Add WHP information on City website; Include WHP strategies and actions in the City newsletter; Move leaf composting site from the 1-year TOT area; Survey and well inventory; Survey shallow disposal wells; Training about BMP in the DWSMA
Seal abandoned, 14 unused public wells; Update GIS well database; Educate students; Water festival; Educate storage tank owners; Develop "Groundwater News" newsletter
Install fencing around municipal well site; Update PCSI; Contact Randolph Township and Dakota County regarding land use permits and zoning; Research to identify site for new municipal well
Seal test well; Coordinate hazardous waste day; Promote proper rates and application of fertilizer; Provide tours of the municipal water treatment plant
This project will collect water quality data in the Lake Superior South watershed as part of the Watershed Restoration and Protection Strategy (WRAPS) development for Minnesota waters. South St. Louis Soil and Water Conservation District (SWCD) staff will conduct all monitoring in accordance with Intensive Water Monitoring (IWM) Standard Operating Procedures (SOP). South St. Louis SWCD staff have extensive experience in stream sampling techniques, including work performed under a St.
To provide new arts programming at the South St Louis County Fair. Programming will include a Bluegrass band, barbershop quartets, and children’s music.
This project will support the review of all public comments submitted for the Buffalo Creek TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.
The project will realign portions of the creek in its historical channel, restoring its meander pattern and in-stream habitat by using bioengineering techniques. The techniques included root wads and biologs for streambank protection, vegetated reinforced soil stabilization for streambank stabilization, boulder rock vanes for grade control and in-stream flow control, and constructed riffles and pools for in-stream habitat.