The goal of the Lake Volney Targeted Restoration project is to improve the water quality draining to Lake Volney, which is impaired for excess nutrients. The project contains eight priority areas and will install a variety of Best Management Practices, including stormwater basins, ag retention, wetland enhancement, and more.
The sixth largest fresh water lake in the United States, Lake of the Woods has sustained significant shoreline erosion through a number of high water events, high inflows from the Rainy River, sustained strong NW winds, and erodible soils on the southern shore. This project implements strategies to protect and enhance private shoreline on the lake by addressing long-term shoreline management.
This is a joint grant application from the Riley-Purgatory-Bluff Creek Watershed District (RPBCWD) and the City of Chanhassen. In 2010, the Minnesota Pollution Control Agency listed Lake Susan as a shallow lake impaired for excess nutrients. A 2013 report recommended a project located at the park pond immediately northwest of Lake Susan as the most cost-effective watershed implementation project. The project calls for an outlet control structure at a higher elevation that will provide increased dead pool storage and the installation of a Minnesota Filter to treat dissolved phosphorus.
This project will address the nutrient impairment of Lake St. Croix through the installation of targeted stormwater treatment best management practices as prioritized in the 2014 Lake St. Croix Direct Discharge Stormwater Retrofit Assessment. The project will install up to 16 Low Impact Development practices to reduce pollutant loading to Lake St. Croix by at least 8.0 pounds phosphorous and 3,000 pounds sediment and 1.0 acre foot of stormwater per year.
This project will improve the water quality of Lake Rebecca in Lake Rebecca Park Reserve, and improve the fish habitat in the premier muskellunge brood stock lake in Minnesota. Water quality improvements will be achieved through a combination of management activities in the watershed to reduce phosphorus inflow to Lake Rebecca, control of the invasive species curly-leaf pondweed, stabilization of eroding shorelines, and application of alum (aluminum sulfate) to reduce internal phosphorus loading.
This project will provide monitoring of four of the major watersheds (8-digit Hydrologic Unit Codes) in the western part of the Rainy River Basin. Staff from the Lake of the Woods SWCD will conduct water quality sampling, review, manage and provide collected data to the Minnesota Pollution Control Agency (MPCA).
This project will repair and upgrade the water control structure and provide water quality enhancement measures on Oasis Pond in Roseville, Minnesota. This project will also protect the quality of downstream receiving waters; specifically Lake Johanna, by reducing phosphorus pollutant loads.
This project will provide information about the amount and sources of phosphorous flowing into Lake St Croix by implementing additional water quality monitoring and reduce the amount of phosphorous flowing into Lake St Croix by implementing phosphorous reduction activities. The St Croix River Association (SCRA) will coordinate with the St. Croix Basin Water Resources Planning Team (Basin Team) on the identification and funding of comprehensive water monitoring and phosphorus reduction activities in the Lake St. Croix portion of the St.
Phase 4 of the Lake Winona Total Maximum Daily Load (TMDL) project will finalize the draft Lake Winona TMDL, dated November 2009, by completing additional data analysis, lake quality modeling, updating the TMDL report, and supporting the public involvement process.
Acquire 26-acres with 8,000 feet of lake shore located 2 miles west of the city of Alexandria. This will be the first phase of a larger acquisition totaling 136 acres. The property is bisected by the Central Lakes Trail and contains unimproved uplands, high hills, scenic vistas, small wood lots and wetlands.
The Lake of the Woods (LOW) Total Maximum Daily Load (TMDL) study will: (1) identify water quality goals for the Minnesota portions of the LOW/Rainy River Watershed; (2) recommend nutrient allocations to achieve TMDLs where waters do not meet standards; and (3) provide opportunities for stakeholders to engage in the process of watershed-management planning to adopt protection and restoration strategies. The project will include existing in-lake and watershed model updates, TMDL component development, restoration plan development, and public participation.
The main purpose of this project is to provide fiscal resources for Lake County Soil and Water Conservation District (Lake County SWCD) to be engaged and participate in efforts for civic engagement in the Lake Superior South (LS South) Lake Superior North (LS North) watersheds and lead and carry-out civic engagement in the early stages of the Watershed Restoration and Protection Strategies (WRAPS) process in the Cloquet River watershed.
Update previous draft Total Maximum Daily Load (TMDL) documents and modeling files with Environmental Protection Agency (EPA) comments and site specific standards.
The goal of this project is to gain information about the amount and sources of phosphorous flowing into Lake St Croix by implementing additional water quality monitoring and/or to reduce the amount of phosphorous flowing into Lake St Croix by implementing phosphorous reduction activities.
The Minnesota Pollution Control Agency (MPCA) is a co-sponsor and assists with a portion of the financial support for the International Rainy River-Lake of the Woods Watershed Forum.
This project will dentify critical pathways and areas on the landscape that contribute a disproportionate amount of sediment stressors to selected streams located in LS South and/or LS North HUC 8 watersheds. Unlike other HUC 8 watersheds with one mainstem stream and nested tributaries to the mainstem, LS South and North consist of numerous individual streams flowing to Lake Superior. Each of these streams has a mainstem, tributaries flowing to the mainstem and a surrounding watershed.
Complete renewal of the main lakeside campground and construction of a new campground to relieve pressure on existing lakeside campground. New camping areas will open Memorial Day 2011.
The biological communities present in a lake are the result of cumulative effects of natural and human-caused influences within the entire area of land and water that flows into the lake (i.e., the watershed). Biological assessments are used on lakes to identify water pollution and habitat concerns based on the type and abundance of selected animals and their habitats. Certain species cannot survive without clean water and healthy habitat while other species are tolerant of degraded conditions.
Past and current monitoring data has shown Ramsey County's Lambert Creek has high levels of total phosphorus (TP), anywhere from 0.14 mg/L to 0.30 mg/L, which is above the proposed State standard of 0.10 mg/L for streams in the Central Region.
This program is to restore acres of state parks and trails land to native plant communities. MS 86A.05 directs PAT to preserve, perpetuate and restore natural features in state parks that were present in the area of the park at the time of European settlement. Approximately 31 restoration projects have been completed, are in progress, or will be implemented in the spring of 2012, at over 20 state park units. These projects total 1,283 acres.
The project goal is to enhance the Ojibwe language skills of the Minisinaakwaang young people interested in learning and carrying on the traditions of the community. This initiative will increase the number of young people using the language and ensuring that our ceremonies are conducted in the Ojibwe language. The grantees approach connects the first language speakers of the Minisinaakwaang community with the Ojibwe language apprentices that have made an investment in their ceremonies.
The goal of this project is to expand Ojibwe language class availability on the Bois Forte Reservation in terms of both the number and levels offered. This project will use local experts and form partnerships with existing language preservation programs to implement a plan to address the revitalization and preservation of the Native language on the Bois Forte Indian Reservation. The long term goal s to increase the Oibwe language fluency, proficiency, and literacy of the Bois Forte Indian Community. A local Elder language expert wil be hired at 16 hours per week.
The ISD 361 Indian Education Project will continue to work closely with the local school district, Indian education staff, and parent committee members in the evaluation process. The goal of this project is that American Indian secondary student participation in Ojibwe language and culture classes. Data will be reported to and reviewed by ISD 361 Indian Education program committee staff and parent committee quarterly. Tests will be administered. Attendance will be captured, and all date will be kept on file.
This project is a cooperative effort between Crow Wing and Itasca County to contract with RMB Laboratories to generate 65 lake assessment/trend analysis reports. The watershed protection model is an innovative and proactive approach to water resource management which is geared towards prioritizing areas of concern, targeting implementation strategies, and measuring their effectiveness. These assessments are also useful and understandable tools for lake associations and the public.
to design and install a solar hot water system at Lebanon Hills Campground Restroom and Shower Building along with an interpretive display to inform visitors how the hot water is generated
The main outcome of Phase III of the project will be the final deliverable of a WRAPS report that will prescribe the restoration and protection strategies for the surface water resources within the Leech Lake River Watershed. The WRAPS will provide the analytical and strategic foundation which will be essential in protecting the surface water resources within this high quality watershed. Along with the development of the WRAPS report, this project will support the development and completion of the MPCA Stressor ID and Watershed Assessment reports to be completed for this watershed.