The goal of the project is the development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL.
The overall goal of this project is to perform water quality monitoring duties to accomplish MPCA’s SWAG monitoring efforts at the four sites listed in Section IV of this application for the Middle Minnesota River stream sites selected in Renville, Redwood and Brown counties and allow for the assessment of aquatic life and aquatic recreation use for those reaches of the minor streams.
The goal of this project is to assess water quality in the following Anoka County waterbodies: Minard Lake, Pickerel Lake, Trott Brook, Seelye Brook, Cedar Creek, and the Rum River.
This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.
This project will monitor six sites within the Minnesota River Basin: Hawk Creek near Maynard, Hawk Creek near Granite Falls, Beaver Creek near Beaver Falls, Yellow Medicine River near Granite Falls, Yellow Medicine River near Hanley Falls, and Spring Creek near Hanley Falls. The sites will be monitored according to MPCA’s Major Watershed Load Monitoring (WPLMN) Standard Operating Procedure, which is the procedure being followed for sites currently monitored by the Hawk Creek Watershed Project (HCWP).
This project will obtain spatial and long-term pollutant load information from the Root River watershed in Southeast Minnesota. To accomplish this, the Fillmore Soil and Water Conservation District (SWCD) will assist the MPCA with water quality monitoring and annual pollutant loading calculations. Approximately 25 grab samples will be collected/site/year at 5 sites within the Root River watershed (totaling 125 grab samples/year). Annual load calculations for each site will be determined using the FLUX32 model.
This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.
Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.
To provide comedy ventriloquism and variety marionette shows and provide accompanying workshops on the construction and use of sock puppets. Puppets are a powerful way of bringing story to life and appeal to adults and children alike. The show will stimulate imagination and allow children to learn through play.
This project is for two years of condition monitoring, data management, and project oversight for five stream locations within the Rum River major watershed. The monitored streams include Rum River, Trott Brook, Cedar Creek, and Seelye Brook. All sites are within Anoka County and have been previously sampled by ACD. At each site, ACD will assess the stream in accordance with the MN Pollution Control Agency's (MPCA) Intensive Water Monitoring Standard Operating Procedures (SOP). Data collected will be entered into EQuIS, and interim reports and final report will be submitted as due.
This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in six Minnesota watersheds.
The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.
This project will use the We Are Water MN traveling exhibit and the Minnesota Humanities Center's approach to community engagement, relationship building, and storytelling, to increase community capacity for sustainable watershed management in five Minnesota watersheds. The following communities were selected as host sites for this project:
Winona (City of Winona), active hosting period: March 3-April 25, 2022
Lake City (Lake Pepin Legacy Alliance), active hosting period: April 28-June 20, 2022
This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River
This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.
This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.
This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed. The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA.
To restore several Dakota City building exteriors on the fairgrounds, in collaboration with Dakota City Heritage Village. These local structures that portray a 1900 era rural village include the 1867 Vermillion Presbyterian Church, the belfry of the District 96 one room school, and the 1861 frame structure that was originally built as a school and most recently used as the millinery and dressmaker’s shop.
This project is to refresh the Cannon River Watershed Hydrologic Simulation Program FORTRAN (HSPF) model. The previous model was developed for the time period of 1995-2012. This phase will extend the model to include data through 2019. All time series data will be updated through 2019, land classification zones will be restructured, hydrology calibration will be updated as needed, and final reporting including technical memo and model package.
This project with the Cannon River Watershed Joint Powers Board will conduct lake and stream sampling for the watershed restoration and protection strategy (WRAPS) update in the Cannon River Watershed. This sampling will track changes from the 2011 results, along with fill in gaps, delist or keep an eye out for new impairments, and gather data for permitting. The sites of sampling were selected by the Minnesota Pollution Control Agency (MPCA) and will be looking at lake and stream chemistry and stream bacteria.
The goal of this project is to use a science-based and participatory approach to understanding and promoting conservation practices in the agricultural community.
The goal of this project is to apply the Hydrological Simulation Program FORTRAN (HSPF) model to evaluate scenarios to support potential management actions and implementation in the watershed, construct Total Maximum Daily Load (TMDL) studies, and to develop a conceptual site model of the lakes for understanding phosphorus release.
Complete section 3 of Watershed Restoration and Protection Strategy (WRAPS) document for the Cannon and Zumbro Watersheds and provide input to sections 1 and 2.
This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.
Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.
This project is for Cycle 2 of the Intensive Watershed Monitoring (IWM) process for the Lower St. Croix Watershed. Seven stream sites will be monitored by the Isanti Soil and Water Conservation District (SWCD), Anoka Conservation District, and Chisago SWCD. Sampling will be conducted in 2019 and 2020 and Chemistry and field observation data will be taken.
The City of Inver Grove Heights will remove PAH contaminated sediment from the 79th Street Pond. Approximately 2,300 cubic yards of sediment will be dredged and disposed of at the Pine Bend Landfill located in the City of Inver Grove Heights.
The Villa Park Wetland Restoration Project proposes sediment removal from 6 contiguous stormwater wetland treatment cells within the Villa Park Wetland system resulting in an additional 118lbs/yr of total phosphorus(TP) removal from water entering Lake McCarrons.
We have an old farm house that the Anoka County Historical society uses during the fair to demonstrate what it was like to live in the early 1900's. It is in need of some restoration. The first thing we are going to do is rebuild the entire front porch. That includes floor, railing, painting and possibly needing structural support underneath.
We are going to have a different balloon artist this year. We are inviting a southeast Minnesota resident to perform for our youth. We will also have The Red Letter Band, an inspirational country music band. They perform a variety of classic county hits and have prize giveaways for crowd participation. They provide a nostalgic opportunity to listen to music that all will enjoy.
The Legacy Grant funds will be used to enrich our guests with entertaining learning experiences. Funds will be used for all guests to learn a bit more of our history with a presentation by Rob Fairbanks, a Native American who motivates as he speaks to groups and teaches them of his life on the reservation and his ancestors way of life and how it relates today.
We would like to have our local blacksmith's guild members give demonstrations throughout the week of our fair in the blacksmith shop located in our Heritage Village on the fairgrounds. We could get many demonstrators to demonstrate the equipment that we have in our heritage village buildings such as spinning, weaving, quilting, and cooking. We also may have an opportunity to have a threshing demonstration by the local machinery men that meet here in Dakota County. We hope to contract a chainsaw artist and/or the Paul Bunyan Live show to have here the week of the fair.
The chainsaw artist would be able to give many demonstrations throughout the week of the fair. We will contract the Lumberjack show for all seven days of the fair and have lumberjack camps and shows. We will have scheduled three shows a day.
We will have a totally new experience for one of our afternoon events for the youth at the Fillmore County Fair this year. We plan to bring "Emotion in Motion," a mobile splatter paint experience to our fair. This will be a fully immersive artistic experience, that is easy and fun for youth. When finished they will have an original splatter painting for their walls. We try to incorporate new things each year at the fair to accompany the traditional events that fairgoers expect.
The farming of lumber is a huge part of Minnesota history. In fact the towns of Bemidji, Akeley, and Brainerd, Minnesota have each boasted themselves the birth place of the famous Paul Bunyan. It is our goal to remind community members of this rich Minnesotan tradition of tree falling by having a demonstration of lumberjacks (a free event) at the fair this year. At the end of the lumberjack event there will be time for kids to do hands-on learning and training of how our ancestors worked with wood, not only to build homes but to create a living.
The Contractor will assist in planning and executing the regular meetings of the St. Croix River Basin Team, including providing minutes of the meetings. Assist in the functioning of the priority issue subcommittees. Respond to public notices for re-issuances of NPDES permits, EAWs and other pertinent public notices, and participate in prioritized public meetings with local governmental units and water planning organizations.
The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).