This project will be a complete TMDL report for the Biota and Bacteria (E. coli) impairments for the Ann River Watershed. The water bodies associated with these impairments will then be removed from the MPCA’s impaired waters list, and implementation activities to restore the water bodies will begin.
A direct appropriation of $400,000 in FY 2010 and $600,000 in FY2011 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area.
This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.
The Contractor will assist in planning and executing the regular meetings of the St. Croix River Basin Team, including providing minutes of the meetings. Assist in the functioning of the priority issue subcommittees. Respond to public notices for re-issuances of NPDES permits, EAWs and other pertinent public notices, and participate in prioritized public meetings with local governmental units and water planning organizations.
This project will identify and compile existing nitrate data from groundwaters and surface waters in the Lower Mississippi Basin (LMB) generally and focus on the Root River Watershed. The purpose is to investigate the quantity and quality of existing nitrate data, and to organize it for use in comprehensive watershed strategy development (including assessment, TMDL computation and identification and study of nitrate sources and delivery mechanisms).
This project will build upon existing planning and implementation efforts already taken on in the project area. The collection of existing information will be used to complement water information in support of a more successful and sustainable water quality improvement and protection implementation program. This will be achieved by active civic engagement activities throughout Phase I of this project.
This project will complete an implementation plan, as required by the Minnesota Pollution Control Agency, for the Zumbro River turbidity TMDL project. It will also revise the Zumbro River Watershed Management Plan (completed 2007) to ensure it continues to reflect local needs, incorporates new information, and develops more effective linkages with related local, state and federal government programs.
Deer Creek has been identified as an impaired water body. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the creek to an acceptable level. The project also includes collection of any additional data needed for stream channel modeling scenarios.
Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.
Varney Lake is owned and maintained by the City of white Bear Lake as part of its stormwater collection system. The City will excavate approximately 10,000 cubic yards of polycyclic aromatic hydrocarbons (PAH) contaminated sediment from Varney Lake (which is located in a residential portion of the City) and manage the sediments on site by encapsulating the sediment in a berm covered with clean top soil. The encapsulated sediment will be managed as a solid waste in what the MPCA refers to as a limited use solid waste landfill (Facility).
This project will study the geologic controls on nitrate transport in southeast Minnesota's karst landscape and will also provide datasets for other projects over time.
This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.
Agricultural drainage is very prevalent practice in Dodge County and there is a need to implement practices to that will better manage flow and pollutant loads that are being contributed to nearby surface waters. This project involves the installation of a woodchip bioreactor on a tile-drained agricultural field, which will feature improvements in design, and monitoring scope, as compared to a previous bioreactor constructed in Dodge County in 2007.
This project will develop an Implementation Plan for restoring Lake St. Croix and impaired waters within the contributing watershed, and protect waters currently attaining water quality standards.
This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.
This project will create a high accuracy elevation dataset - critical for effectively planning and implementing water quality projects - for the state of Minnesota using LiDAR (Light Detection and Ranging) and geospatial mapping technologies. Although some areas of the state have been mapped previously, many counties remain unmapped or have insufficient or inadequate data. This multi-year project, to be completed in 2012, is a collaborative effort of Minnesota's Digital Elevation Committee and partners with county surveyors to ensure accuracy with ground-truthing.
The DNR has been charged by the legislature to develop rules that protect and manage the Mississippi River Corridor Critical Area (MRCCA) for natural resource, economic development, transportation, historic preservation, and other values. This project engages stakeholder groups in a public process to balance regulatory protections with local flexibility and control.
This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.
Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.
This project will replace a conventional 32 foot wide neighborhood street with a narrowed 22 -24 foot wide street that will include rain gardens, sidewalk, and boulevard trees. North St. Paul is using the term Living Streets to describe a new type of street that will eventually replace most of the city's existing streets. Living streets are narrower and have less pavement than existing streets. Reducing the width of existing streets reduces construction costs and assessments to residents. It allows room for the installation of rainwater gardens to treat stormwater.
This project will assist farmers across Southeast Minnesota by providing guidance on management of nutrient sources including livestock manure, commercial fertilizers, and legumes. This project is important because excess nutrients and bacteria are causing negative impacts to the quality of waters. Two Nutrient Management Specialists will work one-on-one with farmers to develop 70 plans each year. Over time, it is anticipated that the number of new nutrient management plans will decrease as acres with plans increase.
The glacial geology of Ramsey County includes many layers of impermeable and semi-permeable material that can protect aquifers from contaminated waters. Many municipal public supply wells exist to draw water from these aquifers to supply thousands of consumers on a daily basis. Unfortunately, abandoned/unused wells also penetrate the protective layers of glacial material and can "short-circuit" the natural protection our glacial geology can provide allowing unfettered movement of contamination to even deeper aquifers below the ground.
This project will provide the Minnesota Pollution Control Agency and Ramsey-Washington Metro Watershed District the information and tools necessary to improve water quality in Battle Creek Lake, Beaver Lake, Carver Lake, Keller Lake and Wakefield Lake through targeted phosphorus reduction activities in the watershed.
TMDL project in the Root River Watershed that will support surface water assessment, analysis of data, interpretation of southeast Minnesota's karst landscape, stressor identification, TMDL computation, source assessment, and implementation planning.
Imminent Health Threat (IHT) systems are those that are discharging improperly treated human waste onto the ground surface or into surface waters. In addition to the potential water quality impacts, untreated sewage has the potential to introduce bacteria and viruses into the environment. When IHT systems are identified, county or city staff assist the homeowners through the process required to bring their systems into compliance with the septic ordinance.
The Pine County SWCD project will collect complete sets of water quality data for the Kettle River and some of its tributaries and also collect complete sets of water quality data for six area lakes (Oak, Dago, Rhine, Elbow, Rock, and Lake Eleven).
This project will collect water quality data at eight stream sites in three of the MPCA targeted watersheds. The sites are located on Medary Creek, Flandreau Creek, Pipestone Creek (2), Split Rock Creek, Rock River, Poplar Creek and Chanarambie Creek. This project will also promote a citizens monitoring program and encourage individuals to participate in a monitoring program.
This comprehensive water sampling program will assess the water quality of six sites: two main points on the Rock River, two main tributaries to the Rock River, and two points where streams leave the state (Mud and Beaver Creek) for a period of two years.
This project will complete a chloride management plan which will lay out a strategy for addressing chloride impacts to our surface waters for the 7-county metropolitan area. This chloride management plan will satisfy EPA requirements for impaired waters, address waters not yet listed, and develop a strategy to protect waters that are currently meeting the water quality standards.
This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.
This project will provide modeling services to support the completion of the Typo Lake and Martin Lake Excess Nutrients TMDL report. A Total Maximum Daily Load (TMDL) report quantifies pollutant levels, identifies sources of pollution, and proposes ways to bring water quality back to an acceptable level.
This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).
This project will develop a watershed restoration plan that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed. It will also an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.
Project partners play a vital role in the implementation of the Verdi Wellhead Protection Plan and have made this water source a priority in lowering nitrate levels. The aquifer used by the wells in the Verdi Well Field consists of a sand and gravel horizon about 30' thick which overlies clay-rich till. The geological sensitivity in all five of the Verdi wells is classified as "high".The Verdi Well Field supplies water to ten community water suppliers, 34 large rural users, and 1,126 rural hookups. Total population served by this water supply is about 7,500.
This program supports communities as they plan and implement projects that address emerging drinking water supply threats. It supports the exploration cost-effective regional and sub-regional solutions, leverages inter-jurisdictional coordination, and prevents overuse and degradation of groundwater resources.
Activities in this program provide metro communities with: