This project will provide information and tools for a method to credit street sweeping that can be implemented by Municipal Separate Storm Sewer (MS4) permittees to help meet permit requirements for phosphorus and total suspended solids (TSS). The contractor will develop and submit a communication-outreach plan for the credit method.
The project will work with county and Waseca Soil and Water Conservation District staff to increase knowledge and participation in the Watershed Approach efforts and provide input to the Watershed Restoration and Protection Strategies (WRAPS) document.
Swedish Immigrant Regional Trail connection through Interstate Park to Taylors Falls City Hall. Build 180 bridge and trail segment A&B as illustrated. Segment C reviews and engineering only.
Swift Soil and Water Conservation District plans on monitoring seven stream sites of the Chippewa River Watershed within Swift county. Through this process we hope to assist the Minnesota Pollution Control Agency (MPCA) in identifying sites in this study area that are either improving or degrading in water quality.
The Crow Wing County (CWC) Water Plan identifies Island-Loon Lake as a priority lake to enhance due to its significant decline in water clarity and high ratio of impervious surface surrounding the lake. To mitigate the runoff, the Crow Wing Soil and Water Conservation District will partner with the CWC HWY Department, City of Crosslake, Crosslakers, and Whitefish Area Property Owners Association to install three mechanical separators and 13,500 square feet bioretention area that will reduce six pounds of phosphorus and 1 ton of sediment per year from entering the lake.
This project will educate and also encourage residents to join the Le Sueur County cost-share well sealing program to provide assistance in sealing unused/abandoned wells.
With the proposed project, the Pomme de Terre River Association will target catchments delivering the highest 25% of sediment from agricultural land and identified priority management zones for storm water runoff (identified in the Watershed Restoration and Protection Strategy). Implementation is estimate to reduce sediment runoff to prioritized water bodies by 14,690 tons per year and phosphorous by 12,270 pounds per year.
Ojibwemotaadidaa Omaa Gidakiiminaang - will train five staff members in the language and practice of traditional activities associated with babies and parenting, led by knowledgeable elder-first speakers with years of experience. Staff members will spend a total of 16 days with four elder-first speakers engaged in language associated with pregnancy, birthing, newborns, infants, toddlers, cradleboard, moss bags, baby swing, and baby rattles. We will make audio-video recordings of these training sessions to have as a detailed record and reference tool.
Three streambank stabilization projects have been identified as high priority projects in the Thief River Falls Water Quality Study completed in 2017. The proposal will use a combination of bendway weirs, toe protection by building a floodplain bench and live stake plantings. It has been estimated that a total of 385 tons per year of sediment from these three locations is entering the river contributing to the impairment downstream.
This project strives to continue progress towards the sediment and nutrient reduction goals for the Buffalo River. Specific targeted practices and quantities include Water and Sediment Control Basins (110), Grade Stabilizations (7), Grassed Waterways (10), Critical Area Plantings (12), Filter Strips (45 ac.), Cover Crops (2,500 ac/year), Rotational Grazing/Use Exclusion (320 ac), Wetland Restoration (86 ac).
This project will make updates to existing information and incorporate new information into the Minnesota Stormwater Manual including monitoring, modeling, and pond assessment guidance to assist permittees in satisfying the municipal stormwater (MS4) permit requirements and water quality case studies for MS4 permittees.
Project to include trail improvements between T.H. 61 to Bruce Vento Trail including design, engineering, demolition, grading, stormwater management, paving, landscaping and retaining wall construction as required.
Supplement improvements for a trailhead facility south of Co. Rd. I including design/engineering, construction, demolition, grading, landscaping, trails, parking, building, roads, stormwater management, utilities, signage, site and play equipment, amenities, habitat restoration, access to the water trail, lighting.
Minnesota's twelve regional library systems, which encompass more than 350 public libraries in all areas of the state, can benefit from a portion of the Legacy Amendment's Arts and Cultural Heritage Fund. Through State Library Services, a division of the Minnesota Department of Education, each regional library system is eligible to receive a formula-driven allocation from the annual $2.5 million Minnesota Regional Library System Legacy Grant. Traverse des Sioux Library System (TdS) is a federated regional public library system providing central services located in southcentral Minnesota.
This project will build off the success of the additional geographic information system (GIS) and water planning expertise the TSA8 added in 2016 to provide consistent mapping, water planning assistance and training to partners. This project will help soil and water conservation districts prepare for the 1W1P process before the planning starts. A unified protection methodology is essential for the 1W1P process to be successful. This project will include: unified GIS mapping and protection model for all nine counties respectively.
This project is the second phase of updating the Two Rivers watershed Hydrologic Simulation Program FORTRAN (HSPF) model. This project includes calibration of the model and including a proposed impoundment in the model. An analysis of possible downstream water quality impacts will also be done.
The primary objective of this project is to extend the simulation period of the Two Rivers Watershed Hydrological Simulation Program FORTRAN (HSPF) model through 2017 to support future simulation and assessment of the planned Klondike impoundment.
The City of Hallock, with funding from LSOHC, restored and enhanced habitat to facilitate fish passage by retrofitting the existing Hallock Dam on the South Branch of the Two Rivers and re-established a stable riffle-pool habitat downstream. In addition to the fish habitat improvement , the project has provided enhanced recreational opportunities for paddlers along the river.