Update PCSI
Purchase electrical switch gear and generator for well site.
Purchase of spill kits for the Fire Dept. first response vehicles.
Purchase GPS technology. Purchase nitrate testing equipment.
Seal 2 unused wells in the DWSMA. Remove underground storage tank.
Locate well and seal if found. Video log well #2.
Repairing/Updating well house to code.
Purchase generator.
Seal well 3A
Construct well. Seal well.
Develop content/maps/and input material for GIS story map. WHP evaluation. Update list of storage tanks and send mailer to owners.
Prepare and mail information to owners of chemical storage and hazardous waste generator properties. Educate owners of properties and the general public about the city's Wellhead and SWP.
Refurbishing existing well and pump due to system pressure problem as advised by MDH Engineer.
Drill new well. Seal old well #260903.
Well construction. Well sealing. Hook up to existing plumbing..
Select an alternative well site.
Repair existing well. Seal old well.
Promote proper well sealing to owners. Provide fact sheets on Class V wells. Send letters to owners of active storage tanks.
Seal unused well.
Well Construction. Seal old well.
Installation of automated monitoring equipment in the city wells.
Seal old well #1 (Unique #267548) along with 2 other unnamed sandpoint wells.
Seal a unused community well just outside the DWSMA.
Determine the well location, well design, and oversight of well construction and development. Installation of an observation well.
Develop content and maps for GIS story map. WHPP evaluation. Distribute WM mailer.
Replace filtration system and cartridge.
Seal a 6" -140' deep well.
Replace pump & communication controls for wells and tower.
PHASE TWO of sealing 8 inch City of Pine City municipal well.
Seal irrigation well. Connect 2 remaining wells.
Construct a new well.
Purchase and installation of switch gear and wiring.
Purchase and install a VFD on well #9.
Investigate well #2. Conduct feasibility study.
Install gates with barb wire on gates and fence.
Pull pump and seal well. Furnish and install level transmitters.
Provide second half annual rent payment to landowner. Field prep and mowing. Combining, drilling and seeding.
Seal (1) 264-foot deep lake augmentation well formerly used at Bush Lake.
Replace a shallow driven well (Sandpoint) well with a drilled well.