Bejou, Shoe and Dahlberg lakes are located in the upper reaches of one of the most popular fisheries in the region, the Cormorant Lakes chain.
Water quality issues impacting Bejou Lake were identified through the use of aerial photography. Results determined that a significant amount of sediment was being deposited into Bejou Lake from the 84 acre adjacent watershed. Several areas where water, sediment and erosion control basins could greatly reduce the amounts of sediments being delivered to the lake were identified.
An existing shelter and restroom facility will be replaced by a new multi use building at Cottage Grove Ravine Regional Park. The building may include restrooms, storage space, multi-purpose lobby space, equipment staging area and fire ring.
The Cottonwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.
To offer multi-cultural and multi-generational history and music exhibitions. A lumberjack show will highlight the experience of early settlers, and folk-music and a polka performances will promote intergenerational and intercultural amity.
The County Well Index (CWI) contains well and boring records wells within Minnesota; over 400,000 records. It is the principal source of well construction information and geologic interpretations of well records and also contains soil boring records, mineral exploration test hole records, and scientific/research test hole records.
Redevelop access routes, docks, fishing pier, 4 shelters, and shower building. Add accessible tables, benches, and grills to beach area and along trail. Plant trees along ditch.
The Minnesota Pollution Control Agency (MPCA) offers grants to counties for Subsurface Sewage Treatment System (SSTS) program administration and special projects to improve SSTS compliance rates, and assistance for low-income homeowners with needed SSTS upgrades. The MPCA will determine grant allocations based on applications review; funds will flow to counties through the Board of Water and Soil Resources' Natural Resources Block Grants.
The DNR works with the Minnesota Geological Survey (MGS) to convey valuable geologic and groundwater information and interpretations to government units at all levels, but particularly to local governments, private organizations and citizens. The MGS focuses on geology (Part A reports) and DNR focuses on groundwater (Part B reports). These provide useful information for projects completed by community planners, industry, agriculture, citizens and state agencies related to groundwater.
Research shows that traditional teaching tools, such as textbooks and lectures, don't fully engage today's students who have grown up surrounded by technology and who use it in their daily lives. This biennium, an additional four Minnesota Historical Society historic sites are improving their service to "21st Century Learners" and their teachers and parents.
Nearly 700 miles of open water flow through Faribault County's borders. Over one-third of these miles are artificial drainage systems. Artificial drainage systems are necessary to remove excess precipitation and improve the productivity of agricultural land, however they also have a direct effect on the water quality and quantity of receiving waterbodies. With limited resources available to manage these systems, innovative and efficient management tools will play a critical role in targeting improvements for water quality.
To better highlight local talent by making the exhibits of the creative activities more visible and engaging to fair visitors. Funds will be used to improve lighting by upgrading wiring and fixtures, adding electrical hookups to allow spotlights on specific displays, and installing a glass board.
Through this grant, the Minnesota Land Trust protected approximately 8.25 miles of critical shoreland and 1,095 acres of high-quality fish and wildlife habitat in northeast Minnesota by securing four permanent conservation easements in strategic locations along priority lakes and rivers, exceeding our land protection goals by 332% and shoreland protection goals by 825%. Conservation easements secured under this program are perpetual and will prevent fragmentation and destruction of existing habitat.
The St. Croix River is a national Wild and Scenic River. The river continues to see a decline in water quality due to elevated nutrient levels. Erosion of gullies along the river contribute large amounts of sediment and nutrients to the river.
The goal of this project is to offer grant funding to boat marinas located in Washington County on the St. Croix River to complete water quality improvement projects. St. Croix marinas own large amounts of shoreline plus there are roads, parking areas, buildings, and garages. These all produce runoff that drains directly into the St. Croix River. Marinas also often include pollution hotspots due to the presence of boat fueling areas.
This project will include lake and stream monitoring on 7 lakes and 3 streams found within the Pine River watershed. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites for 2012. One of the goals in the Crow Wing County (CWC) Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).
The Crow River is a major river system in Wright County that is of local and regional significance. It is a major recreation area in its own right but also flows into the Mississippi River 20 miles from the Minneapolis Drinking Water Plant intake. Elevated sediment levels in the river increases the cost of treating the river water and threatens fisheries habitat.
This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.
To bring a variety of cultural entertainment to the Waseca County Free Fair, including yodeling, Bluegrass, Irish, Alpine, Czechoslovakian, gospel and Americana music, a vaudeville show, and genealogical information from the Minnesota Historical Society.
To provide educational and entertaining events that showcase the many diverse cultures of Stevens County, and purchase a sound system to enhance performances and demonstrations.
During the 2016 Legislative Session, the Minnesota State Legislature asked the Minnesota Humanities, $75,000 the first year is for a grant to the city of St. Paul or Ramsey County to develop and install activity facilities in parks for Takraw courts that are reflective of the current demographics in Ramsey County. This grant is available if the recipient provides at least a 25 percent match for funding.
This project acquired ~40 acres of land for the Cuyuna State Recreation Area, and may serve to expand recreational trails or other amenities in the future.
This project will directly inform the Lake of the Woods (LoW )TMDL process by identifying nutrient reduction targets, a timeline of phosphorus loadings to the lake, and measures of historical in-lake variability (e.g., nutrients, biological communities). Results will complement and build on ongoing research efforts on internal loading and sediment core analysis.
This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.
Chisago County will coordinate up to three community dialogue meetings to inform its water planning decisions. The goal of the meetings will be to provide safe, productive and effective venues for citizens to become authentically engaged in the water planning process. The outcome of this Civic engagement work with Chisago County and their county water planning process will be a more engaged public in the County Water Planning Process.
This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).