Throughout FY12 and FY13, Minnesota Historical Society staff members have reached out to and met with many groups and individuals to gather their opinions and recommendations regarding an exhibit on and the commemoration of the U.S.-Dakota War of 1862. Staff met with tribal councils in Minnesota, Nebraska and South Dakota, individuals from tribes in Minnesota and throughout the Midwest and residents of Brown and Nicollet Counties. In addition, the Society sponsored the "We Gather Together As One" Dakota nationwide conference in Minneapolis and St.
This project acquired 84 acres of conservation easements along the Mississippi, Cannon and Vermillion Rivers. Through amendments, the acquisition acreage was decreased from the original proposal, due to landowner changes and project withdrawals. This project also restored/enhanced 220 acres within associated habitat corridors. Through amendments, the restoration/enhancement acres were increased from the original proposal by adding specific restoration projects.
2010 Grant Activities Plan and implement a five-day immersion methodology training session for 20 Dakota participants, with a follow up weekend workshop. Create a thematic based immersion curriculum, along with assessment tools, for Dakota learners that will be available in print and via an interactive web page. Implement two successful intergenerational immersion sessions for a total of 80 participants, by hiring/training leaders and staff. Grant Amount $100,000
This project will complete a TMDL equation and report and an implementation plan for Deer Creek. The TMDL report will describe turbidity impacts to aquatic life uses of Deer Creek, correlate turbidity to other pollutants (sediment, suspended solids, etc.), describe and quantify unique turbidity/sediment stressors which include groundwater influences, legacy impacts of the watershed and stream channel, significant in-stream and near stream sources (slumps, bank erosion, etc.) and upland contributions.
Create user-friendly, research-based energy storage guide and decision tools (print and web-based) for community-scale sites with renewable energy and do three geographically dispersed battery storage demonstration projects, through broad stakeholder-expert engagement.
This project will develop a watershed wide Total Maximum Daily Load (TMDL) study and River Eutrophication Standard (RES) TMDL report for water quality impairments in the Des Moines River basin, which includes the Des Moines River Headwaters, Lower Des Moines River, and East Fork Des Moines River watersheds.
Mississippi River Regional Trail, design and reconstruct bituminous trail segment from Anoka County Riverfront Regional Park to 37th Avenue. (6 of 6 projects financed with grant.)
Rice Creek West Regional Trail, design and reconstruct entrance drive parking lot and sidewalks in Manomin Park trail head. (5 of 6 projects financed with grant.)'
Project will complete the design and engineering required for renovation of the bathroom buildings and the boat rental building within the main day-use recreation area of Baker Park Reserve
Design, engineer and reconstruct rest rooms building, maintenance garage, driveway, sidewalks, lighting, utilities, associated storm water improvements including demolition, grading, curb and gutter, paving, retaining wall construction and landscaping at the Hyland-Bush-Anderson Lakes Regional Park Reserve.
Design, engineer, and construct Hall's Island and the Park on the Scherer Site within Above the Falls Regional Park, based on the Metropolitan Council approved Master Plan for that park.
Implement the Water Works portion of the 2015 Central Mississippi Regional Park master plan pending adoption by the Metropolitan Council. Work will include design, engineering, and construction of trails, pedestrian/bicycle/vehicle circulation, landscaping improvements, ramps, stairs, and walls, buildings, stormwater management, historic resources, neighborhood connections, and natural habitat restoration.
Design & engineering to develop building plans for a addition to the Nature Center, Sugar Shack, Garden House, Shelters, and Maintenance Facility. Develop site plans for gathering nodes, observation, amenities, trails, landscaping, signage, stormwater management; initiate construction for site related improvements such as trails, gathering nodes, nature observation, signage, landscaping, and site amenities. Supplement construction costs for amenities on the Campus Site and Infrastructure project.
Design, engineering and construction of a picnic shelter with restroom facilities. Site work will include grading, erosion control, and stormwater management.
Project includes additional design, engineering, easements, potential acquisitions, construction of safety improvements related to the regional trail project specifically at intersections of the trail and private businesses and rail properties.
Design, Engineering, Construction Administration and Construction of 4.6 acres of paved parking lots and 1.5 miles of paved roads within Lake Minnetonka Regional Park.
Project will complete the design and engineering necessary to construct 3.4 miles of paved trail connecting Lowry Nature Center in Carver Park to Lake Minnetonka Regional Park