Fund Source

The goals of project are to: 1) engage stakeholders and the public in watershed management activities; 2) conduct microbial source tracking to determine the source(s) of E.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
Otter Tail, East SWCD
2020 Fiscal Year Funding Amount
$167,600
Fund Source
Otter Tail
Recipient
Otter Tail, West SWCD
2015 Fiscal Year Funding Amount
$290,616
Fund Source

This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.

Otter Tail
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$471,000
Fund Source

The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.

Becker
Otter Tail
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$75,000
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail River watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
East Otter Tail SWCD
2017 Fiscal Year Funding Amount
$52,556
Fund Source

This project will determine the condition of the water bodies in the Otter Tail River watershed, initiate public participation in the Watershed Restoration and Protection Strategy (WRAPS) development process, begin identification of potential stressors and priority management areas within the watershed, and begin development of initial drafts of the Total Maximum Daily Load (TMDL) study and WRAPS report.

Becker
Clearwater
Otter Tail
Wilkin
Recipient
University of Minnesota: Sponsored Projects Administration
2015 Fiscal Year Funding Amount
$80,322
Fund Source

This project will be the first of its kind Civic Engagement Cohort that focusses its efforts in an individual watershed. The Otter Tail River Watershed is scheduled to start a Watershed Restoration and Protection Strategy (WRAPS) in 2016 and as a component of that project, the cohort will provide the civic engagement requirement. The cohort will be comprised of 25-30 individuals located throughout the watershed who represent a broad spectrum of resource managers and citizens who are familiar with water quality and watershed management.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
Pomme de Terre River Association
2019 Fiscal Year Funding Amount
$18,302
Fund Source

The goal is to facilitate strategic networking, learning, and participation of targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to become aware of water quality issues and increase best management practice adoption to restore and protect water quality in the Pomme de Terre River watershed.  This goal will benefit the completion of the second cycle of the watershed approach by providing useful information important in the completion of Watershed Restoration and Protection Strategies (WRAPS) report.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Emmons & Olivier Resources, Inc.
2019 Fiscal Year Funding Amount
$38,292
Fund Source

This project will develop the Pomme de Terre Watershed Total Maximum Daily Load (TMDL) study for the second round of the 10-year watershed approach cycle in the Pomme de Terre watershed. This phase of the project will address 4 stream impairments and 3 lake impairments and produce a draft TMDL document. A second phase may be needed as the stressor ID report identifies more stream reaches with TMDL relevant stressors.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association JPB
2014 Fiscal Year Funding Amount
$274,816
Fund Source

The goal of the Pomme de Terre River Association (JPB) is to improve local water resources within the watershed through targeted voluntary efforts and build strong relationships with local landowners, producers, and citizens. Utilizing the State's first Watershed Restoration and Protection Strategy, the JPB has targeted and identified specific areas and activities required for marked water quality improvement.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Tere River Association
2017 Fiscal Year Funding Amount
$46,133
Fund Source

The Pomme de Terre River Association will partner with the Minnesota Pollution Control Agency to conduct water quality monitoring in the Pomme de Terre River Watershed. The purpose will be to determine if waters meet the states non-point source pollution standards. The data collected will be utilized to produce the cycle two Watershed Restoration and Protection Strategy (WRAPS) report and supporting documents for the watershed. Through the utilization of this funding a total of 11 lakes and 7 stream reaches will be assessed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Becker
Cass
Clay
Grant
Mahnomen
Norman
Otter Tail
Traverse
Recipient
Buffalo-Red River WD
2017 Fiscal Year Funding Amount
$168,000
Fund Source

This project will result in the development of three critical pieces of information. They include: 1. Development of restoration and protection strategies for all waterbodies in the district relative to the State's Non-point Source Funding plan 2. Use of PTMApp to tie the WRAPs implementation tables from the Buffalo and Red River Watersheds to targeted on-the-ground projects and practices that will provide measurable water quality improvements, and 3.

Becker
Clay
Otter Tail
Wilkin
Recipient
Otter Tail, West SWCD
2017 Fiscal Year Funding Amount
$54,800
Fund Source

Realizing the need for increased technical capacity in the field offices, the Becker, East Otter Tail and West Otter Tail Soil and Water Conservation Districts have developed an agreement that will increase technical capacity while minimizing costs to each district. The first step was taken in this agreement through the recent hire of a shared engineer. Currently, minimal survey grade equipment is owned by the districts. This grant will be used to purchase an integrated survey system.

Becker
Otter Tail
Recipient
International Water Institute
2016 Fiscal Year Funding Amount
$523,135
2018 Fiscal Year Funding Amount
$288,451
2019 Fiscal Year Funding Amount
$201,398
Fund Source

The International Water Institute (IWI) will monitor 42 sites (3 basin, 12 major watershed, and 27 subwatershed) in the Red River and Upper Mississippi River Basins intensively during 2016, 2017, 2018 and 2019. There will also be 5 sites in the Red River Basin where mercury samples will be collected in 2016 and 2017 and sent to Minnesota Department of Health for analysis. The IWI will collect water samples across the range of flow conditions targeting sample collection at times of moderate to high flow.

Beltrami
Cass
Grant
Itasca
Kittson
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2018 Fiscal Year Funding Amount
$125,000
2019 Fiscal Year Funding Amount
$125,000

This project is for Minnesota Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, to work with regional partners to promote understanding and protection of watersheds, and to organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$134,960
Fund Source

The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Itasca
Mille Lacs
Morrison
Otter Tail
Pine
Sherburne
St. Louis
Stearns
Todd
Wadena
Recipient
Area 2 - West Central Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The West Central Technical Service Area (WCTSA) serves 12 Soil and Water Conservation Districts (SWCDs) in west central Minnesota and has been experiencing increased workload due to greater requests from member SWCDs. This funding will sustain a limited-term technician and purchase related support equipment to assist landowners in implementing targeted, high priority practices that result in the greatest water quality outcomes.

Benton
Big Stone
Chippewa
Douglas
Kandiyohi
Meeker
Morrison
Pope
Stearns
Stevens
Swift
Todd